ML032940051

From kanterella
Jump to navigation Jump to search
Tech Spec for Point Beach, Unit 1 and 2, License Amendment, Re Allowed Outage Time for the Control Room Emergency Filtration System from 7 Days to 30 Days
ML032940051
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/16/2003
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML032940051 (1)


Text

CREFS 3.7.9 3.7 PLANT SYSTEMS 3.7.9 Control Room Emergency Filtration System (CREFS)

LCO 3.7.9 CREFS shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, 4, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A.

CREFS inoperable.

A.1 Restore CREFS to 7 days OPERABLE status.

B. Required Action and B.1 Suspend CORE Immediately associated Completion ALTERATIONS.

Time not met.

AND B.2 Suspend movement of Immediately irradiated fuel assemblies.

AND B.3 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> AND B.4 Be In MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I

I Point Beach 3.7.9-1 Unit I - Amendment No. 263, 210 Unit 2 - Amendment No. 208, 215