ML052790475

From kanterella
Jump to navigation Jump to search
E-mail from F. Arner of USNRC to D. Screnci of USNRC, Regarding EDO Highlight VY Eng. Team
ML052790475
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 08/12/2004
From: Frank Arner
NRC Region 1
To: Diane Screnci
Office of Public Affairs
References
FOIA/PA-2004-0369
Download: ML052790475 (3)


Text

rDonald Flor-e-k-EDO highflight VY eng. team Page 1 From:

Frank Amer To:

Diane Screnci Date:

8112104 2:55PM

Subject:

EDO highlight VY eng. team This morning, it was requested that an EDO highlight be prepared regarding the Eng team at VY this week.

Attached is a recommended highlight.

Please review and comment as appropriate. I will then forward to DRP staff for inclusion as a highlight for tomorrow.

thanx frank a.

CC:

Cliff Anderson; Donald Florek; Lawrence Doerflein (I

I-C-.iTEMP\\V\\W000001.TMP

-~~~Page 1 I C:\\TEMP\\GW}OOOO1.TMP Page 1 I Mail Envelope Properties (41 1BBDOF.97A:10: 34898)

Subject:

Creation Date:

From:

Created By:

EDO highlight VY eng. team 8/12/04 2:55PM Frank Amer FJA~nrc.gov Recipients kplpo.KPDO CJA CC (Cliff Anderson)

DJF1 CC (Donald Florek)

DPS (Diane Screnci)

LTD CC (Lawrence Doerflein)

Post Office kplpo.KPDO Route Files MESSAGE vy edo hglt.wpd Options Expiration Date:

Priority:

Reply Requested:

Return Notification:

Concealed

Subject:

Security:

Size 1035 2554 Date & Time 08/12/04 02:55PM 08/12/04 01:45PM None Standard No None No Standard

I Donald Florek - vy edo hglt.wpd Page 1 1 I Donald Florek - vy edo hglt.wpd Page 1 I REGION I Items of Interest Week Ending August 14, 2004 Engineering Design Inspection at Vermont Yankee On August 9, 2004, a team of eight inspectors from the Nuclear Regulatory Commission, including three contractors, began a pilot engineering design inspection at the Vermont Yankee nuclear power plant in Vernon, Vermont. The team is implementing a temporary instruction inspection procedure as part of an effort to enhance the Reactor Oversight Process design inspections. This inspection will also provide information relevant to reviewing Entergy Nuclear's application to increase the plant's power output by 20 percent. The Governor of Vermont and Congressional delegations have shown significant interest. Region I is Interacting with Vermont State Representatives to set up periodic briefings for interested parties.