Exef n~
xe C enei id C C oinp ir y
(
WWW.C xCOr (Oi~
CCC Ni Ltd e~
I yiOfl I itoii 44~ONi ii i Gene ~r Li 11(1 P id Bynol Lb I 10 9/~4 January 3, 2006 LTR: BYRON 2006-0007 File:
1.10.0101 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Nuclear Power Station, Unit 2 Facility Operating License NPF-66 NRC Docket No. STN 50-455
Subject:
Byron Station Unit 2 Steam Generator Inservice Inspection Summary Report In accordance with Technical Specification 56.9, Steam Generator (SG) Tube Inspection Reports, Item b, Exelon Generation Company, LLC is reporting the results of the steam generator inspections that were completed during the Byron Station Unit 2, Refueling Outage 12.
The attached report is also being submitted in accordance with the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, 1989 Edition,Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, Article IWA-6000, Records and Reports, and Article IV-7000, Report of Examination, of Mandatory Appendix IV, Eddy Current Examination of Non-Ferromagnetic Steam Generator Heat Exchanger Tubing.
If there are any questions regarding this report, please contact W. Grundmann, Regulatory Assurance Manager, at (815) 406-2800.
Respectfully,
~.
/~7M4%;
Stephen E. Kuczynski Site Vice President Byron Nuclear Generating Station
Attachment:
Byron Station Unit 2 Steam Generator Eddy Current Inspection Report Cycle 12 Refueling Outage, September 2005 SEK/JSITLF/rah