Text

67C77;zgX AUG 13 W4 Docket Nos.: STN 50-482 and 50-483 MEMORANDUM FOR:

FROM:

SUBJECT:

DATE & TIME:

B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing Joseph J. Holonich, Project Manager Licensing Branch No. 1 Division of Licensing Paul W. O'Connor, Project Manager Licensing Branch No. 1 Division of Licensing FORIHCOMING MEETING WITH UNION ELECTRIC COMPANY AND KANSAS GAS A ELECTRIC COMPANY Tuesday, August 14, 1984 1:30 p.m. - 5:00 p.m.

LOCATION:

PURPOSE:

Phillips Building, Room P-422 7920 Norfolk Avenue Bethesda, Maryland To appeal the staff's position on the SNUPPS Safe Shutdown Analysis (see enc'ited request).

PARTICIPANTS:

NRC V.-Houston W. V. Johnston T. Novak B. J. Youngblood V. Benaroya J. Holonich R. Eberly J. Wilson W. LeFave N. Fioravante M. Murphy C. Ramsey KG&E G. Rathbun, et, al.

UE A. C. Passwatcr SNUPPS M. Fletcher, et. al.

MtQLUA1. UCM9D1X Joseph J. Holonich, Project Manager Licensing Branch No. I Division of Licensing Lz~aX~uxDD I t) t;l

,\\.(Paul W. O'Connor, Project Manager t'E Licensing Branch No. I DIVIsion of Licensing B4o92o00o2^6 840o8' 2 CF ADOC CF cc:

ee next page J1 h:kab nnor 08/T /84 08/jg/84

\\Q

0'^ Pic,,

I I

I Dokt o.

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHIINOTON. D.C. 2055 AUG13 1984 STN 50-482 and 50-483 MEMORANDUM FOR:

FROM:

SUBJECT:

DATE & TIME:

B. J. Youngbloodr, Chief Licensing Branch No. 1 Division of Licensing Joseph J. Holonich, Project Manager Licensing Branch No. 1 Division of Licensing Paul W. O'Connor, Project Manager Licensing Branch No. 1 Division of Licensing FORTHCOMING MEETING WITH UNION ELECTRIC COMPANY AND KANSAS GAS & ELECTRIC COMPANY Tuesday, August 14, 1984 1:30 p.m. - 5:0t p.m.

LOCATION:

PURPOSE:

Phillips Building, Room P-422 7920 Norfolk Avenue Bethesda, Marylaind To appeal the staff's position on the SNUPPS Safe Shutdown Analysis (see enclosed request).

PARTICIPANTS:

NRC W7Houston W. V. Johnston T. Novak B. J. Youngblooi V. Benaroya J. Holonich R. Eborly J. Wilson W. Lefave N. Fioravante M. Murphy C. Ramsey I

KG&E G. Rathbun, at. al.

UE A. C. Passwater SNUPPS M. Fletcher, et. al.

de

5ZCRAII, Joseph 5. Ilolonich, Project Manager Licensing Branch No. 1
  1. %A.. A -

A I 4 Division or Licensing Paul U. O'Connor, Pro ect Manager Licensing Branch No.

n Division of Liconsing cc: See next page a

-I0IIII

SNfU PPS Mr. D. F. Schnell Vice President - Nuclear Union Electric Company P. 0. Box 149 St. Louis, Missouri 63166 cc: Gerald Charnoff, Esq.

Thomas A. Baxter, Esq.

Shaw, Pittman, Potts i Trowbridge 1800 M Street, N. W.

Washington, D. C. 20036 Kansas City Power A Light Company ATTN: Mr. D. T. McPhce Vice President - Production 1330 Baltimore Avenue Kansas City, Missouri 64141 Mr. Nicholas A. Petrick Executive Director, SNUPPS 5 Choke Cherry Road Rockville, Maryland 20850 Fr. J. E. Birk Assistant to the General Counsel Union Electric Comeany St. Louls, Missouri G31GG Mr. Howard Bundy Resident Inspector/Wolf Creek NPS c/o U. S. NRC P. 0. Box 311 Burlington, Kansas 66839 Mr. Michael C. Keener State Corporation Commission State of Kansas Fourth Floor, State Office Building Topeka, Kansas 6612 Mr. John fleisler U. S. Nuclear Regulatory Commission Resident Inspectors Office RR J1 Steedman, Missouri 65077 Terri Sculley, Director Special Projects Division Kansas Corporation Commission State Office Building, 4th Floor Topeka, Kansas 66612 Mr. Glen L. Koester Vice President - Nuclear Kansas Gas and Electric Company 201 North Market Street P. O. Box 208 Wichita, Kansas 67201 Mayor Howard Steffen Chamois, Missouri 65024 Jay Silberg, Esquire Shaw, Pittman, Potts & Trowbridge 1800 M Street, H. W.

