ML040220834
| ML040220834 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 01/22/2004 |
| From: | Troy Pruett Plant Support Branch Region IV |
| To: | Forbes J Entergy Operations |
| References | |
| IR-03-013 | |
| Download: ML040220834 (5) | |
See also: IR 05000313/2003013
Text
DOCUMENT CONTAINS
SAFEGUARDS INFORMATION
DOCUMENT CONTAINS
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION
UPON SEPARATION THIS
PAGE IS DECONTROLLED
January 22, 2004
Jeffrey S. Forbes, Site Vice President
Arkansas Nuclear One
Entergy Operations, Inc.
1448 S.R. 333
Russellville, AR 72801-0967
SUBJECT: ARKANSAS NUCLEAR ONE - NRC PHYSICAL SECURITY LIMITED BASELINE
INSPECTION REPORT 05000313/2003013 AND 05000368/2003013
Dear Mr. Anderson:
On August 28, 2003, the NRC completed the onsite portion of an inspection at your Arkansas
Nuclear One facility. The enclosed report documents the inspection findings, which were
discussed on January 12, 2004, with Mr. Richard Scheide, Licensing Engineer, and other
members of your staff.
This inspection examined activities conducted under your licenses as they relate to safety and
compliance with the Commissions rules and regulations and with the conditions of your
licenses. Within these areas, the inspection consisted of selected examination of procedures
and representative records, observations of activities, and interviews with personnel.
The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21
and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy
Act of 1954, as amended. Therefore, the material will not be placed in the Public Document
Room.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, without
enclosure, will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Entergy Operations, Inc.
DOCUMENT CONTAINS
SAFEGUARDS INFORMATION
-2-
DOCUMENT CONTAINS
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION
UPON SEPARATION THIS
PAGE IS DECONTROLLED
Should you have any questions concerning this inspection, we would be pleased to discuss
them with you.
Sincerely,
//RA//
Troy W. Pruett
Plant Support Branch
Division of Reactor Safety
Dockets: 50-313
50-368
Licenses: DPR-51
Enclosure:
NRC Inspection Report
05000313; 05000368/2003-013 w/Attachment:
Supplemental Information
cc without safeguards enclosure:
Senior Vice President
& Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Manager, Washington Nuclear Operations
ABB Combustion Engineering Nuclear
Power
12300 Twinbrook Parkway, Suite 330
Rockville, MD 20852
Entergy Operations, Inc.
DOCUMENT CONTAINS
SAFEGUARDS INFORMATION
-3-
DOCUMENT CONTAINS
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION
UPON SEPARATION THIS
PAGE IS DECONTROLLED
County Judge of Pope County
Pope County Courthouse
100 West Main Street
Russellville, AR 72801
Winston & Strawn
1400 L Street, N.W.
Washington, DC 20005-3502
Bernard Bevill
Radiation Control Team Leader
Division of Radiation Control and
Emergency Management
4815 West Markham Street, Mail Slot 30
Little Rock, AR 72205-3867
Mike Schoppman
Framatome ANP, Inc.
Suite 705
1911 North Fort Myer Drive
Rosslyn, VA 22209
SAFEGUARDS INFORMATION
-4-
DOCUMENT CONTAINS
ENCLOSURE(S) CONTAIN(S)
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION
UPON SEPARATION THIS
PAGE IS DECONTROLLED
cc w/encl (SAFEGUARDS INFORMATION)
E. McNeil (NSIR/DNS/RSS)
B. Westreich (NSIR/DNS)
RIV Docket File - File Room Custodian
Security Inspector (Pick)
Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (RWD)
Branch Chief, DRP/D (LJS)
Senior Project Engineer, DRP/D (JLT2)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
Anne Boland, OEDO RIV Coordinator (ATB)
ANO Site Secretary (VLH)
ADAMS: Yes
No Initials: _TWP_____
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
DOCUMENT: ML040220834.wpd
RIV: PSB/PSI
PSB/SPSI
DRP/D
C:PSB
JLBuchanan:jlh
GAPick
JAClark
TWPruett
/RA/
/RA/
/RA/
1/15 /04
1/ /04
1/16 /04
1/15 /04
OFFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax