ML050740004

From kanterella
Jump to navigation Jump to search
Meeting Handouts for NRC Meeting with Duke Energy to Discuss Plans for Possible COL Application
ML050740004
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 03/14/2005
From:
NRC/NRR/DRIP/RNRP
To:
NRC/NRR/DRIP/RNRP
Cubbage A, NRR/DRIP/RNRP, 301-415-2875
Shared Package
ML050740003 List:
References
Download: ML050740004 (11)


Text

Planning Meeting with Duke Energy for Possible Combined License Application March 14, 2004

2 Introductory Remarks Dave Matthews, NRC Laura Dudes, NRC

Duke Power Executive Overview Jim Fisicaro, Duke Energy

Nominal NRC Review Schedule and Resources John Thrasher, Duke Energy Nanette Gilles, NRC

Combined License (COL) Referencing Non-Certified Design John Thrasher, Duke Energy Jerry Wilson, NRC

NRC Review of COL application Guidance Joseph Colaccino, NRC

COL Application Preparation Timeline John Thrasher, Duke Energy Amy Cubbage, NRC

Pre-Application Interactions John Thrasher, Duke Energy Amy Cubbage, NRC

Inspection Guidance Mary Ann Ashley, NRC

Site Redress Plans Limited Site Development John Thrasher, Duke Energy Jerry Wilson, NRC

Closing Remarks Laura Dudes, NRC Bryan Dolan, Duke Energy

Public Comments Meeting Agenda

3 Nominal NRC Review Schedule and Resources for COL Schedule estimates from SECY-01-0188, Future Licensing and Inspection Readiness Assessment COL referencing ESP & DC 27 months*

COL referencing ESP only 33-60 months*

Design certification 42-60 months**

Current ESP reviews, existing site 33 months

  • Nominal 1 year hearing assumed
    • Assumes 1 year design certification rulemaking

4 Nominal NRC Review Schedule and Resources for COL Current best estimates for COL resources COL referencing ESP & DC 55 FTE, $3500K (COL application review only)

COL referencing ESP only 100 FTE, $8500K (from SECY-01-0188)

Design certification 50-75 FTE, $5500-7500K ESP reviews 15-25 FTE, $2500K

5 NRC Review of NEI-04-01 NEI-04-01, Rev D, Draft Industry Guideline for Combined License Applicants Under 10 CFR Part 52 Submitted by NEI task force on December 21, 2004 Draft intended as vehicle for discussion with NRC NEI intends the final document to provide guidance on the preparation of a COL application NEI-04-01 Base Case COL application that references both a certified design and a permitted site

6 NRC Review of NEI-04-01 (continued)

NRC Infrastructure Activities Impacting NEI-04-01 Development 10 CFR Part 52 Rulemaking Construction Inspection Program COL Operational Program Review Current Status of NRC Activities NEI-04-01 receiving broad NRC review First round of comments to be provided to NEI in June 2005 NEI committed to provide Revision E of the document by August 2005.

7 COL Preparation issues Meteorological data collection Antitrust

8 Meteorology Guidance

Reg Guide 1.23 Onsite Meteorological Programs

Reg Guide 1.70, Rev 3, Standard Format and Content Of Safety Analysis Report for Nuclear Power Plants

Reg Guide 1.111, Rev 1, Methods for Estimating Atmospheric Transport and Dispersion of Gaseous Effluents in Routine Releases from Light-Water-Cooled Reactors

Reg Guide 1.145, Rev 1, Atmospheric Dispersion Models for Potential Accident Consequence Assessments at Nuclear Power Plants

Reg Guide 1.194, Atmospheric Relative Concentrations for Control Room Radiological Habitability Assessments at Nuclear Power Plants

Reg Guide 4.2, Rev 2, Preparation of Environmental Reports for Nuclear Power Stations

Reg Guide 4.7, Rev 2, General Site Suitability Criteria for Nuclear Power Stations

NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants

NUREG-1555, Standard Review Plans for Environmental Reviews for Nuclear Power Plants

RS-002, Processing Applications for Early Site Permits

9 Antitrust Review

Section 105c of the Atomic Energy Act provides the statutory basis for NRC antitrust reviews

10 CFR Part 50 Appendix L and 10 CFR 50.33a provide requirements for antitrust review

10 CFR Part 2 contains some procedural information on the antitrust review process

Antitrust information must be submitted to the NRC at least nine months but not more than thirty-six months prior to the date of submittal of the COL application

NRC provides the information to the Department of Justice for review

Antitrust review conducted in parallel with design and siting review

10 Pre-Application Interactions Quality Assurance Program Review NUREG-0800, Standard Review Plan, Section 17.1 Early interaction encouraged Seismic Data Collection NRC observation at site Public Meeting at Site prior to COL Application Emergency Planning Guidance available Engineering Design Verification NRC Inspection

11 Inspections to Support COL Application Review

NUREG-1789, 10 CFR Part 52 Construction Inspection Program Framework Document, April 2004 Provides general approach

Inspection Manual Chapter 2502 - Pre-COL Inspections - due July 2005.

Basic inspection requirements assuming ESP and Certified Design Identifies supplemental inspections to support applications without ESP or Certified Design Emphasis on QA, environmental, and first-of-a-kind engineering

First-of-a-kind (FOAK) Engineering New inspection procedure - due July 2005 For use to review completion of a certified design or for a total review of a custom design

Implementation schedule - as soon as needed, even before the application is submitted if components are being ordered