Letter Sequence Other |
|---|
|
|
MONTHYEARML0412400182004-04-28028 April 2004 Supplemental Response to the April 29, 2003 Project stage: Request ML0413407322004-05-20020 May 2004 Supplemental Response to the April 29, 2003, Orders Modifying Licenses for Revised Design Basis Threat Project stage: Other ML0419701812004-06-28028 June 2004 RAI Security Plan Sections 1 - 9 Project stage: RAI ML0419800192004-07-0909 July 2004 Request for Additional Information Training and Qualification Plan Project stage: RAI ML0421904392004-07-23023 July 2004 RAI, Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan Project stage: RAI ML0421604132004-07-26026 July 2004 Response to a Request for Additional Information Physical Security Plan Appendix B, Training and Qualification Plan Project stage: Response to RAI ML0423804522004-08-17017 August 2004 Response to a Request for Additional Information Proposed Perry - Nuclear Power Plant Physical Security Plan Section 9.4.1, Appendix C, Safeguards Contingency Plan, and Updates to Previous RAIs Project stage: Response to RAI ML0425302212004-08-31031 August 2004 Updated Responses to Requests for Additional Information (Rais) on the Proposed Perry Nuclear Power Plant Physical Security Plan Project stage: Response to RAI ML0426002492004-09-0909 September 2004 Revision to Proposed Plant Physical Security Plan Submitted April 28, 2004 Project stage: Other ML0426700102004-09-21021 September 2004 Security Plan Provisions for Enhanced Owner Controlled Area Surveillance and Response Project stage: Other ML0428803772004-09-30030 September 2004 Response to Requests for Additional Information on the Proposed Perry Nuclear Power Plant Physical Security Plan Project stage: Response to RAI ML0428005552004-09-30030 September 2004 Transmittal of the Performance Improvement Initiative for Perry Nuclear Power Plant Project stage: Request ML0430102632004-10-13013 October 2004 Revised Draft of the Proposed Perry Nuclear Power Plant Physical Security Plan Project stage: Draft Other ML0431706582004-10-28028 October 2004 Administrative Change to Facility Operating License in Conjunction with the Commission Order EA-03-086 Regarding Revised Design Basis Threat and Revisions to Physical Security Plan, Training and Qualification Plan Project stage: Other ML0432104752004-11-0808 November 2004 Confirmation of Implementation of April 29, 2003 Orders to the Perry Nuclear Power Plant Project stage: Other ML0435602882004-12-10010 December 2004 Comments on the Safety Evaluation for the Perry Nuclear Power Plant Physical Security Plan Project stage: Other 2004-07-23
[Table View] |
Similar Documents at Perry |
|---|
|
Text
FENOC SAFEGUARDS INFORMATION 76 South Mlain Street First Energy Nuclear Operating Company Akron, Ohio 44308 Lew W Myers 330-384-3733 Chief Operating Officer Fax: 330-384-3799 September 9, 2004 PY-CEI/NRR-2828L U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Perry Nuclear Power Plant Docket No: 50-440 Subiect: Revision to Proposed Perry Nuclear Power Plant Physical Security Plan submitted April 28, 2004 (TAC NO. MC2955)
The Nuclear Regulatory Commission (NRC) issued Order EA-03-086, which required compliance with a revised design basis threat, along with other security related Orders for the Perry Nuclear Power Plant (PNPP). By letter dated April 28, 2004 (PY-CEI/NRR-2797L), the FirstEnergy Nuclear Operating Company (FENOC) provided a supplement to previously submitted responses to Order EA-03-086 for PNPP. That submittal included a proposed revision to the PNPP Physical Security Plan (PSP), as required by the Order.
The review of the draft PNPP PSP by the NRC staff resulted in several Requests for Additional Information (RAIs). The proposed revision to the PNPP Physical Security Plan has been modified to incorporate changes based on the resolution of the RAI issues and is enclosed with this letter.
In accordance with 10 CFR 73.21, the enclosure to this document has been determined to contain Safeguards Information, and is thereby exempt from public disclosure.
There are no regulatory commitments contained in this letter or its enclosure. If there are any questions concerning this matter, please contact Mr. Ronald V. Rose, Manager, Site Protection at 440-280-5314.
I declare under penalty of perjury that the foregoing is true and correct. Executed on September i, 2004.
The enclosure to this letter contains "Safeguards Enclosure Information" and must be protected accordingly.
cc:
NRC Region III (with Enclosure)
Upon separation of the NRC Resident Inspector (w/o Enclosure) enclosure, this page is NRC Project Manager (w/o Enclosure) decontrolled.
SAFEGUARDS INFORMATION leo-5