AmerenUE Callaway Plant PO Box 620 Fulton, MO 65251 July 10, 2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1 -137 Washington, DC 20555-0001 WAmeien UE ULNRC 04872 Ladies & Gentlemen:
DOCKET NUMBER 50483 UNION ELECTRIC CO.
CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT JUNE/2003 The enclosed Monthly Operating Report for June/2003 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.
Warren A. Witt Manager, Callaway Plant WAW/JER/slk Enclosure
, -, jj-' -
a subsidiary of Amremn Corporation
-I-ULNRC04872 July 10, 2003 Page 2 cc: Mr. Thomas P. Gwynn Acting Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102
Enclosure ULNRC04872 July 10, 2003 DOCKET NO.:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
FAX:
50-483 CALLAWAY UNIT 1 J. E. Ready 573/676-8617 573/676-4202 REPORTING PERIOD:
June/2003
- 1.
DESIGN ELECTRICAL RATING (MWe-Net): 1171
- 2.
MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE 3.
4.
5.
6.
NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON-LINE REACTOR RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 720 720 0.0 831288 4077.5 4062.5 0.0 4710933 145594.5 143658.5 0.0 158255029 Page 1 of 2
Enclosure ULNRC004872 July 10, 2003 UNIT SHUTDOWNS DOCKET NO.:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
FAX:
50-483 CALLAWAY UNIT I J. E. Ready 573/676-8617 573/676-4202 REPORT: JUNE/2003 TYPE F: FORCED NO.
DATE S: SCHEDULED DURATION (HOURS)
METHOD OF SHUTTING DOWN REASON THE REACTOR CORRECTIVE ACTIONS/
COMMENTS
SUMMARY
The Callaway Plant operated at approximately 100% power, for the month of June.
REASON A: EQUIPMENT FAILURE (EXPLAIN)
B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING / LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN)
METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM
- 4. CONTINUATION 5: OTHER (EXPLAIN)
Page 2 of 2