June 17, 2005 LICENSEE:
Nuclear Management Company, LLC FACILITY:
Monticello Nuclear Generating Plant
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE HELD ON JUNE 9, 2005, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND NUCLEAR MANAGEMENT COMPANY, LLC, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE MONTICELLO NUCLEAR GENERATING PLANT LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Nuclear Management Company, LLC (NMC) held a telephone conference on June 9, 2005, to discuss and clarify the staffs draft requests for additional information (D-RAIs) concerning the Monticello Nuclear Generating Plant, license renewal application. The conference call was useful in clarifying the intent of the staffs D-RAIs. provides a listing of the meeting participants. Enclosure 2 contains a listing of the D-RAIs discussed with the applicant, including a brief description on the status of the items.
The applicant had an opportunity to comment on this summary.
/RA/ (S. Lee for)
Daniel J. Merzke, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-263
Enclosures:
As stated cc w/encls: See next page
DOCUMENT NAME: E:\\Filenet\\ML051680443.wpd OFFICE PM:RLEP LA:RLEP SC:RLEP NAME DMerzke (S. Lee for)
MJenkins SLee DATE 06/17/05 06/17/05 06/17/05
cc:
Jonathan Rogoff, Esquire Vice President, Counsel & Secretary Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 U.S. Nuclear Regulatory Commission Resident Inspector's Office 2807 W. County Road 75 Monticello, MN 55362 Manager, Regulatory Affairs Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637 Robert Nelson, President Minnesota Environmental Control Citizens Association (MECCA) 1051 South McKnight Road St. Paul, MN 55119 Commissioner Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, MN 55155-4194 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Commissioner Minnesota Department of Health 717 Delaware Street, S. E.
Minneapolis, MN 55440 Douglas M. Gruber, Auditor/Treasurer Wright County Government Center 10 NW Second Street Buffalo, MN 55313 Commissioner Minnesota Department of Commerce 85 7th Place East, Suite 500 St. Paul, MN 55101-2198 Manager - Environmental Protection Division Minnesota Attorney Generals Office 445 Minnesota St., Suite 900 St. Paul, MN 55101-2127 John Paul Cowan Executive Vice President & Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Nuclear Asset Manager Xcel Energy, Inc.
414 Nicollet Mall, R.S. 8 Minneapolis, MN 55401 Mr. James Ross Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Patrick Burke License Renewal Project Manager Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637 Mr. Douglas F. Johnson Director, Plant Life Cycle Issues Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Mr. Thomas J. Palmisano Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637
DISTRIBUTION: Note to NMC, Re: Teleconference held on June 9, 2005, Dated: June 17, 2005 ADAMS Accession No.: ML051680443 HARD COPY RLEP RF E-MAIL:
RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li K. Winsberg (RidsOgcMailCenter)
R. Weisman M. Mayfield A. Murphy S. Smith (srs3)
S. Duraiswamy Y. L. (Renee) Li RLEP Staff L. Raghavan L. Padovan A. Stone, RIII B. Burgess, RIII P. Lougheed, RIII R. Orlikowski, RIII T. Mensah OPA LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE TO DISCUSS THE MONTICELLO NUCLEAR GENERATING PLANT LICENSE RENEWAL APPLICATION JUNE 9, 2005 Participants Affiliations Patrick Burke Nuclear Management Company, LLC (NMC)
Mike Aleksey NMC Joe Pairitz NMC Ron Siepel NMC Daniel Merzke U.S. Nuclear Regulatory Commission (NRC)
John Fair NRC DRAFT REQUESTS FOR ADDITIONAL INFORMATION (D-RAIs)
MONTICELLO NUCLEAR GENERATING PLANT LICENSE RENEWAL APPLICATION June 9, 2005 The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Nuclear Management Company, LLC (NMC) held a telephone conference call on June 9, 2005, to discuss and clarify the staffs draft requests for additional information (D-RAIs) concerning the Monticello Nuclear Generating Plant, license renewal application (LRA). The following D-RAIs were discussed during the telephone conference call.
D-RAI 2.3.1-1 The Control Rod Velocity Limiters are described in Section 6.4 of the USAR. The Control Rod Velocity Limiters are provided as an integral part of each control rod. They provide hydraulic damping to reduce the free fall velocity of the rod and thereby reduce the consequences in the event the control rod became detached from its drive and dropped from the core. The LRA does not mention this component, nor does it appear to refer to USAR Section 6.4 in the text.
Please provide justification.
Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.
D-RAI 2.5.1-1 The Safety Parameter Display System is described in Section 7.13 of the MNGP USAR. The purpose of the Safety Parameter Display System (SPDS) is to provide a concise display of critical plant variables to control room operators to aid them in rapidly and reliably determining the safety status of the plant. The LRA does not mention this system, nor does it appear to refer to USAR Section 7.13 in the text. Please provide justification.
Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.
D-RAI 4.3.1-1 Section 4.3.1 of the license renewal application (LRA) discusses the evaluation of the reactor pressure vessel (RPV) components. The LRA indicates that a reanalysis of the fatigue usage of RPV components was performed as part of the 1998 power uprate. The LRA also indicates that revised fatigue usage factors were determined from the MNGP fatigue monitoring program (FMP). Describe how these revised fatigue usage factors were calculated. Provide a copy of SASR 89-77, Accumulated Fatigue Usage for the Monticello Nuclear Generating Station Reactor Pressure Vessel, December 1989.
Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.
D-RAI 4.3.2-1 Section 4.3.2 of the LRA discusses the evaluation of the reactor vessel internals (RVI). The LRA indicates that the 60-year fatigue usage was estimated by multiplying original fatigue usage by a factor of 1.5. Confirm that this extrapolation bounds the number of startup/shutdown design cycles listed in Section 4.3.1 of the LRA.
Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.
D-RAI 4.3.3-1 Section 4.3.3 of the LRA discusses the evaluation of reactor coolant pressure boundary (RCPB) piping. The LRA indicates that portions of the RCPB were required to be analyzed for fatigue in accordance with the ASME Code Section III for Nuclear Class 1 piping. Provide the basis for this requirement. The LRA further indicates that the design fatigue usage at the limiting location for RCPB core spray piping is less than 0.65 (core spray valve joint). The LRA estimates the 60-year fatigue usage by multiplying the design value by 1.5. Table 4.3.1-1 of the LRA indicates that the projected 60-year fatigue usage of the core spray nozzle is 0.65 based on the FMP. Indicate whether number of thermal transient cycles used to estimate the 60-year fatigue usage of the core spray valve joint is consistent with the number of thermal transient cycles, obtained from the FMP, used to estimate the 60-year fatigue usage of the core spray nozzle.
Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.
D-RAI 4.5-1 Section 4.5 of the LRA discusses the evaluation of the impact of the reactor water environment on the fatigue life of the locations identified in NUREG/CR-6260, Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components. The environmental fatigue usage for the core spray nozzle (safe end) is much lower than the fatigue usage of the core spray nozzle (without environmental effects) provided in Table 4.3.3-1 of the LRA. Provide the basis for the reported usage factors. In addition, discuss the calculation of the Fen multipliers used for each of the NUREG/CR-6260 locations. Provide the calculated Fen multipliers.
Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.
D-RAI 4.6.1-1 Section 4.6.1 of the LRA discusses the evaluation of the suppression chamber. The LRA indicates that the maximum fatigue usage for the torus shell was calculated to be 0.98. Provide the number of safety relief valve (SRV) lifts used in this analysis.
Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.