Text

R 10 An Energy East Company ROCHESTER GAS AND ELECTRC CORPORATION

  • 89 EASTAVENUE, ROCHESTER, NMY 14649-0001
  • 585 546-2700 wwwrge.com January 9, 2004 US Nuclear Regulatory Commission Document Control Desk Attn:

Robert Clark Project Directorate 1-1 Washington, DC 20555

Subject:

Monthly Report for December 2003 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of December 2003.

Very truly yours, e

A. WidayZ Plant Manager xc:

U.S. Nuclear Regulatory Commission Mr. Robert Clark (Mail Stop O-8E9)

Project Directorate 1-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-244 Ginna 1 January 09, 2004 John V. Walden (585) 771-3588 December 2003

1.

Design Electrical Rating

2. Maximum Dependable Capacity (MWe-Net) 470.00 480.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 369,071.00 Yr-to-Date 7,981.32 7,926.60 0.00 3,868,592.00 Cumulative 246,998.22 243,785.70 8.50 111,197,501.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit began the month of December operating at full power. An automatic turbine runback occurred on December 12, 2003 due to a failure of the B Battery Charger. Power was reduced to 94% for five hours. Full power operations were restored on December 13, 2003 and remained there through the end of the month. Average power for the month of December was 99.7%.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 1