April 11, 2004 EA-04-190 Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2 AND 3, WATTS BAR NUCLEAR PLANT, UNIT 1 AND SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 (OPS5N) - REQUEST FOR EXTENSION OF TIME TO REPLY TO NOVEMBER 5, 2004, ORDER IMPOSING REQUIREMENTS FOR PROTECTING CERTAIN SAFEGUARDS INFORMATION
Dear Mr. Singer:
By letter dated November 22, 2004, you requested an extension of time to respond to the above referenced Order. You requested the extension until 20 days after receiving clarifications from the U.S. Nuclear Regulatory Commission (NRC) regarding differences between the implementation of the SAFEGUARDS information - MODIFIED HANDLING (SGI-M) requirements provided in the November 5, 2004, Order, and the SAFEGUARDS Information program carried out by your facility for handling SAFEGUARDS information (SGI) pertaining to special nuclear material under the provisions of Title 10 of the Code of Federal Regulations (10 CFR) Part 73.21. In your extension request, you indicated that the SGI-M designated information transmitted with the Order would be managed during the extension period under the provisions of the 10 CFR Part 73 SAFEGUARDS Information program currently being used at your facility.
Licensees who currently have a SAFEGUARDS Information program approved under 10 CFR 73.21 may use that program to control SGI-M, as designated by Commission Orders.
The NRC considers that 10 CFR Part 73 SAFEGUARDS Information programs are adequate for protection of SGI-M. As a general matter, an acceptable response to the November 5, 2004, Order, is that the designated SGI-M will be handled under the same provisions as the current 10 CFR Part 73 SAFEGUARDS Information program.
Licensees who currently have a SAFEGUARDS Information program approved under 10 CFR 73.21 will find it necessary to ensure that their program adequately addresses the following circumstances associated with SGI-M:
K. W. Singer 1.
When information is transmitted, whether by letter or electronic means, to a licensee who only has an SGI-M program, the handling provisions described in the November 5, 2004, Order, must be followed to prevent the receiving licensee from potentially violating the provisions of the Order. Specifically, licensees with approved 10 CFR Part 73 SAFEGUARDS Information programs should ensure that the provisions of the November 5, 2004, Order, associated with double wrapping, electronic transfer, portion marking, and top and bottom SGI-M page designations on each page are carried out when information is transmitted to a licensee who has an SGI-M program.
These SGI-M handling provisions need only be applied to SGI-M which is received or generated after the date of the November 5, 2004, Order. It should not be construed that SGI documents administered under the 10 CFR Part 73 SAFEGUARDS Information program are to be retroactively modified to conform to the SGI-M marking designations.
- 2.
SGI-M may be stored in a key-locked filing cabinet, whereas 10 CFR Part 73 SGI must be stored in an approved security container. Licensees who currently have a SAFEGUARDS Information program approved under 10 CFR 73.21, and respond that all SGI-M will be managed under the 10 CFR Part 73 program, could either: (a) store SGI-M in accordance with its SAFEGUARDS Information program under 10 CFR Part 73; or (b) modify their procedures to allow SGI-M storage in a key-locked filing cabinet, in compliance with the November 5, 2004, Order. This modification, if adopted, would help to avoid potential inadvertent violations of the facilitys SAFEGUARDS Information program, if the SGI-M is not stored in a security container approved for SGI.
This letter clarifies the issues you raised, which constituted good cause for an extension, and grants your request for an extension of time to respond to the November 5, 2004, Order, until 20 days from the date of this letter.
Please contact the NRC licensing project manager if you have any questions regarding these clarifications.
Sincerely,
/RA/
J. E. Dyer, Director Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, 50-296, 50-390, 50-327 and 50-328 cc: See next page
K. W. Singer 1.
When information is transmitted, whether by letter or electronic means, to a licensee who only has an SGI-M program, the handling provisions described in the November 5, 2004, Order, must be followed to prevent the receiving licensee from potentially violating the provisions of the Order. Specifically, licensees with approved 10 CFR Part 73 SAFEGUARDS Information programs should ensure that the provisions of the November 5, 2004, Order, associated with double wrapping, electronic transfer, portion marking, and top and bottom SGI-M page designations on each page are carried out when information is transmitted to a licensee who has an SGI-M program.
These SGI-M handling provisions need only be applied to SGI-M which is received or generated after the date of the November 5, 2004, Order. It should not be construed that SGI documents administered under the 10 CFR Part 73 SAFEGUARDS Information program are to be retroactively modified to conform to the SGI-M marking designations.
