ML032940007

From kanterella
Jump to navigation Jump to search
Requalification Program Inspection - Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Dtd 10/20/03
ML032940007
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/20/2003
From: Conte R
Division of Reactor Safety I
To: Vanderheyden G
Constellation Generation Group
Barr S, RI/DRS/OSB, (610) 337-5316
Shared Package
ML031960080 List:
References
Download: ML032940007 (2)


Text

October 20, 2003 Mr. George Vanderheyden, Vice President Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2

Dear Mr. Vanderheyden:

In a telephone conversation on October 16, 2003, Mr. Stephen Barr, Examiner/Inspector, and Mr. Dominic Lavato, Supervisor, Requalification Training Unit, made arrangements for the NRC to inspect the licensed operator requalification program at the Calvert Cliffs facility. The inspection is planned for the week of December 15, 2003, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRCs inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of conditions reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating tests scheduled for the week of the inspection to the NRC by December 4, 2003. Mr.

Lavato has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

Mr. George Vanderheyden The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Steve Barr at (610) 337-5316.

Sincerely,

/RA/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket Nos.

50-317/50-318 License Nos. DPR-53/DPR-69 cc:

President, Calvert County Board of Commissioners J. M. Petro, Esquire, Constellation Energy Group, Inc.

J. E. Silberg, Esquire, Shaw, Pittman, Potts and Trowbridge M. Geckle, Manager of Operations (CCNPP)

R. McLean, Manager, Nuclear Programs Julie Sickle, Director, Nuclear Training K. Burger, Esquire, Maryland Peoples Counsel P. T. Birnie, Esquire, Maryland Safe Energy Coalition L. F. Donatell, NRC Technical Training Center P. Furio, Acting Director, Nuclear Regulatory Matters (CCNPP)

State of Maryland (2)

Mr. George Vanderheyden Distribution:

J. Jolicoeur, RI EDO Coordinator R. Laufer, NRR G. Vissing, PM, NRR R. Clark/P. Tam, PM, NRR (Backup)

J. Trapp, DRP N. Perry, DRP M. Giles, SRI - Calvert Cliffs J. OHara, DRP - RI - Calvert Cliffs Region I Docket Room (with concurrences)

S. Barr, DRS Examiner, DRS C. Buracker, DRS (OL Facility File)

L. Vick, HOHB, NRR R. Conte, DRS DOCUMENT NAME: G:\\OSB\\Barr/CCRequaldEC03/60dayrpi. ADAMS PKG:ML031960080 After declaring this document An Official Agency Record it will/will not be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CBuracker SBarr RConte DATE 10/20/03 10/17/03 10/20/03 10/ /03 10/ /03 OFFICIAL RECORD COPY