Nuclear Regulatory Commission Augmented Inspection Team Exit Meeting with Palo Verde Nuclear Generation Station
I.
I C.
Inspection Charter
- Basis of Augmented Inspection
- Develop a complete sequence of events
- Assess performance of plant systems
- . Assess adequacy of plant procedures
.T 777-1.
-I
- N.
I -
i
t ".11 I
,,
I MF*.Wfm Inspection Charter
- Assess facility response to event
- Assess facilities determination of apparent cause
+.* Assess maintenance related contributions
I
...rV7 i ',T 110.df bm
-~
'1gs
-a' 4
mv-.
Inspection Charter
- . Assess facility coordination of offsite activities
- Overall risk assessment of event
I-s SEQUENCE OF EVENTS
- Fault Initiation
- . Electrical Transmission and Grid
ge i
- s SEQUENCE OF EVENTS
- . Plant Transients and Challenges
- +
Other Challenges
A-N PERFORMANCE OF PLANT SYSTEMS
- .* Transmission system protection
- .* All three reactors were safely shut down
- Each unit was stabilized by operators
I me-2.2S-2 t:'1..Si'4
- ',pt;saC%1/4lT.'C-7
Er
's..1-.-,
- .c. *..,-
PERFORMANCE OF PLANT SYSTEMS
- + Unit 2 Emergency Diesel Generator failure
- .+.Other minor equipment problems noted during shutdown
V ft W-MNM 71"'
Mg~
Plant Procedures
- . Procedures used during event were generally acceptable
- Some issues noted
MMW Facility Response
- Conduct of operations generally good
- . Emergency response organization challenges
- Some other problems noted by the team
'V *A,jS
- .'.'
- ..$A';f...S7VT.
-r:rrrv'-rv
'9, Vt -
s.'?,
4 *y-,.t'V't
j7:;ji Apparent Causes
-. Electrical fault isolation failure
- +
Transmission lines between Hassayampa and Palo Verde switchyard
- . Unit 2 Emergency Diesel Generator failure
+:+
Technical Support Center Emergency Diesel Generator failure
- Others
Maintenance Related Aspects
- Maintenance of switchyard and substation equipment good
- . Implementation of facility maintenance processes
SUEDAMINOs A.C Off-Site Coordination
- . Good coordination of actions following event
- t Unrecognized design issue with Hassayampa to Palo Verde transmission line protection
Overall Risk Assessment
- Given the loss of approximately 5,500 MWe of electrical generation, the grid performed well
- Electrical power was restored in a timely*
manner
ptn
~. / ~ P S
~2 2 ~~i 4~
~
- ~
22 2 T.,;
Overall Risk Assessment
- All three units were stabilized and placed in a safe shutdown mode of operation