April 2, 2004 LICENSEE: Union Electric Company FACILITIES: Callaway Plant
SUBJECT:
SUMMARY
OF MEETING WITH UNION ELECTRIC COMPANY ON MARCH 23, 2004, TO DISCUSS LICENSEE'S APPLICATION DATED DECEMBER 17, 2003 (TAC NO. MC1756)
A meeting was held on Tuesday, March 23, 2004, between the NRC staff and Union Electric Company, the licensee for the Callaway Plant. The meeting was held at the request of the NRC to discuss the licensees application dated December 17, 2003, to revise Technical Specifications (TSs) 3.3.1, "Reactor Trip System (RTS) Instrumentation," 3.3.2, "Engineered Safety Feature Actuation System (ESFAS) Instrumentation," and 3.3.9, "Boron Dilution Mitigation System (BDMS)." A notice of this application was published in the Federal Register on February 3, 2004 (69 FR5211). The notice of the meeting was issued by the NRC on March 9, 2004. is the list of attendees. Enclosure 2 is the licensee's handout which was sent to the staff by e-mail prior to the meeting and is available in ADAMS under Accession No. ML040850191. The staff did not provide a handout at the meeting.
As stated in the licensee's application, the license amendment request (LAR) is based on the following two NRC-approved Westinghouse topical reports (TR): WCAP-14333-P-A, Revision 1, "Probabilistic Risk Analysis of the RPS [reactor protection system] and ESFAS
[engineered safety features actuation system] Test Times and Completion Times," dated October 1998, and WCAP-15376-P-A, Revision 1, "Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times,"
dated March 2003. TSs approved by the NRC to incorporate these two TRs into plant TSs are in NRC-approved Technical Specification Task Force (TSTF)-418 (Revision 2) and TSTF-411 (Revision 1), respectively.
The meeting was a discussion of the licensee's responses to the questions that were sent to the licensee prior to the meeting. The NRC questions and the licensee's responses are in the licensee's handout.
The licensee's responses were to (1) point out where in the licensee's application is the information needed by the staff to review the LAR, and (2) explain what is stated in the application as justifications for the LAR if the licensee believes that the information in the application needed clarification. This roadmap for the licensee's application is to expedite the staffs review of the licensees application; however, the staff's decisions on the licensees application will not be based on any part of the discussions conducted in the meeting. The staff's decisions will be based on what is stated in the licensee's application and on the licensee's responses to any future staff questions. Any future staff questions on what is stated in the application will be the subject of future correspondence between the staff and the licensee.
There was also a discussion on the licensee's proposed change to Condition D for TS 3.3.1 because the proposed change was different from the Condition D that is given in the NRC-approved TSTF-418.
The meeting ended at the end of the discussions on the licensee's responses to the staff's questions. The staff made no decisions about the licensee's application in the meeting.
/RA/
Jack Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosure:
List of Meeting Attendees cc w/encl: See next page April 2, 2004 in the application will be the subject of future correspondence between the staff and the licensee.
There was also a discussion on the licensee's proposed change to Condition D for TS 3.3.1 because the proposed change was different from the Condition D that is given in the NRC-approved TSTF-418.
The meeting ended at the end of the discussions on the licensee's responses to the staff's questions. The staff made no decisions about the licensee's application in the meeting.
/RA/
Jack Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosure:
List of Meeting Attendees cc w/encl: See next page DISTRIBUTION:
PUBLIC PDIV-2 Reading RidsNrrDlpm (TMarsh/ELeeds)
RidsNrrDlpmPdiv(HBerkow)
RidsNrrPMJDonohew RidsNrrLAEPeyton RidsRgn4MailCenter (WJohnson, RIV)
RidsOgcRp RidsAcrsAcnwMailCenter CSchulten TAttard TMensha RTadessee, EDO ADAMS ACCESSION NO.: ML040970259 HANDOUTS: ML040850191 MEETING NOTICE: ML040690115 PACKAGE: ML040970286 OFFICE PDIV-2/PM PDIV-2/LA TSS-A PDIV-2/SC NAME JDonohew:mp EPeyton CSchulten SDembek DATE 4/2/04 4/1/04 4/2/04 4/2/04 DOCUMENT NAME: C:\\MYFILES\\Copies\\4-2-04 Sum Mtg w Union Electric.wpd OFFICIAL RECORD COPY
Callaway Plant, Unit 1 cc:
Professional Nuclear Consulting, Inc.
19041 Raines Drive Derwood, MD 20855 John ONeill, Esq.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.
Washington, D.C. 20037 Mr. Mark A. Reidmeyer, Regional Regulatory Affairs Supervisor Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 U.S. Nuclear Regulatory Commission Resident Inspector Office 8201 NRC Road Steedman, MO 65077-1302 Mr. Chris Younie Manager, Quality Assurance AmerenUE P.O. Box 620 Fulton, MO 65251 Manager - Electric Department Missouri Public Service Commission 301 W. High P.O. Box 360 Jefferson City, MO 65102 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Mr. Ronald A. Kucera Deputy Director for Public Policy Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KA 66839 Mr. Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, MO 63130 Mr. Lee Fritz, Presiding Commissioner Callaway County Court House 10 East Fifth Street Fulton, MO 65151 Mr. David E. Shafer Superintendent, Licensing Regulatory Affairs AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149 Mr. Keith D. Young Manager, Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 Mr. Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, MO 65102-0570 Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 Mr. Garry L. Randolph Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, MO 65251
MEETING ATTENDEES MEETING WITH UNION ELECTRIC COMPANY MARCH 23, 2004 AMEREN UE B. Yates WOLF CREEK NUCLEAR OPERATING CORPORATION S. Wideman NRC J. Donohew C. Schulten T. Attard