Kevin J. Nietmann Plant General Manager 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410.495.4101 410.495.4787 Fax Constellation Energy Calvert Cliffs Nuclear Power Plant October 14, 2004 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
SUBJECT:
Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. I & 2; Docket Nos. 50-317 & 50-318 September 2004 Operating Data Reports The subject reports are being sent to you as required by Technical Specification 5.6.4.
Should you have questions regarding this matter, we will be pleased to discuss them with you.
Very truly yours, KJN/CAN/bjd Attachments cc:
J. Petro, Esquire J. E. Silberg, Esquire R. V. Guzman, NRC S. J. Collins, NRC Resident Inspector, NRC R. 1. McLean, DNR S. Mainieri, INPO K. N. Larson, ANI
~/
\\4D/8OOolq'?~?
q -7 V 60 V
':V6-1
OPERATING DATA REPORT Docket No. 50-317 Calvert Cliffs Unit 1 October 1, 2004 Prepared by Herman 0. Olsen Telephone:(410)495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)
MAXIMUM DEPENDABLE CAP'Y (NET MWe)
SEPTEMBER 2004 845 870 Year-to-Date Cumulative to Date This month 1.
2.
3.
4.
NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED(MWH) 720.0 720.0 0.0 626,231 5,865.9 5,826.1 0.0 5, 001, 878 197, 915.3 194,711.8 0.0 159,701,593
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-317 Calvert Cliffs - U I October 1. 2004 Herman 0. Olsen (410) 495-6734 REPORTING MONTH September 2004 NO.
DATE TYPE DURATION REASON' METHOD OF CAUSE/CORRECTIVE ACTIONS F:
FORCED (HOURS)
SHUTTING S:
SCHEDULED DOWN 2 COMMENTS There were no shutdowns this month.
1 Reason:
A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2
Method:
I - Manual 2 - Manual Scram.
3 - Automatic Scram.
4 - Continued 5 - Other
DOCKET NO. 50-317 CALVERT CLIFFS - UNIT I October 1, 2004
SUMMARY
OF OPERATING EXPERIENCE September 2004 The unit began the month at 100% power.
On 09/04/04 at 2200, power was reduced to 87% for Main Turbine Valve Testing. Testing was completed and power was returned to 100% on 09/05/04 at 0110.
On 09/10/04 at 2010 power was reduced to approximately 95% for waterbox cleaning. Power was restored to 100% on 09/12/04 at 0035 after completion of waterbox cleaning.
The unit operated at 100% power for the remainder of the month.
OPERATING DATA REPORT Docket No. 50-318 Calvert Cliffs Unit 2 October 1, 2004 Prepared by Herman 0. Olsen Telephone:(410)495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)
MAXIMUM DEPENDABLE CAP'Y (NET MWe)
SEPTEMBER 2004 845 858 Year-Cumulative to-Date to Date This month
- 1. NUMBER OF HOURS REACTOR WAS CRITICAL
- 2. HOURS GENERATOR ON LINE
- 3. UNIT RESERVE SHUTDOWN HOURS
- 4. NET ELECTRICAL ENERGY GENERATED(MWH) 720.0 720.0
- 0. 0 604,825 6,525.4 6,520.6 0.0 5,624,743 191,252.2 189,358.8
- 0. 0 156,368,033
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-318 Calvert Cliffs-U2 October 1. 2004 Herman 0. Olsen (410) 495-6734 hEPORT MONTH September 2004 NO.
DATE TYPE DURATION REASON' METHOD OF CAUSE/CORRECTIVE ACTIONS F:
FORCED (HOURS)
SHUTTING S:
SCHEDULED DOWN 2 COMMENTS There were no shutdowns this month.
l Reason:
A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2 Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Other
DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 October 1, 2004
SUMMARY
OF OPERATING EXPERIENCE September 2004 The unit began the month at 100% power.
On 09/10/04 at 2240 power was reduced to 86% for Main Turbine Valve Testing. Testing was completed and power was restored to 100% on 09/11/04 at 0037.
On 09/18/04 at 1258 a rapid down power was required due to decreasing condenser vacuum. Power was stabilized at approximately 87% while trouble shooting took place. It was determined that a high differential pressure, due to sea grass intrusion, on the Amertap screens prevented moving the screens.
Circulating Water Pump 25 was secured and the screens were repositioned. Power was increased to 98%
and stabilized at 2338 due to condenser differential temperature.
On 09/19/04 at 0140 power was reduced to 86% for waterbox cleaning. Waterbox cleaning was completed and power was returned to 100% at 2217.
On 09/20/04 at 2030 power was reduced to 93% to clean 21A waterbox. Power was returned to 100%
On 09/21/04 at 0400. At 2203 power was reduced to 95% to clean 21B waterbox. Waterbox cleaning was completed and power was returned to 100% on 09/22/04 at 0412. At 2207 power was reduced to 95% to clean 23A waterbox. Waterbox cleaning was completed and power was returned to 100% on 09/23/04 at 0555.
The unit operated at 100% power for the remainder of the month.