ML053180406

From kanterella
Jump to navigation Jump to search
E-mail from Howe to Brenner, Et. Al. Important Update on the Vermont Yankee Fuel Segment Investigation
ML053180406
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/14/2004
From: Howe A
Office of Nuclear Reactor Regulation
To: Brenner E, Scott Burnell, Clifford J, Richard Ennis, Holden C, Huffman W, Jaffe D, Jasinki R, Karcagi K, Kim T, Richard Laufer, Chris Miller, Outlaw W, Skay D, Strosnider J, Glenn Tuttle, Votolato D, Wang A, Westreich B, Mike Williams
Office of Public Affairs
References
FOIA/PA-2004-0369
Download: ML053180406 (13)


Text

Allen-Rowe - Fwd: Important Update on the Vermont Yankee Fuel Segment Investigation

Pa e From:

Allen Howe To:

6K-Brenner, Eliot; Burnell, Scott; Clifford, James; Ennis, Rick; Holden, Cornelius; Huffman, William; Jaffe, David; Jasinski, Robert; Karcagi, Kim; Kim, Tae (TJ); Laufer, Richard; Miller, Chris; Outlaw, William; Skay, Donna; Strosnider, Jack; Tuttle, Glenn; Votolato, Dori; Wang, Alan; Westreich, Barry; Williams, Martha Date:

07/14/2004 7:14AM

Subject:

Fwd: Important Update on the Vermont Yankee Fuel Segment Investigation Please see the attached.

Also here is a link to the story I found.

httn://www.reformer.com/Stories/0.1413.102-8860-2270981.00.html

! Allen Howe - ImportantUpdate on the Vermont Yankee Fuel Segment Investigation -_...... ____ __ - ___ _-_

Page 1 1 From:

NPelton, David" <dpelt90@entergy.com>

To:

<cja@nrc.gov>, <bek@nrc.gov>, <hjml @nrc.gov>, <jtwl @nrc.gov>, <dps@nrc.gov>,

<nas~nrc.gov>, <arb nrc.gov>, <beh~nrc.gov>, <djfl @nrc.gov>, <tjB~nrc.gov>, <rxe~nrc.gov>,

<Ibm @ nrc.gov>, <aghl @ nrc.gov>, <whr@ nrc.gov>

Date:

07/13/2004 5:48PM

Subject:

Important Update on the Vermont Yankee Fuel Segment Investigation

All, I'm forwarding you an e-mail sent from Jay Thayer, Vermont Yankee Site Vice President, to the VY staff regarding today's discovery of the missing spent fuel pin segments. The e-mail includes the press release the licensee is passing on to the press tonight.

If anyone has any questions, please call...

David Pelton NRC SRI VY (802) 257-4319


Original Message-----

From: Thayer, Jay Sent: Tuesday, July 13, 2004 5:31 PM To: VTY - All Users

Subject:

Important Update on the Fuel Segment Investigation Importance: High To the Vermont Yankee Team, The following late-breaking information is being put out to the press tonight and I wanted to make sure that all VY employees and site personnel had this information.

Jay Entergy Locates Spent Fuel Segments at Vermont Yankee Vernon, VT-Entergy workers at the Vermont Yankee nuclear power plant today located the missing spent fuel rod segments in the plant's spent fuel pool. The two pieces were stored in a unique 40-inch aluminum cylinder, which is unlike a typical storage container but is similar to several other

It Allen Howe - Important Upd!te on the Vermont Yankee Fuel Seqment Investiqation Pag 21

. ! Allen Howe - Important Update on the Vermont Yankee Fuel Segment Investigation Page2

aluminum structures and tools in the pool.

Entergy VY Site Vice President Jay Thayer credited interviews with former employees and contractors, intense research of records and documents dating back more than 25 years, and video tapes of the pool that were recently taken.

Said Thayer, "Our search team designed a detailed search plan that explored every possibility from three different angles. They looked visually with the cameras, they searched the documents, and they talked to people who were on the scene 25 years ago. The team deserves a tremendous amount of credit.

"We earlier had checked all the containers in the pool, but when we learned that General Electric had designed and sent a pipe-like cylinder for the fuel-rod pieces, we rechecked the videotapes. That's when we noticed that what was previously thought to be part of an existing in-pool structure could very well be the canister that GE sent here."

