November 2004 Monthly Operating Report for Kewaunee Nuclear Power Plant
ML043630339
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 12/13/2004
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-04-143
Download: ML043630339 (3)


Text

'-4

'. t 4W 4

Committed to NuciearExcellence Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC December 13, 2004 NRC-04-143 TS 6.9.a.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 Monthly Operating Report In accordance with Technical Specification 6.9.a.3., enclosed is the Monthly Operating Report for November 2004 for the Kewaunee Nuclear Power Plant.

Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC Enclosure cc:

Administrator, Region Ill, USNRC Senior Resident Inspector, Kewaunee, USNRC Project Manager, Kewaunee, USNRC Public Service Commission of Wisconsin INPO Records Center 0)-

N490 Highway 42. Kewaunee, Wisconsin 54216-9511 Telephone: 920.388.2560

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-305 Kewaunee December 13, 2004 Mary Anderson (920) 388-8453 Notes:

Unit shutdown for refueling outage.

REPORTING PERIOD November, 2004

1.

DESIGN ELECTRICAL RATING (MWE-NET)

2.

MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 574 556 MONTH YEAR-TO-DATE CUMULATIVE

3.

NUMBER OF HOURS REACTOR WAS CRITICAL

4.

NUMBER OF HOURS GENERATOR WAS ON LINE

5.

UNIT RESERVE SHUTDOWN HOURS

6.

NET ELECTRICAL ENERGY (MWH) 0 0

0.0 0

6412.5 6386.1 0.0 3546920 227832.2 225573.2 10.0 113348279

_ I V, e

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-305 Kewaunee December 13,2004 Mary Anderson (920) 388-8453 November, 2004 METHOD NO AE Type DURATION REASON OF NO.

DATE I

(Hours) 2 SHUTTING CAUSE/ORRECTIVE ACTIONS DOWN REACTOR3 5

11/01/04 S

720.0 C

4 Cycle XXVI-XXVII Refueling Outage

.0 continued throughout the reporting period (1)

F: Forced S: Scheduled (2)

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(3)

.Method:

1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Other (Explain)

Continuation 5 - Load Reductions 9-Other

SUMMARY

Mechanical Maintenance completed a full core reload sequence in support of Westinghouse Spilt Pin, 10 Year ISI, and Head Replacement Projects. Mechanical Maintenance completed retests on RHR Pump B, and Turbine Driven Auxiliary Feedwater Pump, and Main Feedwater Pump Speed Increaser Gear Sets. The Heater Drain Pump A Motor, Mag Drive, and Thrust Stand was replaced with the spare set. Various valves and flanges were inspected and rebuilt based on the boric acid leakage reduction program and operational leak checks. The Main Condensers were leak checked under vacuum and plugged as required. Supported Operations with returning the Plant to power. Completed overhaul of the Demin Water System Pre-treatment Flocculator.

Electrical Maintenance key activities in November included preventive maintenance work on 11 Motor Operated Valves, calibration of power relays, Main Auxiliary Transformer bus insulation replacement and replacement of 160 Polar Crane bus insulators.

I&C continued the performance of outage related preventative and corrective maintenance on the primary and secondary systems. I&C supported the major scheduled projects including the Reactor Head replacement, Reactor Protection Relay replacements and the New Analog Rod Position Indication system (NARPI) installation. I&C also performed many Air Operated Valve (AOV) diagnostic tests which will result in improved AOV performance.