February 2004 Monthly Operating Report for Beaver Valley, Units 1 and 2
ML040760714
Person / Time
Site: Beaver Valley
Issue date: 03/08/2004
From: Pearce L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-04-031
Download: ML040760714 (3)


Text

FENO C Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077 L-04-031 March 8, 2004 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2-- Docket No. 50-412, License No:NPF -

Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit I and Unit 2 for the month of February, 2004. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System. No regulatory commitments are contained in this submittal.

Respectfully, LNtQ.

L. W. Pearce Vice-President BVPS DTJ/cmg Enclosures cc:

NRC Regional Office King of Prussia, PA

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-334 Beaver Valley 1 March 01, 2004 David T. Jones (724) 682-4962 February 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 835.00 821.00

3. Number of Hours the Reactor was Critical
4.

Number of Hours Generator On-line

5. Reseive Shutdown Hours
6.

Net Electrical Energy Generated (MWHrs)

This Month 696.00 696.00 0.00 588,130.00 Yr-to-Date 1,440.00 1,440.00 0.00 1,211,120.00 Cumulative 169,467.27 166,937.82 0.00 125,852,492.0 UNIT SHUTDOWNS Type Method of F.: Forced Duration l Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments NONE.

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain) 2 Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

SUMMARY

The Unit operated at a nominal-value of 100% output for the entire report period.--

Page 1 of 1

d OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-412 Beaver Valley 2 March 01, 2004 David T. Jones (724) 682-4962 February 2004

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 836.00 831.00

3. Number of Hours the Reactor was Critical
4.

Number of Hours Generator On-line

5.

Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWHrs)

This Month 696.00 696.00 0.00 589,812.00 Yr-to-Date 1,440.00 1,440.00 0.00 1,218,479.00 Cumulative 119,048.48 118,304.38 0.00 93,037,877.00 UNIT SHUTDOWNS Type Method of F.: Forced Duration l Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments NONE.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

Page 1 of 1