NRC CY2005 Annual Assessment Meeting, Brunswick, Southport, North Carolina, April 12, 2006
ML061030266
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/12/2006
From:
NRC/RGN-II
To:
References
Download: ML061030266 (19)


Text

NRC CY2005 Annual Assessment Meeting BRUNSWICK Southport, North Carolina Southport, North Carolina April 12, 2006 April 12, 2006

Purpose of Todays Meeting

    • A public forum for discussion of Brunswick A public forum for discussion of Brunswick performance performance
    • NRC will address Brunswick performance issues NRC will address Brunswick performance issues identified in the annual assessment letter identified in the annual assessment letter
    • Brunswick management will be given the opportunity to Brunswick management will be given the opportunity to respond to the information in the letter and inform the respond to the information in the letter and inform the NRC of new or existing programs to maintain or NRC of new or existing programs to maintain or improve their performance improve their performance

Agenda

  • Introduction
  • Review of Reactor Oversight Process
  • National Summary of Plant Performance
  • Discussion of Brunswick Plant Performance Results
  • Brunswick Management Response and Remarks
  • NRC Closing Remarks
  • Break
  • NRC Available to Address Public Questions

Region II Organization William Travers Regional Administrator Loren Plisco Deputy Regional Administrator Charles Casto Director Division of Reactor Projects Joseph Shea Deputy Director Victor McCree Director Division of Reactor Safety Harold Christensen Deputy Director Paul Frederickson Branch Chief Regional Specialists Brunswick Resident Inspectors Eugene DiPaolo Joseph Austin Senior Project Engineer Son Ninh

NRC Performance Goals Ensure protection of the public health and safety and the environment Ensure the secure use and management of radioactive materials PRIMARY GOALS OTHER GOALS

  • Ensure openness in NRC regulatory process
  • Ensure that NRC actions are effective, efficient, realistic, and timely
  • Ensure excellence in NRC management to carry out the NRCs strategic objective

Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas

Examples of Baseline Inspections z Equipment Alignment

~80 hrs/yr z Triennial Fire Protection

~200 hrs every 3 yrs z Operator Response

~125 hrs/yr z Emergency Preparedness

~80 hrs/yr z Rad Release Controls

~110 hrs every 2 yrs z Worker Radiation Protection ~90 hrs/yr z Corrective Action Program

~250 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr

Performance Thresholds Safety Significance Green:

Very low safety issue White:

Low-to-moderate safety issue Yellow:

Substantial safety issue Red:

High safety issue NRC Inspection Efforts Green:

Only Baseline Inspections White:

May increase NRC oversight Yellow:

Increased NRC oversight Red:

Increased NRC oversight and other NRC actions

Action Matrix Concept Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Cornerstone Unacceptable Performance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

National Summary of Plant Performance Status at End of CY 2005 Licensee Response 84 Regulatory Response 12 Degraded Cornerstone 4

Multiple/Repetitive Degraded Cornerstone 3

Unacceptable 0

Total 103

Brunswick CY2005 Inspection Activities

  • 2124 hours0.0246 days <br />0.59 hours <br />0.00351 weeks <br />8.08182e-4 months <br /> of inspection related activities
  • Resident inspector daily inspections
  • Maintenance inspections
  • Radiation protection inspections
  • Engineering design inspection
  • Problem identification and resolution inspection

Brunswick CY2005 Assessment Results

  • Both units performance were within the Licensee Response Column of the NRCs Action Matrix for the first three quarters.

Unit 1 remained in the Licensee Response Column for the fourth quarter but Unit 2 transitioned to the Regulatory Response Column.

  • All inspection findings were classified as very low safety significance (Green)
  • All performance indicators (PI) were Green with one exception

- Unit 2 Unplanned Power Changes per 7000 Critical Hours PI crossed the Green/White threshold in the fourth quarter.

CY05 White Performance Indicator CY05 White Performance Indicator

  • Unit 2 Unplanned Power Changes PI crossed Green/White threshold in fourth quarter 2005
  • Problem: Excessive amount of unplanned power reductions. PI defined as: The number of unplanned changes in reactor power of greater than 20% full-power, per 7,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of critical operation
  • Supplemental inspection scheduled in June 2006

Brunswick 2 Unplanned Power Change PI Unplanned Power Changes per 7000 Critical Hrs 1Q/04 2Q/04 3Q/04 4Q/04 1Q/05 2Q/05 3Q/05 4Q/05 Unplanned power changes 2.0 1.0 1.0 0

0 2.0 1.0 4.0 Critical hours 2184.0 2134.2 2139.8 2209.0 1510.0 2026.2 2064.8 2209.0 Indicator value 4.0 4.0 4.1 3.2 1.8 2.7 2.7 6.3

Brunswick Assessment Summary

  • Progress Energy operated Brunswick in a manner that preserved public health and safety
  • All cornerstone objectives were met
  • Other than one Supplemental Inspection, NRC plans only baseline inspections at Brunswick for the remainder of CY 2006

Brunswick CY2006 Scheduled Inspection Activities

  • Resident inspector daily inspections
  • Maintenance inspection
  • Engineering modification inspection
  • Engineering design bases inspection
  • Supplemental Inspection
  • Radiation protection inspections
  • Licensed operator requalification inspection
  • Heat sink inspection
  • Security inspection

NRC CY2005 NRC CY2005 Annual Assessment Meeting Annual Assessment Meeting BRUNSWICK Southport, North Carolina Southport, North Carolina April 12, 2005 April 12, 2005

Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:

(800) 695-7403 Allegation@nrc.gov z General information or questions www.nrc.gov Select What We Do for Public Affairs

Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free)