May 10, 2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT - APRIL MONTHLY OPERATING REPORT The enclosure provides the April Monthly Operating Report as required by Sequoyah Technical Specification Section 6.9.1.10.

If you have any questions concerning this matter, please call me at (423) 843-7170 or J. D. Smith at (423) 843-6672.

Sincerely, Original signed by:

Pedro Salas Licensing and Industry Affairs Manager

ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)

MONTHLY OPERATING REPORT APRIL 2004 UNIT 1 DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79

OPERATING DATA REPORT 50-327 DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD:

Sequoyah 1 Renee McKaig (423) 843-8963 Design Electrical Rating Maximum Dependable Capacity (MWe-Net)

1.
2.
3.
4.
5.
6. Net Electrical Energy Generated (MWHrs)

Cumulative Yr-to-Date This Month Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours May 03, 2004 April 2004 719.00 2,809.20 134,797.65 719.00 2,787.58 132,772.16 845,202.00 3,264,313.00 144,899,531.0 0.00 0.00 0.00 1,160.00 1,148.00 UNIT SHUTDOWNS Cause & Corrective Action Comments Method of Shutting Down 2 Reason 1 Duration (Hours)

Type F: Forced S: Scheduled Date No.

SUMMARY

Unit 1 gross maximum dependable capacity factor was 102.1 percent for the month of April.

1 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & License Examination F Administration G Operational Error (Explain)

H Other (Explain) 2 Method:

1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram 4 Continuation 5 Other (Explain)

Page 1

OPERATING DATA REPORT 50-328 DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD:

Sequoyah 2 Renee McKaig (423) 843-8963 Design Electrical Rating Maximum Dependable Capacity (MWe-Net)

1.
2.
3.
4.
5.
6. Net Electrical Energy Generated (MWHrs)

Cumulative Yr-to-Date This Month Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours May 03, 2004 April 2004 719.00 2,514.95 139,239.18 719.00 2,472.38 136,972.34 825,042.00 2,803,548.00 146,785,919.0 0.00 0.00 0.00 1,160.00 1,124.00 UNIT SHUTDOWNS Cause & Corrective Action Comments Method of Shutting Down 2 Reason 1 Duration (Hours)

Type F: Forced S: Scheduled Date No.

SUMMARY

Unit 2 gross maximum dependable capacity factor was 101.7 percent for the month of April.

1 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & License Examination F Administration G Operational Error (Explain)

H Other (Explain) 2 Method:

1 Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram 4 Continuation 5 Other (Explain)

Page 2