Nuclear Regulatory Commission Augmented Inspection Team Exit Meeting with Palo Verde Nuclear Generation Station

I.

I C.

Inspection Charter

  • Basis of Augmented Inspection
  • Develop a complete sequence of events
  • Assess performance of plant systems
  • . Assess adequacy of plant procedures

.T 777-1.

-I

N.

I -

i



t ".11 I

,,

I MF*.Wfm Inspection Charter

    • Assess facility response to event
  • Assess facilities determination of apparent cause

+.* Assess maintenance related contributions

I

...rV7 i ',T 110.df bm

-~

'1gs

-a' 4

mv-.

Inspection Charter

  • . Assess facility coordination of offsite activities
    • Overall risk assessment of event

I-s SEQUENCE OF EVENTS

  • Fault Initiation
  • . Electrical Transmission and Grid

ge i

  • s SEQUENCE OF EVENTS
  • +

Other Challenges

A-N PERFORMANCE OF PLANT SYSTEMS

  • .* Transmission system protection
  • .* All three reactors were safely shut down
  • Each unit was stabilized by operators

I me-2.2S-2 t:'1..Si'4

',pt;saC%1/4lT.'C-7

Er

's..1-.-,





  • .c. *..,-

PERFORMANCE OF PLANT SYSTEMS

  • .+.Other minor equipment problems noted during shutdown

V ft W-MNM 71"'

Mg~

Plant Procedures

  • . Procedures used during event were generally acceptable
    • Some issues noted

MMW Facility Response

  • Conduct of operations generally good
  • . Emergency response organization challenges
  • Some other problems noted by the team

'V *A,jS

  • .'.'
  • ..$A';f...S7VT.

-r:rrrv'-rv

'9, Vt -

s.'?,

4 *y-,.t'V't

j7:;ji Apparent Causes

-. Electrical fault isolation failure

  • +

Transmission lines between Hassayampa and Palo Verde switchyard

+:+

Technical Support Center Emergency Diesel Generator failure

    • Others

Maintenance Related Aspects

  • Maintenance of switchyard and substation equipment good
  • . Implementation of facility maintenance processes

SUEDAMINOs A.C Off-Site Coordination

  • . Good coordination of actions following event
  • t Unrecognized design issue with Hassayampa to Palo Verde transmission line protection

Overall Risk Assessment

    • Given the loss of approximately 5,500 MWe of electrical generation, the grid performed well
  • Electrical power was restored in a timely*

manner

ptn

~. / ~ P S

~2 2 ~~i 4~

~

  • ~

22 2 T.,;

Overall Risk Assessment

    • All three units were stabilized and placed in a safe shutdown mode of operation