ML051730005
| ML051730005 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 06/24/2005 |
| From: | Spaulding D NRC/NRR/DLPM/LPD3 |
| To: | Peifer M Nuclear Management Co |
| Spaulding, D W, NRR/DLPM, 415-2928 | |
| Shared Package | |
| ML051730006 | List: |
| References | |
| TAC MC2023 | |
| Download: ML051730005 (4) | |
Text
June 24, 2005 Mark A. Peifer Site Vice President Duane Arnold Energy Center Nuclear Management Company, LLC 3277 DAEC Road Palo, IA 52324-0351
SUBJECT:
DUANE ARNOLD ENERGY CENTER - CORRECTION TO AMENDMENT NO. 258 DATED MAY 12, 2005 (TAC NO MC2023)
Dear Mr. Peifer:
On May 12, 2005, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 258 to Facility Operating License No. DPR-49 for the Duane Arnold Energy Center (DAEC). The Amendment consisted of revising Technical Specifications 1.4, Frequency, 5.5.2, Primary Coolant Sources Outside Containment, and 5.5.11, Safety Function Determination Program, in response to your application dated January 28, 2004. Through an administrative error, pages 1.4-3, 1.4-4, 1.4-6, 1.4-7, 1.4-8, 5.0-8, and 5.0-18 were not included with the issued amendment. This letter transmits those pages. Additionally, through a review of the amendment package, it was noted that there were four typographical errors in the NRC staff safety evaluation. On the third line of page 3, the word the should be a. On the 31st line of page 3, 5.5.12" should be 5.5.11." On page 6 lines 16 - 21, (beginning with Situations and ending with performed) are redundant to lines 22 - 27, (beginning with Situations and ending with performed). On line 16 of page 7, 3.3.1.a should be 3.2.1.a. The typographical errors did not affect the NRC staff conclusion.
If there are any questions concerning this letter, please contact Deirdre W. Spaulding at (301) 415-2928.
Sincerely,
/RA/
Deirdre W. Spaulding, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-331
Enclosures:
As stated cc w/encls: See next page
ML051730006 LETTER ACCESSION NUMBER: ML051730005 TS ACCESSION NUMBER: ML051740431 OFFICE PM:PDIII-1 LA:PDIII-1 SC:PDIII-1 NAME DSpaulding THarris LRaghavan DATE 06/24/05 06/24/05 06/24/05
Duane Arnold Energy Center cc:
Mr. John Paul Cowan Executive Vice President &
Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, MI 54016 John Bjorseth Plant Manager Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 Steven R. Catron Manager, Regulatory Affairs Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 U. S. Nuclear Regulatory Commission Resident Inspectors Office Rural Route #1 Palo, IA 52324 Regional Administrator U. S. NRC, Region III 801 Warrenville Road Lisle, IL 60532-4531 Jonathan Rogoff Vice President, Counsel & Secretary Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Bruce Lacy Nuclear Asset Manager Alliant Energy/Interstate Power and Light Company 3277 DAEC Road Palo, IA 52324 Daniel McGhee Utilities Division Iowa Department of Commerce Lucas Office Buildings, 5th floor Des Moines, IA 50319 Chairman, Linn County Board of Supervisors 930 1st Street SW Cedar Rapids, IA 52404 Craig G. Anderson Senior Vice President, Group Operations 700 First Street Hudson, WI 54016
ERRATA TO LICENSE AMENDMENT NO. 258 FACILITY OPERATING LICENSE NO. DPR-49 DOCKET NO. 50-331 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 1.4-3 1.4-3 1.4-4 1.4-4 1.4-6 1.4-7 1.4-8 5.0-8 5.0-8 5.0-18 5.0-18