PhDuke OPower A Duke Energy Company GARY R. PETERSON Vice President McGuire Nuclear Station Duke Power MG0I VP / 12700 Hagers Ferry Road Huntersville, NC 28078-9340 704 875 5333 704 875 4809 fax grpeters@duke-energy. corn April 15, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Commitment Change Report Attached is a summary report of commitment changes for McGuire Nuclear Station. These changes were made per the guidance defined in NEI 99-04, "Guidelines for Managing NRC Commitments" and have no adverse effect on compliance with NRC rules or regulations.
Questions regarding this submittal should be directed to Kay L. Crane, McGuire Regulatory Compliance at (704) 875-4306.
G. R. Peterson,}
www. duke-energy. corn
U. S. Nuclear Regulatory Commission April 15, 2004 Page 2 xc:
Mr. L. A. Reyes, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. Leonard N. Olshan NRC Senior Project Manager U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 Mr. Joe Brady NRC Senior Resident Inspector McGuire Nuclear Station
U. S. Nuclear Regulatory Commission April 15, 2004 Page 3 bxc:
RGC File MNS Master File ECO50-ELL
McGuire Nuclear Station Commitment Change Summary Report Docket Nos. 369 and 370 NUMBER SOURCE ORIGINAL COMMITMENT j MODIFIED COMMITMENT DOCUMENT T
2002-M-003 May 8, 1989 The May 8, 1989 letter states in part:
The McGuire air quality December 2, 1991 "The acceptance criteria will be acceptance criteria is based on Responses to Generic based on air operated valve vendor vendor recommendations and Letter 88-14 recommendations and ISA-S7.3-NSI/ISA-7.0.01-1996, "Quality 1975, 'Quality Standard for Standard for Instrument Air." The Instrument Air'." The criteria likely 1996 revision provides the will be as follows: 1. Dewpoint following acceptance criteria for temperature at system pressure <35 instrument air quality: 1. Dewpoint degrees, 2. Oil concentration <1 temperature at system pressure 18 PPM, 3. No particles >5 microns degrees F less than lowest ambient detected. The December 2, 1991 temperature, 2. Oil concentration letter states: "Note that McGuire has
<1 PPM, 3. No particles > 40 set the particulate standard at 5 microns detected. McGuire will micron instead of 3 micron as stated continue to perform air quality in the ISA standard. This is based testing at the frequency specified upon our review of manufacturer's in the applicable procedures -
requirements which indicated that Dewpoint every 6 months, Oil and the 5 micron standard is adequate for Particulate once per year.
components served by McGuire's instrument air systems."
2002-M-004 NRC Inspection Finding 91-09-05. "Material The 4kv and the 7kv buses have a 2003-M-001 Report Nos. 50-Condition of Switchgear and PM frequency of 6R with grace.
369/91-09 and 50-Electrical Panels" states: "The Lower voltage buses have a PM 370/91-09 dated Transmission group plans to develop frequency of 6 years. However, a July 31, 1991 and perform a PM inspection to one time exception to the lower Electrical inspect the bus bar connectors at voltage bus PM frequency is Distribution System least every six years which will also allowed if needed to align the Functional require the panels to be cleaned."
lower voltage buses in an overall Inspection (EDSFI) bus matrix schedule.
1