Workers used remotely operated tools to open the canister and insert a small high-resolution video camera that confirmed the presence of the fuel segments, which are nine inches and seventeen inches long and about the diameter of a pencil.

Thayer also credits the resident NRC inspectors at Vermont Yankee and William Sherman, the Vermont Public Service Department's nuclear engineer, for their contributions to the investigation. "These folks had full and open access to the process every step of the way and they provided valuable insights and guidance."

Thayer said the policies and procedures for record keeping and documentation of activities in Vermont Yankee's spent fuel pool have been revised to ensure accurate record keeping. NWe want to make sure this doesn't happen again," he said.

I Allen H owe - TEXT.htm

_Page 1 1 Allen Howe - TEXT.htm Page 1 1

All, I'm forwarding you an e-mail sent from Jay Thayer, Vermont Yankee Site Vice President, to the VY staff regarding today's discovery of the missing spent fuel pin segments. The e-mail includes the press release the licensee is passing on to the press tonight.

If anyone has any questions, please call...

David Pelton NRC SRI VY (802) 257-4319


Original Message-----

From: Thayer, Jay Sent: Tuesday, July 13, 2004 5:31 PM To: VTY - All Users

Subject:

Important Update on the Fuel Segment Investigation Importance: High To the Vermont Yankee Team, The following late-breaking information Is being put out to the press tonight and I wanted to make sure that all VY employees and site personnel had this Information.

Jay Entergy Locates Spent Fuel Segments at Vermont Yankee

ok Allen H owe -TEXT.htm Pages 2

. Allen Howe - TEXT.htm Paqe 211 Vernon, VT-Entergy workers at the Vermont Yankee nuclear power plant today located the missing spent fuel rod segments in the plant's spent fuel pool. The two pieces were stored in a unique 40-inch aluminum cylinder, which is unlike a typical storage container but is similar to several other aluminum structures and tools in the pool.

Entergy VY Site Vice President Jay Thayer credited interviews with former employees and contractors, intense research of records and documents dating back more than 25 years, and video tapes of the pool that were recently taken.

Said Thayer, "Our search team designed a detailed search plan that explored every possibility from three different angles. They looked visually with the cameras, they searched the documents, and they talked to people who were on the scene 25 years ago. The team deserves a tremendous amount of credit.

"We earlier had checked all the containers in the pool, but when we learned that General Electric had designed and sent a pipe-like cylinder for the fuel-rod pieces, we rechecked the videotapes.

That's when we noticed that what was previously thought to be part of an existing in-pool structure could very well be the canister that GE sent here."

Workers used remotely operated tools to open the canister and insert a small high-resolution video camera that confirmed the presence of the fuel segments, which are nine inches and seventeen inches long and about the diameter of a pencil.

Thayer also credits the resident NRC inspectors at Vermont Yankee and William Sherman, the Vermont Public Service Department's nuclear engineer, for their contributions to the investigation. "These folks had full and open access to the process every step of the way and they provided valuable insights and guidance."

Thayer said the policies and procedures for record keeping and documentation of activities in Vermont Yankee's spent fuel pool have been revised to ensure accurate record keeping. "We want to make sure this doesn't happen again," he said.

t!AIen.Howe - Mime.822 Page1l Received: from igate.nrc.gov [148.184.176.31]

by NRNWMS05.NRC.GOV; Tue, 13 Jul 2004 17:48:00 -0400 Received: from mail.no.entergy.com (maill.no.entergy.com [198.8.3.49])

by smtp-gateway SMTP id i6DLkscgOO1 671; Tue, 13 Jul 2004 17:46:55 -0400 (EDT)

Received: from vyemaill.vynps.com (vyemaill.vynps.com [172.28.144.41])

by mail.no.entergy.com ( with ESMTP Id i6DLlwMo026073; Tue, 13 Jul 2004 16:47:59 -0500 (CDT)

X-MimeOLE: Produced By Microsoft Exchange V6.0.6487.1 content-class: urn:content-classes:message MIME-Version: 1.0 Content-Type: multipart/alternative; boundary="----=_-NextPart_001_01C46923.0D9999B6"

Subject:

Important Update on the Vermont Yankee Fuel Segment Investigation Date: Tue, 13 Jul 2004 17:47:54 -0400 Message-ID: <6A440ABFF97DA54D9858E84A8E4C330F03877F80 @ vyemaill.vynps.com>

X-MS-Has-Attach:

X-MS-TNEF-Correlator:

Thread-Topic: Important Update on the Vermont Yankee Fuel Segment Investigation Thread-Index: AcRpH4jBgm57jrRzTbiKdiKja6xbbQAAASpAAAB287A=

X-Priority: 1 Priority: Urgent Importance: high From: OPelton, David' <dpelt9O@entergy.com>

To: <cja~nrc.gov>, <bek~nrc.gov>, <hjml @nrc.gov>, <jtwl @nrc.gov>,

<dps@nrc.gov>, <nas@ nrc.gov>, <arb@nrc.gov>, <beh/ @nrc.gov>,

<djf 1 @ nrc.gov>, <tjj @ nrc.gov>, <rxe @ nrc.gov>, <Ibm @ nrc.gov>,

<agh1 @nrc.gov>, <whr~nrc.gov>

This is a multi-part message in MIME format.


_-NextPart_001_01 C46923.0D9999B6 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

All, I'm forwarding you an e-mail sent from Jay Thayer, Vermont Yankee Site Vice President, to the VY staff regarding today's discovery of the missing spent fuel pin segments. The e-mail Includes the press release the licensee is passing on to the press tonight.

If anyone has any questions, please call...

David Pelton NRC SRI VY (802) 257-4319

Allen Howe - Mirne.822 Page 21 Original Message-From: Thayer, Jay Sent: Tuesday, July 13, 2004 5:31 PM To: VTY - All Users

Subject:

Important Update on the Fuel Segment Investigation Importance: High To the Vermont Yankee Team, The following late-breaking information is being put out to the press tonight and I wanted to make sure that all VY employees and site personnel had this information.

Jay Entergy Locates Spent Fuel Segments at Vermont Yankee Vernon, VT-Entergy workers at the Vermont Yankee nuclear power plant today located the missing spent fuel rod segments in the plant's spent fuel pool. The two pieces were stored in a unique 40-inch aluminum cylinder, which is unlike a typical storage container but is similar to several other aluminum structures and tools in the pool.

Entergy VY Site Vice President Jay Thayer credited interviews with former employees and contractors, intense research of records and documents dating back more than-25 years, and video tapes of the pool that were recently taken.

Said Thayer, "Our search team designed a detailed search plan that explored every possibility from three different angles. They looked visually with the cameras, they searched the documents, and they talked to people who were on the scene 25 years ago. The team deserves a tremendous amount of credit.

"We earlier had checked all the containers in the pool, but when we learned that General Electric had designed and sent a pipe-like cylinder for the fuel-rod pieces, we rechecked the videotapes. That's when we noticed that what was previously thought to be part of an existing in-pool structure could very well be the canister that GE sent here."

Workers used remotely operated tools to open the canister and insert a small high-resolution video camera that confirmed the presence of the

. Allen.Howe-Mime.822 Page 31-fuel segments, which are nine inches and seventeen inches long and about the diameter of a pencil.

Thayer also credits the resident NRC inspectors at Vermont Yankee and William Sherman, the Vermont Public Service Department's nuclear engineer, for their contributions to the investigation. "These folks had full and open access to the process every step of the way and they provided valuable insights and guidance."

Thayer said the policies and procedures for record keeping and documentation of activities in Vermont Yankee's spent fuel pool have been revised to ensure accurate record keeping. 'We want to make sure this doesn't happen again,' he said. --- __NextPart_001_01C46923.0D9999B6 Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

<html>

<head>

<meta http-equiv=Content-Type content='text/html; charset=us-ascii^>

<meta name=Generator content="Microsoft Word 10 (filtered)'>

<title>Entergy Locates Spent Fuel Segments at Vermont Yankee</title>

<style>

<I--

r Font Definitions /

@font-face

{font-family:Tahoma; panose-1:211 64354424;)

r Style Definitions */

p.MsoNormal, li.MsoNormal, div.MsoNormal

{margin:Oin; margin-bottom:.0001 pt; font-size:12.Opt; font-family:"Times New Roman%;)

p.MsoTitle, li.MsoTitle, div.MsoTitle (margin:Oin; margin-bottom:.0001 pt; text-align:center; font-size:12.Opt; font-family:'Times New Roman';

font-weight:bold;)

t Allen Ho-we - Mime!822 P age-4 1 Allen Howe - Mime.822 Page4N a:link, span.MsoHyperlink

