A Tennessee Valley Authority, Post Office Box 2000, Spring City. Tennessee 37381-2000 JUL 13 Man4 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C. 20555 Gentlemen:
In the Matter of
)
Docket No.50-390 Tennessee Valley Authority
)
WATTS BAR NUCLEAR PLANT (WBN) -
JUNE 2004 MONTHLY OPERATING REPORT Provided in the enclosure is the Monthly Operating Report for June 2004 as required by WBN Technical Specification Section 5.9.4.
There are no regulatory commitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824.
Sincerely, P
Pace Manager, Site Licensing and Industry Affairs Enclosure Monthly Operating Report -
June 2004 cc:
See page 2 P.nted on recycled paper 4I-L
U.S. Nuclear Regulatory Commission Page 2 JUL 13 2004 cc (Enclosure):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Ms. M. H. Chernoff, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. M. M. Comar, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303
ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)
MONTHLY OPERATING REPORT JUNE 2004 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1
OPERATING DATA REPORT Docket No.
50-390 Unit Name:
WBN Unit 1 Date:
July 2, 2004 Completed By:
J. L. Kasten Telephone:
(423) 365-8022 Reporting Period:
June 2004
- 1. Design Electrical Rating (MWe-Net):
1155
- 2.
Maximum Dependable Capacity (MWe-Net):
1121 Month
- 3.
Number of Hours Reactor was Critical 720
- 4.
Hours Generator On-Line 720
- 5.
Unit Reserve Shutdown Hours 0.0
- 6.
Net Electrical Energy Generated (MWh) 809,214 Year-to-Date 4331 4325 0.0 4,948,330 Cumulative 65,095 64,777 0.0 71,964,014 E-2
UNIT SHUTDOWNS DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-390 WBN-1 July 2, 2004 J. L. Kasten (423) 365-8022 REPORT PERIOD: June 2004 a
- - -........... 111.1
- Ab u...... 6..........
7 a
acen see
...... d 'C
......... t..........
on, dm"nenv
anse an Correefive'AM L A...............
i R ie' a...
s'd.....
eth 6 d S y o
4 7, D A C
' C...........
............ I................................................
............. o f :.....
d i l! !!!!E RIC A"
a..........
0
- t
!!C 6 PI t..........
............. 11-11.
............. I............. 111.1111::::::::::::::::::::::::::::::.........
e 0 r t.N......
:
44:44-....
I...............................
-. 1......
j i
.... R ea cto r :
N/A N/A N/A N/A N/A N/A N/A N/A N/A The unit operated at or near I 00 percent power for the entire rnonth of June 2004.
1 F: Forced S: Scheduled 21Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain) 4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
(NUREG - 1022)
Summary:
The unit operated at or near 100 percent power for the entire month of June 2004.
E-3