R 10 An Energy East Company ROCHESTER GAS AND ELECTRC CORPORATION
- 89 EASTAVENUE, ROCHESTER, NMY 14649-0001
- 585 546-2700 wwwrge.com January 9, 2004 US Nuclear Regulatory Commission Document Control Desk Attn:
Robert Clark Project Directorate 1-1 Washington, DC 20555
Subject:
Monthly Report for December 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Clark:
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of December 2003.
Very truly yours, e
A. WidayZ Plant Manager xc:
U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)
Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-244 Ginna 1 January 09, 2004 John V. Walden (585) 771-3588 December 2003
- 1.
Design Electrical Rating
- 2. Maximum Dependable Capacity (MWe-Net) 470.00 480.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 369,071.00 Yr-to-Date 7,981.32 7,926.60 0.00 3,868,592.00 Cumulative 246,998.22 243,785.70 8.50 111,197,501.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
- The unit began the month of December operating at full power. An automatic turbine runback occurred on December 12, 2003 due to a failure of the B Battery Charger. Power was reduced to 94% for five hours. Full power operations were restored on December 13, 2003 and remained there through the end of the month. Average power for the month of December was 99.7%.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)