ML032900975
| ML032900975 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 10/10/2003 |
| From: | Abney T Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| R08 031010 660 | |
| Download: ML032900975 (8) | |
Text
R08 031010 660 October 10, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN, P1-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of
)
Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - SEPTEMBER 2003 MONTHLY OPERATING REPORT The enclosure provides the September 2003 Monthly Operating Report (MOR) as required by BFN Technical Specifications, Section 5.6.4.
If you have any questions concerning this report, please call me at (256) 729-2636.
Sincerely, Original signed by:
T. E. Abney Manager of Licensing and Industry Affairs Enclosure
U.S. Nuclear Regulatory Commission Page 2 October 10, 2003 DTL:JEW:BAB Enclosure cc (Enclosure):
D. K. Baker, BR 3H-C A. S. Bhatnagar, PAB 1E-BFN M. J. Burzynski, BR 4X-C J. E. Maddox, LP 6A-C T. J. Niessen, PAB 1A-BFN D. C. Olcsvary, LP 6A-C C. M. Root, PAB 1G-BFN J. R. Rupert, NAB 1A-BFN K. W. Singer, LP 6A-C M. D. Skaggs, POB 2C-BFN E. J. Vigluicci ET 11A-K NSRB Support, LP 5M-C EDMS-K S:lic/submit/subs/MORSeptember2003.doc
ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
MONTHLY OPERATING REPORT SEPTEMBER 2003 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68
E-2 OPERATING DATA REPORT Docket No.
50-259 Unit Name BFN Unit 1 Date October 8, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period September 2003
- 1.
Design Electrical Rating (Net MWe):
1065
- 2.
Maximum Dependable Capacity (MWe-Net) 0 Month Yr-to-Date Cumulative*
- 3.
Number of Hours Reactor was Critical 0
0 59521
- 4.
Hours Generator On-Line 0
0 58267
- 5.
Unit Reserve Shutdown Hours 0
0 0
- 6.
Net Electrical Energy Generated (MWh) 0 0
53,796,427
- Excludes hours under Administration Hold (June 1, 1985 to Present)
OPERATING DATA REPORT Docket No.
50-260 Unit Name BFN Unit 2 Date October 8, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period September 2003
- 1.
Design Electrical Rating (Net MWe):
1120
- 2.
Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative
- 3.
Number of Hours Reactor was Critical 720 5965 154,372
- 4.
Hours Generator On-Line 720 5937 151,699
- 5.
Unit Reserve Shutdown Hours 0
0 0
- 6.
Net Electrical Energy Generated
E-3 (MWh) 805,184 6,181,847 151,334,573 OPERATING DATA REPORT Docket No.
50-296 Unit Name BFN Unit 3 Date October 8, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period September 2003
- 1.
Design Electrical Rating (Net MWe):
1120
- 2.
Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative
- 3.
Number of Hours Reactor was Critical 720 6267 111,515
- 4.
Hours Generator On-Line 720 6254 110,077
- 5.
Unit Reserve Shutdown Hours 0
0 0
- 6.
Net Electrical Energy Generated (MWh) 799,773 6,864,095 112,846,965
E-4 UNIT SHUTDOWNS REPORT MONTH: SEPTEMBER 2003 DOCKET NO:
50-259 UNIT NAME:
BFN-1 DATE:
October 8, 2003 COMPLETED BY:
J. E. Wallace TELEPHONE:
(256) 729-7874 No.
Date Type F: Forced S: Scheduled Duration (Hours)
Reason1 Method of Shutting Down Reactor2 Cause and Corrective Action to Prevent Recurrence 1
06/01/85 S
720 F
4 Administrative hold to resolve various TVA and NRC concerns.
1 Reason:
2 Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction E-Operator Training / License Examination 4-Continuation Outage 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
- Unit 1 has been on administrative hold since June 1, 1985.
E-5 UNIT SHUTDOWNS REPORT MONTH: SEPTEMBER 2003 DOCKET NO:
50-260 UNIT NAME:
BFN-2 DATE:
October 8, 2003 COMPLETED BY:
J. E. Wallace TELEPHONE:
(256) 729-7874 No.
Date Type F: Forced S: Scheduled Duration (Hours)
Reason1 Method of Shutting Down Reactor2 Cause and Corrective Action to Prevent Recurrence N/A 1 Reason:
2 Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction E-Operator Training / License Examination 4-Continuation Outage 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
- Unit 2 has operated at or near 100 percent available power.
E-6 UNIT SHUTDOWNS REPORT MONTH: SEPTEMBER 2003 DOCKET NO:
50-296 UNIT NAME:
BFN-3 DATE:
October 8, 2003 COMPLETED BY:
J. E. Wallace TELEPHONE:
(256) 729-7874 No.
Date Type F: Forced S:
Scheduled Duration (Hours)
Reason1 Method of Shutting Down Reactor2 Cause and Corrective Action to Prevent Recurrence N/A 1 Reason:
2 Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction E-Operator Training / License Examination 4-Continuation Outage 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
- Unit 3 has operated at or near 100 percent available power.