Facility Request for Waiver W/O Enclosures Dtd 12/23/2002
ML033160420
Person / Time
Site: Pilgrim
Issue date: 12/23/2002
From: Riggs W
Entergy Nuclear Operations
To: Miller H
Region 1 Administrator
Conte R
References
2.01.108, 50-293/03-301
Download: ML033160420 (3)


Text

Entergy Nuclear Opratlons, Inc.

Pagrim Station 6ooFicckyHillRoad ph/mouth.MA02360 Willlam J. Riggr Dirclr;tcr. Nebxu kscsnwrt December 23,2002 Mr. Hubert J. Miller Regional Administrator Region 1 US. Nudear Regulatory Commission 475 Allendale Road King of Prussia. Pennsylvania 19406-1 41 5 SUWECT Entergy Nuclear Operations, Inc.

Pilgrlm Nuclear Power Station Docket No. 50-293 License No. DPR-35 Request for a Waiver of Examination and rest Requirements in Accordance with I O CFR 55.47 LETTER NUMBER: 2.02.108

Dear Mr. Miller:

In accordance with 10 CFR 55.1 1, Pilgrim Station requests an exemption from 10 CFR 55.47:.

Waiver of Examination and Test Requirements: specifically. 10 CFR 55.47 (a) (1). The details.

of the request are in Enclosure 1. This bxemption is in reference to an individual.who has previously held an SRO License at Pilgrim Station.

Name Ucense No.

Docket No, I

3.

Richard M. Probasco SOP-10890-1 55-61 290 In accordance with the guidelines set forth in 10 CFR 55.47, Enclosure 2 contains the proposed training plan for Mr. P robasco. Approval of this plan by the NRC is the basis for a waiver in accordance with the provislon of 10 CFR 55.47, "Waiver of ExamInation and Test Requlrements". contains Mr. Probasco's draft form 398 for your review as per discussion with your staff ftelecom with Mr. Allen Blarney on 12/06/02). A completed Form NRC-369 "Certification of Medical Examinatlon by Facitity Licensee" will follow under separate cover.

2.01.108

Entergy Nuclear Operations, fnc.

Pilgrim Nuclear Power Station Letter Number: 2.02.108 Page 2 Mr. Probasco is scheduled to complete his training in January of 2003. from the period in which the training is complete until the issuance of the license, he will not be acting in the capacity of a licensed SRO or Shift Manager.

Your prompt attention to this matter is greatly appreciated.

If you should have any questions regarding this issue, please do not hesitate to contact Mr.

Bryan Ford at (508) 830-8403.

Slncerely,

~7 W.J. Riggs Director, Nu.ciear Assessment

Enclosures:

1. Request for Exemption from 10 CFR 50.47 (a) (1) Justification (1 page)
2. Request for 10 CFR 55.47 'Waiver of examination and test requirements" (7 pages) 3 Completed NRC Form 398 (2 pages) cc:

Senior Resident inspector Pilgrim Nuclear Power Station 2.01.1 08

ENCLOSURE 1 Request for Exemption from 10 CFR 50.47 (a) (I)

Justtfication

....:,