{color:blue; text-decoration:underline;)

a:visited, span.MsoHyperlinkFollowed (color:purple; text-decoration:underline;)

span.emailstylel 8

{font-family:Arial; color:navy;)

span.EmallStyle1 9

{font-family:Arial; color:navy;)

@page Section1

{size:8.5in 11.Oin; margin:1.0in 1.25in 1.0in 1.25in;)

div.Sectionl

{page:Sectionl;)

</style>

</head>

<body lang=EN-US link=blue vlink=purple>

AII,

 </font

     1&#821 7;m forwarding you an e-mail sent from Jay Thayer, Vermont Yankee Site Vice President, to the VY staff regarding today’s discovery of the missing spent fuel pin segments.  The e-mail includes the press release the licensee is passing on to the press tonight./span>

 

     If anyone has any questions, please call…

 4/span>4/font>4]p>

David Pelton4/p>

NRC SRI VY<Ispan><Ifont>4Ip>

(802) 257-431 9.cspan>4/font>

 4Ispan>4/font>4/p>

----Original Message----
From:4Ispan><4b> Thayer, Jay
Sent:clb> Tuesday, July 13, 2004 5:31 PM
To:4/span> VTY - All Users

Subject:

4/span> Important Update on the Fuel Segment Investigation

lmportance:4clb>

High

 4Ispan>d/font>

4font size=3 color=navy face=Times New Roman"><cspan style='font-size:1 2.Opt; Iine-height:200%;color:navy'>To the Vermont Yankee Team,4/span>4/font><Ib>4/p>

The following late-breaking information is being put out to the press tonight and I wanted to make sure that all VY employees and site personnel had this information.4/span><Ip>

 

Jay

font size=3 face="Times New Roman"> 

Entergy Locates Spent Fuel Segments at Vermont Yankee

 

Vernon, VT— Entergy workers at the Vermont Yankee nuclear power plant today located the missing spent fuel rod segments in the plant’s spent fuel pool. The two pieces were stored in a unique 40-inch aluminum cylinder, which is unlike a typical storage container but is similar to several other aluminum structures and tools in the pool.

Entergy VY Site Vice President Jay Thayer credited interviews with former employees and contractors, intense research of records and documents dating back more than 25 years, and video tapes of the pool that were recently taken.<Ip>

Said Thayer, “Our search team designed a detailed search plan that explored every possibility from three different angles. They looked visually with the L - : -..- - c-Alien.Howe - mirne.822 Paae 71 Allen.Howe - Mime.822 Paae7I cameras, they searched the documents, and they talked to people who were on the scene 25 years ago. The team deserves a tremendous amount of credit.

“We earlier had checked all the containers in the pool, but when we learned that General Electric had designed and sent a pipe-like cylinder for the fuel-rod pieces, we rechecked the videotapes.  That’s when we noticed that what was previously thought to be part of an existing in-pool structure could very well be the canister that GE sent here.&#8221 ;

Workers used remotely operated tools to open the canister and insert a small high-resolution video camera that confirmed the presence of the fuel segments, which are nine inches and seventeen inches long and about the diameter of a pencil.<Ifont>

Thayer also credits the resident NRC inspectors at Vermont Yankee and William

Sherman, the Vermont Public Service Department’s nuclear engineer, for their contributions to the investigation. “These folks had full and open access to the process every step of the way and they provided valuable insights and guidance.”

Thayer said the policies and procedures for record keeping and documentation of activities in Vermont Yankee’s spent fuel pool have been revised to ensure accurate record keeping. “We want to make sure this doesn’t happen again,” he said.

 

cfont size=3 face='Times New Roman">    &nbsp

            
            & nbsp;           &n bsp;           &nb sp;     

 <4span><4font>

 

</body>

</html>


Next-tr-_01_01 C46923.0D9999B6--