ML042960390

From kanterella
Jump to navigation Jump to search
E-mail from D. Straka Regarding Generator MEL Wm
ML042960390
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/01/2004
From: Straka D
Arizona Public Service Co
To: Gody A, Paulk C
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0307
Download: ML042960390 (1)


Text

From:

<DSTRAKA@apsc.comr>

To:

<CJP@nrc.gov>, <atg@nrc.gov>

Lw'iPautd-i. llf nuy Date:

7/1/04 1:01PM V

Subject:

FW: Generator MEL WM Chuck and Tony:

Attached is a copy of the work order for the Unit 3 MEL circuit that Chuck requested.

Based on phone call(s) between Chuck and Mark Hypse, Craig Hasson and Arshad Taufiq of our safety analysis group:

We can close out the issue regarding the PLUB circuit.

We can close out the issue regarding why SBCS functioned during the Unit 3 event.

We provided information that our Chapter 15 Safety Analysis for a steam generator tube rupture with a Safety or inadvertent ADV opening bounds a spurious opening of SBCS.

With regards to the effect of 67Hz on Unit 3 equipment:

We plan to close out our findings and include them in our Significant Event Report. To ensure we are responding to your concerns, Tony had mentioned a baseline analysis of 63Hz. We would like to know where the 63Hz is referenced. (This is a back up to our phone call earlier today.)

Regards, Don Straka Senior Consultant - Regulatory Affairs dstraka@apsc.com phone: 623.393.5041 pager: 602.509.6240 mobile: 602.509.6240

-Original Message--

From: Hypse, Mark L(V53307)

Sent: Thursday, July 01, 2004 10:04 AM To: Straka, Donald J(Z99942)

Subject:

Generator MEL WM

<<MELWO.PDF>>

CC:

<MHYPSE@apsc.com>, <SSCHROED@apsc.com>,

<JMCDOWEL@apsc.com>