ML051660210
| ML051660210 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 06/14/2005 |
| From: | NRC/NRR/DLPM |
| To: | |
| Dick G F, NRR/DLPM, 415-3019 | |
| Shared Package | |
| ML050960457 | List: |
| References | |
| TAC MC4498, TAC MC4499 | |
| Download: ML051660210 (2) | |
Text
PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS
NOTES -----------------------------------
- 1.
These SRs apply to each Function in Table 3.3.3.1-1.
- 2.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the other required channel in the associated Function is OPERABLE.
I SURVEILLANCE FREQUENCY SR 3.3.3.1.1 Perform CHANNEL CHECK.
31 days SR 3.3.3.1.2 Perform CHANNEL CALIBRATION.
24 months I
Quad Cities 1 and 2 3.3.3. 1-3 Amendment No.226 / 221
PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page I of 1)
Post Accident Monftoring Instrumentation CONDITIONS REFERENCED REQUIRED FROM REQUIRED FUNCTION CHANNELS ACTION 0.1
- 1. Reactor Vessel Pressure 2
E
- a. Wide Range 2
E
- b. Narrow Range 2
E
- 3. Torus Water Level 2
E
- 4. Drywell Pressure
- a. Wide Range 2
E
- b. Narrow Range 2
E
- 5. Drywell Radiation Monitors 2
F
- 6. Penetration Flow Path.PCIV Position 2 per penetration E
flow path(j)(1)
- 7. Torus Water Temperature 2
E (a) Not required for isolation valves whose associated penetration flow path Is isolated by at least one closed and deactivated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.
(b) Only one position indication channel is required for penetration flow paths with only one Installed control room indication channel.
I Ouad Cities 1 and 2 3.3.3.1-4 Amendment No. / 226/221