Washington, 0. C. 20036 Mr. Donald H. Capone Manager - Nuclear Engineering Union Elect.ric Company P. 0. Box 149 St. Louis, Missouri 63166 Ms. Mary Ellen Salava Route 1, Box 56 Burlington, Kansas 66839 Eric A. Elsen, Esq.

Birch, Horton, Bittner & Moore 1140 Connecticut Avenue, N. W.

Washington, D. C. 20036 Ms. Wanda Christy 515 N. 1st Street Burlington, Kansas 66839 Ms. Majorie Reilly Energy Chairman of the League of Women Voters of University City, MO 7065 Pershing Avenue University City, Missouri 63130 Mr. Fred Lukey Presiding Judge, Montgomery County Rural Route Rhineland, Missouri 65069 Professor William H. Miller Missouri Kansas Section, American Nuclear Society Department of Nuclear Engineering 1026 Engineerfng Building University of Missouri Columbia, Missouri 65211

_t___

SNUPPS

- 2. -

cc: Robert G. Wright Associate Judge, Eastern District County Court Cellaway County, Missouri Route #1 Fulton, Missouri Lewis C. Green, Esq.

Green, Hennings & Henry Attorney for Joint Intervenors 314 N. Broadway, Suite 1830 St. Louis, Missouri 63102 Mr. Earl Brown School District Superintendent P. 0. Box 9 Kingdom City, Missouri 65262 Mr. Donald Bollinger, Member Missoruians for Safe Energy 6267 Delmar Boulevard University City, Missouri 63130 Mr. Samuel J. Birk R. R. J1, Box 243 Morrison, Missouri 65061 Mr. Harold Lottman Presiding Judge, Dasconade County Route 1 Owensville, Missouri 65066 A. Scott Cauger, Esq.

Assistant General Counsel for the Missouri Public Service Comm.

P: 0. Box 360 Jefferson City, Missouri 65101 John H. Simpson, Esq.

Attorney for Intervenors 4350 Johnson Drive, Suite 120 Shawnee Mission, Kansas 66205 Mr. James G. Keppler U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. John T. Collins U. S. Nuclear Regulatory Commission Re ion IV 611 Ryan Plaza, Suite 1000 Arlington, Texas 76011 Mr. Joe Mulholland Manager of Power Supply & Engineering Kansas Electric Power Cooperative, Inc.

P. 0. Box 4877 Gage Center Station Topeka, Kansas 66604 C. Edward Peterson, Esq.

Legal Division Kansas Corporation Commission Fourth Floor State Office Building Topeka, Kansas 66612 Brian P. Cassidy, Regional Counsel Federal Emergency Management Agency Region I J. W. McCormack POCII Boston, Massachusetts 02109 Mr. John G. Reed Route #I Kingdom City, Missouri 65262 Mr. Dan 1. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment St. Louis Region 6267 Delmar Boulevard University City, Missouri 63130

L SNUPPS Siandsodiod Nucleat Unil Powrr Plant Synem 5 Choae Cherry Rold Nieholas A. Petrick Rodvi.

aY1rn4,oss Excutlve Diector t3114OSHO10 August 10, 1984 SUIRC 84- 0106 FILE: 0278 SUBJ:

fire Protection Review Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comnission Washington, D. C. 20555 Docket Hos.:

STH 50-4B2 and STH 50-483

Reference:

1. SLNRC 82-046, dated November 15, 1982:

Same Subject

2. NUREG-0881, Supplement No. 3, dated August 1983:

Safety Evaluation Report Related to Operation of Wolf Creek Generating Station,, Unit No. 1

3.

OUREG-0830, Supplement No. 3, dated May 1984:

Safety Evaluation Report Rielated to Operation of Callaway Plant, Unit No. 1

Dear Mr. Denton:

During a fire protection audit at the Wolf Creek Generating Ftation the week of July 30, 1984, the NRC audit team, from Region IV of the Office of Inspection and Enforcement (OIE), questioned the assumr 'ins of the control room fire hazards analysis for the SHUPPS plants -

Callaway Plant Unit No. 1 and Wolf Creek Generating Station Unit J:o. 1. The NRC audit team also imposed a new control room fire scenario and requested to review SNUPPS design provisions or procedures which would demonstrate the capability to mitigate the new scenario.

This new scenario requires imnediate evacuation of the control room by plant operators (who may be allowed to perfo m one or two quick actions in the course of departing) and causes immediate loss of fuiction or spurious operation (due to fire-induced electrical shorts, etc.) of any or all plant equlpment controlled from the control roof, i.e., complete and total loss of the control room.

