Supplemental Response to April 29, 2003 NRC Order Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors (EA-03-086)
ML042810227
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 09/30/2004
From: Mccollum W
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
EA-03-086
Download: ML042810227 (2)


Text

jftDuke SAFEGUARDS INFORMATION WILLIAM R MCCOLLUM, JR.

-tVPow'ere VP, Nuclear Support Duke Energy Corporation A Duke Energy Company Duke Power EC07H / 526 South Church Street Charlotte, NC 28202-1802 Mailing Address:

P. 0. Box 1006 - EC07H Charlotte, NC 28201-1006 704 382 8983 September 30, 2004 704 382 6056 fax wrmccoll@duke-energy. corn U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Duke Energy Corporation Oconee Nuclear Station, Units 1, 2, and 3 NRC Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units I and 2 NRC Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units I and 2 NRC Docket Nos. 50-413, 50-414 Supplemental Response to April 29, 2003 NRC Order Requiring Compliance With Revised Design Basis Threat For Operating Power Reactors (EA-03-086)

The U.S. Nuclear Regulatory Commission ("NRC") issued an Order dated April 29, 2003 requiring compliance with Revised Design Basis Threat ("Order EA-03-086") and other security related Orders (collectively "Orders") in Docket Nos. 50-269, 50-270, 50-287, Oconee Nuclear Station, 50-369, 50-370, McGuire Nuclear Station, and 50-413, 50-414, Catawba Nuclear Station. On June 2, 2003 pursuant to 10 CFR §50.4 and Conditions III A.1, B.1 and B.2, Duke Energy Corporation ("Duke") submitted its response to Order EA-03-086. On April 27, 2004 Duke submitted a supplemental response to Order EA-03-086.

Duke responded to Requests for Additional Information ("RAI") in letters dated July, 7, 2004, July 13, 2004, July 22, 2004, August 9, 2004 (two separate letters, both dated August 9, 2004),

and August 12, 2004. In each letter, Duke made the following commitment, "upon resolution of this and forthcoming NRC RAI, Duke will submit a revision to the April 27, 2004 submittal."

On September 8, 2004 Duke submitted revision I to the Physical Security Plan as a second supplemental response to Order EA-03-086. On September 20, 2004 and September 23, 2004 in telephone calls between the NRC and Duke, additional changes to the Physical Security Plan were discussed. In accordance with 10 CFR §50.4, Duke hereby submits its third supplemental response to Order EA-03-086. This supplement includes changes reflected as revision 2 to the Physical Security Plan based on the aforementioned discussions between the NRC and Duke.

SAFEGUARDS INFORMATION NOTE: TIlE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORNMATION" AND MUST BE www.dukepower.com PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENT, TIlS LETTER IS "DECONTROLLED."

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission September 30, 2004 Page 2 The attached information contains Safeguards Information and is subject to the restrictions described in 10 CFR §73.21.

If you have any questions regarding this submittal, please contact Randall D. Hart, Catawba Nuclear Station, at (803) 831-3622.

Sincerely, William R. McCollum, Jr.

Vice President, Nuclear Support Attachments SAFEGUARDS INFORMATION NOTE: TIlE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."