{{#Wiki_filter:N~MC CommIttedto NucearExcelle Palisades Nuclear Plant Operated by Nuclear Management Company, LLC February 23, 2004 10 CFR 26.71 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Semi-Annual Fitness For Duty Program Performance Report July 1. 2003, Through December 31. 2003 In accordance with 10 CFR 26.71(d), Nuclear Management Company, LLC, is providing the Semi-Annual Fitness For Duty Program Performance Report for the Palisades Nuclear Plant and the support locations for the period of July 1, 2003, through December 31, 2003. Enclosures 1 and 2 summarize the test results at the Palisades Nuclear Plant and the support locations. Summary of Commitments This letter tai new commitments and no revisions to existing commitments. Daniel J. Male Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosures (2) CC Administrator, Region IIl, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC NAZ(. LI 27780 Blue Star Memorial Highway

  • Covert, Michigan 49043-9530 Telephone: 269.764.2000

ENCLOSURE I SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE

SUMMARY

July - December 2003

1. MANAGEMENT

SUMMARY

A. RANDOM TESTING During this reporting period, Nuclear Management Company conducted a total of 239 random tests with the following results: Donor Group Random Tests Results Employees 152 Random testing identified one positive drug/alcohol result. Random testing did not identify any positive drug/alcohol results. Contractors 87 The positive drug/alcohol rate for 2003 contractors: indicates a stable trend for employees and Random Tests Emnlovees CN's Positive Rate Employees CN's Leading Substance Cocaine THC 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 652 665 629 891 767 496 536 438 482 366 144 207 216 120 208 140 53 131 122 156 0.2% 0.0% 0.2% 0.2% 0.5% 0.2% 0.0% 0.0% 0.0% 0.3% 0.7% 0.5% 0.9% 0.8% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 1 1 1 2 3 3 1 1 B. PRE-ACCESS TESTING A total of 177 pre-access tests were conducted during this reporting period. One (1) individual was denied access based on positive test results. C. FOR CAUSE TESTING No "For Cause" testing was required during this reporting period. Page 1 of 2

ENCLOSURE1 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE

SUMMARY

July - December 2003 D. APPEALS The appeal process was not initiated during this reporting period.

2. REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, Palisades Nuclear Plant did not encounter any Fitness for Duty event that required reporting under 10 CFR 26.73.

Page 2 of 2

ENCLOSURE 2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA July - December 2003 Nuclear Management Company Company December 31, 2003 6 Months Ending Palisades Nuclear Plant Location Jefferv J Fletcher 269-764-2575 Contact Name Phone (include Area Code) Cutoffs: Screen/Confirmation (ng/ml) : Appendix A to 10 CFR 26 Marijuana Cocaine Opiates I I I Amphetamines Phencyclidine l l l l Alcohol (% BAC)* l

  • Any detectable amount for situations other than random.

Long-Term Short-Term Testing Results Licensee Contractor Contractor Employees Personnel Personnel Average Number With Unescorted Access 596 N/A 227

  1. Tested
  2. Positive
  3. Tested
  4. Positive
  5. Tested
  6. Positive Categories l

Pre-Access 40 0 126 1 FOR Post-Accident 0 0 0 0 CAUSE Observed 0 0 0 0 Behavior Random 122 1 79 0 Follow-up 31 0 5 0 Other 0 0 l 0 0 TOTAL 193 1 210 1 Page 1 of 4

ENCLOSURE2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA I.. July - December 2003 Breakdown of Confirmed Positive Tests for Specific Substances Amphe-Phency-Refusal Marijuana l Cocaine Opiates tamines clidine Alcohol to Test 1 2 3 4 5 Licensee Employees 1 = Long-Term Contractors I =

=

Short-Term Contractors I A Total I_ 1 1== lII I I 2 l Page 2 of 4

ENCLOSURE 2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA July - December 2003 Nuclear Manaciement Comnany December 31, 2003 Company 6 Months Ending Support Location Jeffery J Fletcher 269-764-2575 Contact Name Phone (include Area Code) Cutoffs: Screen/Confirmation (ng/ml): Appendix A to 10 CFR 26 Marijuana / Amphetamines I Cocaine / Phencyclidine / I Opiates / Alcohol (% BAC)* I

  • Any detectable amount for situations other than random.

Long-Term Short-Term Testing Results Licensee Employees Contractor Contractor Personnel Personnel Average Number With Unescorted Access 70 N/A 19 Categories

  1. Tested
  2. Positive
  3. Tested
  4. Positive
  5. Tested
  6. Positive Pre-Access 11 0

0 0 FOR Post-Accident 0 0 0 0 CAUSE Observed 0 0 0 0 Behavior Random 30 0 8 0 Follow-up 0 0 0 0 Other 0 0 0 0 TOTAL 41 0 8 0 Page 3 of 4

ENCLOSURE2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA July - December 2003 Breakdown of Confirmed Positive Tests for Specific Substances Amphe-Phency-Refusal Marijuana Cocaine Opiates tamines clidine Alcohol to Test 1 2 3 4 5 Licensee Employees Long-Term Contractors = = = = = = = = Short-Term Contractors A Total I I I I I I I I I I I I =3 Page 4 of 4}}