The SNUPPS design and procedural controls for mitigation of postulated control room fires are described In the "SNUPPS Control Room Fire Hazards Analysis" report which was submitted by Reference 1.

This analysis clearly states that immediate evacuation and conflagration of the control room or immediate loss of function and/or spurious function of control systems are not assumed In the SNUPPS plants. Based on the 1

_11

I- -

o I

i 0

'.LNRC 84- 0106

,age 2.

/ construction of the cabinets and size of the postulated credible fires, the analysis supports the passage of some small amount of time (greater than four minutes) before the adverse consequences of fire damage occur.

Prior to submittal of Reference 1, the assumptions of the SNUPPS anal-ysis were presented in detail and discussed at'a meeting with the appropriate review branches of the'Office of Nuclear; Reactor Regulation (ONRR) on October 19, 1982.

The purpose of this meeting was toascer-tamn the acceptability of the assumptions especially those concerning magnitude of the fire, definition of acceptable repair activities, and time to respond prior to the assumption of fire damag e effects.

Based on the control room fire hazards analysis and feedback from the meeting with NRC staff, the SNUPPS Utilities modified the design of the SNUPPS plants to incorporate isolation switches to preclude the need to make repairs to certain electrical control circuits.

The NRC staff in References 2 and 3 concluded that the SNUPPS Control Room Fire Hazards Analysis was acceptable.

At the recent Wolf Creek Audit,, the audit team stated that they did not reject the SNUPPS Control Room Fire Hazards Analysis or the plant procedures which are based on that analysis.

However, the audit team indicated that the control room fire concern would be an audit "open item" until such time as Kansas Gas and Electric Company produces a procedure to shut the plant down using a new fire scenario.

Since this procedure cannot be produced until a new analysis is performed, hardware modifications are analyzed fnd operator response requirements are studied, the existing analysis for credible fires has, in effect, been rejected.

A meeting between the SNUPPS Utilities and the NRC staff was held on August 10, 1984 to discuss the postulated control room fire.

The NRC staff stated that the concern was not the development of a new procedure but independence of the SNUPPS alternate shutdown equipment from the control room.

The NRC staff did not consider the imposition of imme-diate evacuation and immediate electrical damage resulting from 4n exposure fire to be a new position and stated that the SNUPPS Control Room Fire Hazards Analysis was not clear regarding the assumption of some time delay before the adverse consequences of fire damage occur.

The SNUPPS Utilities stated that the previously approved analysis is clearly based on the assumption of time delay prior to damage and that the Imposition of immediate damage represents a new regulatory position for the SNUPPS plants.

To date, the SNUPPS fire protection design has been subjected to a licensing review and four siue audits/walkdowns:

ONRR, 10/17-20/1983, Callaway; ONRR, 2/7-8(84, Wolf Creek; OE, 3/84-4/84, Callaway; OlE, 7/30-813/84, Wolf Creek.

Bei:ause of the SNUPPS design provisions for fire protection (for example, separate train-related cable spreading rooms), these extensive NRC reviews have resulted in few plant modifi-cations to meet regulatory positions.

Nevertheless, the SNUPPS Util-ities agreed to install certain plant design changes (control room isolation switches, additional sprinkler heads in two plant areas,

-FM

,1<.

SLNRC 84-0106 Page 3.

a control room ventilation system smoke detector and a cable tray fire stop) to resolve NRC review concerns.

Even prior to installation of these design changes the overall S1UPPS plant fire protection design

-provided a level of protection-for public health and safety sybstan-

.tially above acceptable levels.

The new control room fire position presented by the audit team at Wolf Creek represents a significant change In the previously approved regu-latory position regarding control room fires in the SNUPPS plants.

Therefore, the SNUPPS Utilities request that this new regulatory posi-tion be reviewed in accordance with the provisions of 10 CFR Part 50.109.

In addition, the SNUPPS Utilities request a meeting with appropriate NRC management in accordance with the procedures for dis-position of backfitting requirements which have been implemented by the Offices of Inspection and Enforcement and Nuclear Reactor Regulation.

Very truly yours, Nicholas A. Petrick MHF/nIdl2al4&15 cc: D. F. Schnell UE G. L. Koester KGE D. T. MkPhee KCPL J. Nellser/8. Little USNRC/CAL H. Bundy USNRC/WC

8. L. Forney USNRC/RIII
0. R. Hunter USNRC/RIV V. Stello, Jr.

USNRC

-04_40,v

SLNRC 84- 0106 Page 4 bcc:

F. D. Crawford KCPL D. W. Capone

-UE 1M. L. Johnson KGE J. A. Bailey KGE/IIC M. A. Hannah KGE D. E. Shsfer UE A. C. Passwater VE S. E. Miltenberger UE/CAL F. T. Rhodes KGE/IIC