ML043550136
| ML043550136 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 12/14/2004 |
| From: | Pace P Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML043550136 (4) | |
Text
Tennessee Valley Authority, Post Office Box 2000. Spring City, Tennessee 37381-2000 DEC 14 2004 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C. 20555 Gentlemen:
In the Matter of Tennessee Valley Authority
)
Docket No.50-390 WATTS BAR NUCLEAR PLANT (WBN) -
NOVEMBER 2004 MONTHLY OPERATING REPORT Provided in the enclosure is the Monthly Operating Report for November 2004 as required by WBN Technical Specification Section 5.9.4.
There are no regulatory commitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824.
Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure Monthly Operating Report -
November 2004 cc:
See page 2 Pated o nIcWd pam
U.S. Nuclear Regulatory Commission Page 2 DEC 1 4 2004 cc (Enclosure):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. D. V. Pickett, Project Manager U.S. Nuclear Regulatory Commission MS 07A15 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303
ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)
MONTHLY OPERATING REPORT NOVEMBER 2004 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1
OPERATING DATA REPORT Docket No.
Unit Name:
Date:
Completed By:
Telephone:
Reporting Period:
50-390 WBN Unit 1 December 07, 2004 J. L. Kasten (423) 365-8022 November 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,155.00 1,121.00
- 3. Number of Hours the Reactor was Critical
- 4. Number of Hours Generator On-line
- 5. Reserve Shutdown Hours
- 6. Net Electrical Energy Generated (MWHrs)
This Month 720.00 720.00 0.00 828,868.00 Yr-to-Date 7,959.53 7,935.55 0.00 8,994,046.59 Cumulative 68,723.40 68,387.96 0.00 76,009,730.26 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- The unit operated at or near 100% power for the month of November 2004.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
E-2