PhIDuke (WPowere A Duke Energy Company SAFEGUARDS INFORMATION HENRYB. BARRON Group VP, Nuclear Generation and Chief Nuclear Officer Duke Power EC07H / 526 South Church Street Charlotte, NC 28202-1802 Mailing Address:
P. 0. Box 1006 - EC07H Charlotte, NC 28201-1006 October 15, 2004 704 382 2200 704 382 6056 fax hbarron@duke-energy. corn U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Duke Energy Corporation Oconee Nuclear Station, Units 1, 2, and 3 NRC Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units I and 2 NRC Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 NRC Docket Nos. 50-413, 50-414 Supplemental Response to April 29, 2003 NRC Order Requiring Compliance With Revised Design Basis Threat For Operating Power Reactors (EA-03-086)
The U.S. Nuclear Regulatory Commission ("NRC") issued an Order dated April 29, 2003 requiring compliance with Revised Design Basis Threat ("Order EA-03-086") and other security related Orders (collectively "Orders") in Docket Nos. 50-269, 50-270, 50-287, Oconee Nuclear Station, 50-369, 50-370, McGuire Nuclear Station, and 50-413, 50-414, Catawba Nuclear Station. On June 2, 2003 pursuant to 10 CFR §50.4 and Conditions III A. 1, B. I and B.2, Duke Energy Corporation ("Duke") submitted its response to Order EA-03-086. On April 27, 2004 Duke submitted a supplemental response to Order EA-03-086.
Duke responded to Requests for Additional Information ("RAI") in letters dated July, 7, 2004, July 13, 2004, July 22, 2004, August 9, 2004 (two separate letters, both dated August 9, 2004),
and August 12, 2004. In each letter, Duke made the following commitment, "upon resolution of this and forthcoming NRC RAI, Duke will submit a revision to the April 27, 2004 submittal."
On September 8, 2004 Duke submitted revision 1 to the Physical Security Plan as a second supplemental response to Order EA-03-086. On September 20, 2004, September 23, 2004 and September 30, 2004 in telephone calls between the NRC and Duke, additional changes to the Physical Security Plan were discussed. On September 30, 2004 Duke submitted revision 2 to the Physical Security Plan as a third supplemental response to Order EA-03-086. In accordance with 10 CFR §50.4, Duke hereby submits its fourth supplemental response to Order EA-03-086. This supplement includes changes reflected as revision 3 to the Physical Security Plan based on the aforementioned discussions between the NRC and Duke.
Co
_100ra,ea4 l9o,-_WwO Heritage. Service. Vision 07-SAFEGUARDS INFORMATION NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE www.dukepower.com PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."
r SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commuission October 15, 2004 Page 2 The attached information contains Safeguards Information and is subject to the restrictions described in 10 CFR §73.21.
If you have any questions regarding this submittal, please contact Randall D. Hart, Catawba Nuclear Station, at (803) 831-3622.
Sincerely, Henry B. Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer Attachments SAFEGUARDS INFORMATION NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."