- 2.
SGI-M may be stored in a key-locked filing cabinet, whereas 10 CFR Part 73 SGI must be stored in an approved security container. Licensees who currently have a SAFEGUARDS Information program approved under 10 CFR 73.21, and respond that all SGI-M will be managed under the 10 CFR Part 73 program, could either: (a) store SGI-M in accordance with its SAFEGUARDS Information program under 10 CFR Part 73; or (b) modify their procedures to allow SGI-M storage in a key-locked filing cabinet, in compliance with the November 5, 2004, Order. This modification, if adopted, would help to avoid potential inadvertent violations of the facilitys SAFEGUARDS Information program, if the SGI-M is not stored in a security container approved for SGI.
This letter clarifies the issues you raised, which constituted good cause for an extension, and grants your request for an extension of time to respond to the November 5, 2004, Order, until 20 days from the date of this letter.
Please contact the NRC licensing project manager if you have any questions regarding these clarifications.
Sincerely,
/RA/
J. E. Dyer, Director Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, 50-296, 50-390, 50-327 and 50-328 cc: See next page DISTRIBUTION:
PUBLIC DNS R/F RZimmerman JDyer AGiantelli RFoster SYoung OGC ACRS PDII ADAMS Accession No. ML05031003 OFFICE SC:MTWS/DNS PD:NSPPD/DNS OGC D:DNS/NSIR D:NSIR D:NRR NAME MLayton:jph*
MLayton for JWShea JGoldberg DDorman for GTracy RZimmerman JDyer DATE 12/23/04 12/29/04 12/30/04 12/30/04 1/05/05 OFFICE DLPM/PM DLPM/LA DLPM/SC DLPM/PD DLPM/D NAME DPickett BClayton MMarshall EHackett LMarsh DATE 3/3/05 3/4/05 3/9/05 3/4/05 OFFICIAL FILE COPY
Page 1 of 2 BROWNS FERRY NUCLEAR PLANT SEQUOYAH NUCLEAR PLANT WATTS BAR NUCLEAR PLANT cc:
Mr. Ashok S. Bhatnagar, Senior Vice President Nuclear Operations Tennessee Valley Authority 6A Lookout Place Chattanooga, TN 37402-2801 Mr. Larry S. Bryant, General Manager Nuclear Engineering Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Paul L. Pace, Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 Mr. Lawrence E. Nanney, Director Division of Radiological Health Dept. of Environment & Conservation Third Floor, L and C Annex 401 Church Street Nashville, TN 37243-1532 Senior Resident Inspector Sequoyah Nuclear Plant U.S. Nuclear Regulatory Commission 2600 Igou Ferry Road Soddy Daisy, TN 37379 Mr. John C. Fornicola, Manager Nuclear Assurance and Licensing Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Fredrick C. Mashburn Senior Program Manager Nuclear Licensing Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 General Counsel Tennessee Valley Authority ET 11A 400 West Summit Hill Drive Knoxville, TN 37902 Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611 State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, AL 36130-3017 Mr. Kurt L. Krueger, Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Jon R. Rupert, Vice President Browns Ferry Unit 1 Restart Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Robert G. Jones Browns Ferry Unit 1 Plant Restart Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Mr. Scott M. Shaeffer Browns Ferry Unit 1 Project Engineer Division of Reactor Projects, Branch 6 U.S. Nuclear Regulatory Commission 61 Forsyth Street, SW.
Suite 23T85 Atlanta, GA 30303-8931
Page 2 of 2 BROWNS FERRY NUCLEAR PLANT SEQUOYAH NUCLEAR PLANT WATTS BAR NUCLEAR PLANT cc:
Mr. Timothy E. Abney, Manager Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Senior Resident Inspector Browns Ferry Nuclear Plant U.S. Nuclear Regulatory Commission 10833 Shaw Road Athens, AL 35611-6970 County Mayor Hamilton County Courthouse Chattanooga, TN 37402-2801 Mr. Randy Douet Site Vice President Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000 Mr. William R. Lagergren Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381 Mr. Paul L. Pace, Manager Licensing and Industry Affairs Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381 Mr. Jay Laughlin, Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, TN 37381 Senior Resident Inspector Watts Bar Nuclear Plant U.S. Nuclear Regulatory Commission 1260 Nuclear Plant Road Spring City, TN 37381 County Executive 375 Church Street Suite 215 Dayton, TN 37321 County Mayor P. O. Box 156 Decatur, TN 37322 Ms. Ann P. Harris 341 Swing Loop Road Rockwood, Tennessee 37854