ML060090291
| ML060090291 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 12/09/2005 |
| From: | Tosch K State of NJ, Dept of Environmental Protection |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NUREG-1482, Rev 1 | |
| Download: ML060090291 (1) | |
Text
Richard J. Codey Acting Governor <
Department of Environmental Protection Division of Environmental Safety and Health Radiation Protection and Release Prevention Element
-Bureau of Nuclear Engieering; P. O.Box 415 Trenton, New Jersey 08625-0415 Tel (609) 984-7700 Fax(609)984-7513-Bradley M. Campbell Commissioner
.' December 9, 2005 United States Nuclear Regulatory Commission
'Document Control Desk
-- --Washinton C2O55;.:.---5 0<:
;;"ear' S c W' i' -r:'-0 I,
I-
i 1_-
i .I 1,,
I
Subject:
,Salem Generating Station Units 1 and 2 Docket Nos. 50-272 and 50-311 License Change Request S05-08
'r4~_:
. __z
.T A_ lrs
- -ontaament isolation valves PSEG Nuclear LLC 'submitted the proposed change to the Salem Technical Specifications by letter to the NRC dated-September 26,2005. The proposed amendment would eliminate-the Surveillance.
Requirement for containment isolation valvs ithat are being returned to service after maintenance, repair or replacement as allowed by Section 4.4.2 of.NUREG-1482, Revision 1.
The BNE is opposed to the elimination of this surveillance requirement. Since NUREG-1482, Revision 1, allows for this surveillance to be eliminated only if certain conditions are met, we recommend that the surveillance requirement be revised as follows:
Each containment isolation valve shall be demonstrated OPERABLE prior to returning the valve to service after maintenance, repair or replacement work is performed on the-valve or its associated
- pacttor, control ror powercir bypiefomance of a,-cycling test and,..
.verification ofisolation time, nless the conditions of Section 4.4.2 of NUREG-1482, Revision 1, aremet.-
If you need to discuss this subject. further, please contact Elliot Rosenfeld at (609) 984-7548.
Sincerely, Ken 'W. Tosch, Acting Assistant Director Radiation Protection and Release Prevention Element New Jersey is an Equal Opportunity Employer Recycled Paper