Exe1 nsm Exelon Nuclear Telephone 717.456.7014 Nuclear Peach Bottom Atomic Power Station wwwexeloncorp.com 1848 Lay Road Delta, PA 17314-9032 September 1, 2004 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278
Subject:
Monthly Operating Report for August 2004 In accordance with Technical Specifications, Section 5.6.4, "Monthly Operating Reports,"
we are submitting this Monthly Operating Report for Peach Bottom Atomic Power Station, Units 2 and 3.
Should you have any questions concerning this letter, please contact Mr. Chester Lewis at (717) 456-3245.
Respectfully, Joseph P. Grimes Plant Manager Peach Bottom Atomic Power Station JPGJPJD/NPAICSL:cmg T <I 5CL Enclosures cc:
S. Collins, Administrator, Region I, USNRC C. Smith, USNRC, Senior Resident Inspector, PBAPS G. F. Wunder, Project Manager, USNRC t m. t 11-lfo-7to
- 1. INTRODUCTION Peach Bottom Atomic Power Station is composed of two Boiling Water Reactors and Steam Turbine/Generators located in Delta, Pennsylvania. Unit Two and Unit Three both have a Maximum Dependable Capacity of 1112 MWe Net. The Station is jointly owned by Exelon Nuclear and Public Service Electric and Gas. The Nuclear Steam Supply Systems are General Electric Company Boiling Water Reactors. The Architect/Engineer and Primary Construction Contractor was Bechtel Corporation. The Susquehanna River is the condenser cooling water source. The plant is subject to license numbers DPR-44 and DPR-56, issued October 25, 1973, and July 2, 1974, for Unit Two and Unit Three respectively, pursuant to Docket Numbers 50-277 and 50-278. The dates of initial Reactor criticality for Units Two and Three were September 16, 1973, and August 7, 1974, respectively. Commercial generation of power began on February 18, 1974, for Unit Two, and September 1, 1974, for Unit Three.
II.
SUMMARY
OF OPERATING EXPERIENCE A. Unit TWO Unit 2 began the month of August at 100% of maximum allowable power (3496 MWth).
At 2305 on August 6 h, Unit 2 reduced power to 63%, for a planned rod pattern adjustment, during which the Unit was taken to the "all rods out" configuration. The Unit returned to maximum allowable power by 2325 on August 7th, At 2247 on August 15th, Unit 2 reduced power to 28%, due to the degradation of the 2A recirc pump EOC / RPT breaker. Following repairs, the Unit returned to maximum allowable power by 0516 on August 19th, At 2302 on August 20'h, Unit 2 reduced power to 62%, for a planned evolution to remove the 5t stage feedwater heaters from service as part of the Unit coastdown to the 2R15 refueling outage. The Unit returned to maximum allowable power by 0605 on August 22nd.
Unit 2 ended the month of August at 100% of maximum allowable power (3496 MWth).
B. Unit THREE Unit 3 began the month of August at 100% of maximum allowable power (3514 MWth).
At 0019 on August 22"d, Unit 3 reduced power to 94%, for planned testing of the turbine sto2 and control valves. The Unit returned to maximum allowable power by 0235 on August 22 Unit 3 ended the month of August at 100% of maximum allowable power (3514 MWth).
III. OPERATING DATA STATISTICS A. Peach Bottom Unit TWO Operating Data Report for August 2004 DOCKET NO.:
DATE:
COMPLETED BY:
TELEPHONE:
50-277 September 1, 2004 Chip Lewis (717) 456-3245 OPERATING STATUS REPORTING PERIOD:
GROSS HOURS IN REPORTING PERIOD:
CURRENTLY AUTHORIZED POWER LEVEL (MWth):
I.
DESIGN ELECTRICAL RATING (MWe-Net):
- 2.
MAX. DEPENDABLE CAPACITY (MWe-Net):
August 2004 744 3496 1138 1112 UNIT 2 OPERATING STATUS PARAMETER
- 3.
NUMBER OF HOURS THE REACTOR WAS CRITICAL
- 4.
HOURS GENERATOR ON-LINE
- 5.
UNIT RESERVE SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY GENERATED THIS MONTH YTD 744.0 5,798.1 744.0 5,779.0 0
0 775,511.8 6,442,167.4 CUMULATIVE 195,564.6 191,092.9 0
189,593,705.5
III. OPERATING DATA STATISTICS B. Peach Bottom Unit THREE Operating Data Report for August 2004 DOCKET NO.:
DATE:
COMPLETED BY:
TELEPHONE:
50-278 September 1, 2004 Chip Lewis (717) 456-3245 OPERATING STATUS REPORTING PERIOD:
GROSS HOURS IN REPORTING PERIOD:
CURRENTLY AUTHORIZED POWER LEVEL (MWth):
- 1.
DESIGN ELECTRICAL RATING (MWe-Net):
- 2.
MAX. DEPENDABLE CAPACITY (MWe-Net):
August 2004 744 3514 1138 1112 UNIT 3 OPERATING STATUS PARAMETER
- 3.
NUMBER OF HOURS THE REACTOR WAS CRITICAL
- 4.
HOURS GENERATOR ON-LINE
- 5.
UNIT RESERVE SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY GENERATED THIS MONTH YTD 744.0 5,855.0 744.0 5,855.0 0
0 842,886.8 6,651,830.4 CUMULATIVE 194,125.4 190,180.0 0
187,705,595.5
IV. OPERATING DATA STATISTICS A. Unit TWO Shutdowns for August 2004 No. for Year Type Date (1)
Duration (Hours)
Reason (2)
Method of Shutting Down (3)
Corrective Actions/Comments No Unit TWO shltdoitnsfor August 2004 B. Unit THREE Shutdowns for August 2004 No. for' Year Type Date (I)
Duration (Hours)
Reason Method of Shutting Down (3)
Corrective Actions/Comments No Unit THREE shutdownsforAugust 2004 Legend (I) Type:
F - Forced.
S - Scheduled (2) Reason:
A. - Equipment Failure (Explain)
B. - Maintenance or Test C. - Refueling D.'- Regulatory Restriction E. - Operator Training/License Examination F. - Administrative G. - Operational Error (Explain)
H. - Other (Explain)
(3) Method of Shutting Down:
- 1. - Manual
- 2. - Manual Trip/Scram
- 3. - Automatic Trip/Scram
- 4. - Continuation
- 5. - Other (Explain)
I