August 31, 2006 Mr. Paul A. Harden Site Vice President Nuclear Management Company, LLC Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
PALISADES NUCLEAR PLANT
Dear Mr. Harden:
On August 7, 2006, the NRC staff completed its performance review of Palisades Nuclear Plant for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter was within the Regulatory Response column of the NRCs Action Matrix. This conclusion is based on the fact that the first submittal of Mitigating Systems Performance Index (MSPI) result for High Pressure Safety Injection was White during the second quarter of CY 2006.
We plan to conduct reactor oversight process (ROP) baseline inspections at your facility. Also, based on the one White performance indicator in the mitigating systems cornerstone, we plan to conduct a supplemental inspection using Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2008. We plan on conducting a triennial fire protection inspection, a component design basis inspection, and inspections associated with the potential for containment sump blockage. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.
Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.
P. Harden In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Christine Lipa at 630/829-9619 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Mark A. Satorius, Director Division of Reactor Projects Docket No. 50-255 License No. DPR-20
Enclosure:
Palisades Inspection Activity Plan DISTRIBUTION:
See next page
P. Harden In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Christine Lipa at 630/829-9619 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Mark A. Satorius, Director Division of Reactor Projects Docket No. 50-255 License No. DPR-20
Enclosure:
Palisades Inspection Activity Plan DISTRIBUTION:
See next page DOCUMENT NAME:G:\\Branch TSS\\ALL MOC\\midcycle 2005 to 2006\\palisades\\Palisades MOC Letter.wpd X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N RIII RIII NAME RLerch:dtp CLipa MSatorius DATE 08/17/06 08/28/06 08/31/06 OFFICIAL RECORD COPY
P. Harden cc w/encl:
J. Cowan, Executive Vice President and Chief Nuclear Officer R. Fenech, Senior Vice President, Nuclear Fossil and Hydro Operations D. Cooper, Senior Vice President - Group Operations L. Lahti, Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel and Secretary A. Udrys, Esquire, Consumers Energy Company S. Wawro, Director of Nuclear Assets, Consumers Energy Company Supervisor, Covert Township Office of the Governor State Liaison Office, State of Michigan L. Brandon, Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division Mayor of Bangor City Manager of Bangor Mayor of Hartford City Manager of Hartford Mayor of South Haven City Manager of South Haven Administrator, Allegan County Allegan County Sheriff Allegan County Emergency Management Coordinator County Coordinator Berrien County Sheriff Director, Berrien County Emergency Management Agency Chairman, Van Buren County Board Van Buren County Sheriff Director, Van Buren County Emergency Management Agency Mayor of Watervliet Mayor of Coloma INPO
P. Harden ADAMS Distribution:
LMP TEB RidsNrrDirslpab JLC1 GEG KGO RML2 SRI Palisades DRPIII DRSIII PLB1 TXN
Palisades Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 13:02:04 Report 22 2
- EP EXERCISE BASELINE Baseline Inspections 09/18/2006 09/22/2006 1
7111401 IP Exercise Evaluation Baseline Inspections 09/18/2006 09/22/2006 1
71151 IP Performance Indicator Verification 1
- RP POST-OUTAGE ACCESS CTRL/ALARA INSP Baseline Inspections 09/25/2006 09/29/2006 1
7112102 IP ALARA Planning and Controls Baseline Inspections 09/25/2006 09/29/2006 1
71151 IP Performance Indicator Verification 6
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 11/13/2006 12/15/2006 1
7111121 IP Component Design Bases Inspection 1
- RAM SHIPPING Baseline Inspections 11/27/2006 12/01/2006 1
7112202 IP Radioactive Material Processing and Transportation 1
- RAD EFFLUENTS Baseline Inspections 01/08/2007 01/12/2007 1
7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 01/08/2007 01/12/2007 1
71151 IP Performance Indicator Verification 1
EP BI
- BASELINE EP INSPECTION Baseline Inspections 04/23/2007 04/27/2007 1
7111402 IP Alert and Notification System Testing Baseline Inspections 04/23/2007 04/27/2007 1
7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 04/23/2007 04/27/2007 1
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 04/23/2007 04/27/2007 1
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 04/23/2007 04/27/2007 1
71151-EP02 IP ERO Drill Participation Baseline Inspections 04/23/2007 04/27/2007 1
71151-EP03 IP Alert & Notification System 3
FPI
- FIRE PROTECTION INSPECTION - TRIENNIAL Baseline Inspections 05/07/2007 05/25/2007 1
7111105T IP Fire Protection [Triennial]
1 HEATSINK
- HEAT SINK INSPECTION Baseline Inspections 05/14/2007 05/18/2007 1
7111107B IP Heat Sink Performance 1
MAINRULE
- MAINTENANCE EFFECTIVENESS INSPECTION Baseline Inspections 05/14/2007 05/18/2007 1
7111112B IP Maintenance Effectiveness 1
- REMP AND RAM CONTROL Baseline Inspections 05/21/2007 05/25/2007 1
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 1
- ACCESS CONTROL Baseline Inspections 07/23/2007 07/27/2007 1
7112101 IP Access Control to Radiologically Significant Areas 1
- HEAD REPLACEMENT Other Routine 07/23/2007 08/10/2007 1
71007 IP Reactor Vessel Head Replacement Inspection 1
- HEAD REPLACEMENT Other Routine 08/06/2007 08/24/2007 1
71007 IP Reactor Vessel Head Replacement Inspection This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Palisades Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 13:02:04 Report 22 1
FY 2007
- PALISADES INIT PREP 08/2007 Not Applicable 08/20/2007 08/24/2007 1
W90163 OL - INITIAL EXAM - PALISADES - AUG/SEP 2007 2
FY 2007
- PALISADES INIT EXAM 09/2007 Not Applicable 09/10/2007 09/14/2007 1
W90163 OL - INITIAL EXAM - PALISADES - AUG/SEP 2007 1
- ALARA - OUTAGE Baseline Inspections 09/10/2007 09/21/2007 1
7112102 IP ALARA Planning and Controls 1
- ISI BASELINE INSPECTION Baseline Inspections 09/10/2007 10/05/2007 1
7111108P IP Inservice Inspection Activities - PWR 2
MOD5059
- MODIFICATIONS/50.59 INSPECTION Baseline Inspections 11/26/2007 12/14/2007 1
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 11/26/2007 12/14/2007 1
7111117B IP Permanent Plant Modifications This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.