ML030790091
| ML030790091 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 03/14/2003 |
| From: | Gambhir S Omaha Public Power District |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LIC-03-0035 | |
| Download: ML030790091 (2) | |
Text
jjOB Omaha Public Power Distnct Fort Calhoun Station P.O. Box 550, Highway 75 Fort Cal/hotn, NE 68023-0550 March 14, 2003 LIC-03-0035 U. S. Nuclear Regulatory Commission ATTN.: Document Control Desk Washington, DC 20555
References:
SUBJECT:
- 1.
Docket No. 50-285
- 2.
Letter from NRC (W. F. Burton) to OPPD (R. T. Ridenoure) dated February 20, 2003 (NRC-03-036)
- 3.
Letter from OPPD (S. K. Gambhir) to NRC (Document Control Desk) dated March 14, 2003 (LIC-03-0036)
Responses to Potential Open Items for the Review of the License Renewal Application for Fort Calhoun Station, Unit 1 The attachment to this letter provides the Omaha Public Power District (OPPD) responses to the Potential Open Items (POIs) identified in the Reference 2 letter. As discussed with W. F.
Burton, this submittal includes as appendices revisions to various tables in the Fort Calhoun Station License Renewal Application that are associated with the responses to POIs and Requests for Additional Information. In addition, some table revisions correct miscellaneous errors identified by OPPD.
OPPD is also providing under separate cover letter (Reference 3) paper and electronic sets of revised license renewal boundary and additional drawings noted in the above responses. These drawings are not considered part of the LRA.
If you have any questions or require additional information, please contact T. C. Matthews at (402) 533-6938.
Commitments to the NRC are included in this letter. These commitments are summarized at the end of the attachment; some of them may duplicate or revise commitments previously included in the Fort Calhoun Station License Renewal Application.
Employment with Equal Opportunity
U. S. Nuclear Regulatory Commission LIC-03-0035 Page 2 I declare under penalty of perjury that the foregoing is true and correct. (Executed on March 14, 2003)
S~iincely, S. K. Gambhir Division Manager Nuclear Projects TCM/tcm Attachment c:
E. W. Merschoff, NRC Regional Administrator, Region IV W. C. Walker, NRC Region IV, Senior Project Engineer W. F. Burton, NRC Project Manager A. B. Wang, NRC Project Manager J. G. Kramer, NRC Senior Resident Inspector Division Administrator - Public Health Assurance, State of Nebraska Winston & Strawn