ML030770504
| ML030770504 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley, Millstone, Salem, Mcguire, Indian Point, Kewaunee, Catawba, Harris, Wolf Creek, Point Beach, Watts Bar, Sequoyah, Byron, Braidwood, Summer, Prairie Island, Seabrook, Surry, North Anna, Turkey Point, Ginna, Diablo Canyon, Callaway, Vogtle, Farley, Robinson, South Texas, Cook, Comanche Peak, McGuire, PROJ0694 |
| Issue date: | 03/12/2003 |
| From: | Bryan R Westinghouse Owners Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| WOG-03-144 WCAP-15666, Rev 0 | |
| Download: ML030770504 (2) | |
Text
WOG-03-144 March 12, 2003 Domestic Members AmerenUE Callaway American Electric Power Co DC Cook I & 2 Carolina Power & Light Co.
H B Robinson 2 Shearon Harris Dominion Nuclear Connecticut Milstone 3 Dominion Virginia Power NorthAnna 1 & 2 Sur1y I & 2 Duke Power Company Catawba I & 2 McGuirae
& 2 Entergy Nuclear Operations Inc.
Indian Point 2 & 3 Exelon Generation Company LLC Braidwood 1 & 2 Byron 1 & 2 FirstEnergy Nuclear Operating Co.
Beaver Valley I & 2 Florida Power & Ught Co Turkey Point 3 & 4 Northeast Utilities Seabrook Nuclear Management Co Point Beach 1 & 2 Prairie Island 1 & 2 Kewaunee Pacific Gas & Electric Co.
Diablo Canyon 1 & 2 PSEG - Nuclear Salem 1 & 2 Rochester Gas & Electric Co.
R E Ginna South Carolina Electric
& Gas Co.
VC Summer STP Nuclear Operating Co.
South Texas Project 1 & 2 Southern Nuclear Operating Co.
JM Farley 1 & 2 AW Vogtle 1 & 2 Tennessee Valley Authority Sequoyah 1 & 2 Watts Bar 1 TXU Electric Cornmanche Peak 1 & 2 Wolf Creek Nuclear Operating Corp.
Wolf Creek International Members Electrabel Doel 1, 2, 4 Thange 1.3 Electricite de France Kansai Electric Power Co Mihama 1 Takahama 1 Oh 1 & 2 Korea Hydro & Nuclear Power Co.
Kon I - 4 Yonggwang 1 & 2 British Energy plc Sizewell B Krsko Krsko Spanish Utilities Asco 1 &2 Vandellos 2 Almaraz 1 & 2 Ringhals AS Rirghals 2 - 4 Taiwan Power Co.
Maanshan 1 & 2 WCAP-15666, Rev. 0 Project Number 694 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attention:
Chief, Information Management Branch, Division of Inspection and Support Programs
Subject:
Westinghouse Owners Group Request for Review of TSTF-421, Rev. 0 (MUU-P-3043)
References:
- 1. WOG Letter, R. Bryan to Document Control Desk, "Transmittal of WCAP 15666, "Transmittal ofWCAP-15666, "Extension of Reactor Coolant Pump Motor Flywheel Examination," OG-01-051, August 24, 2001.
- 2. Industry/TSTF Standard Technical Specification Change Traveler, TSTF-421, Rev. 0, "Revision to RCP Flywheel Inspection Program (WCAP-15666)"
- 3. NRC letter dated January 10, 2003, from W.D. Beckner, NRC, to T.
Pietrangelo, NEI In August 2001, the Westinghouse Owners Group (WOG) submitted WCAP 15666, Rev. 0, "Extension of Reactor Coolant Pump Motor Flywheel Examination," for approval (Ref. 1). On December 3, 2001, the NEI Technical Specification Task Force submitted TSTF-421, Rev. 0, which provided proposed changes to Specification 5.5.7, "Reactor Coolant Pump Flywheel Inspection Program," ofNUREG-143 1, Revision 2.
In a-January 30, 2003 meeting between the NRC and the NEI-Technical Specification Task Force, the NRC indicated that the review of TSTF-421 was suspended based on Reference 3. The WOG requests that the NRC complete the review of TSTF-421 (TAC No. MB 3544) on a schedule consistent with the completion of the NRC review of Reference 1 (TAC No. MB 2819) so that when WCAP-15666 is approved, licensee's can reference TSTF-421 in conjunction with WCAP-15666 to extend the interval for the RCP motor flywheel examination from 10 years to 20 years. Consistent with the practices identified in Office of Nuclear Reactor Regulation, Office Instruction LIC-500, "Processing Request for Reviews of Topical Reports," the WOG requests that the NRC provide an estimate of the review hours and the target date for completion of the Safety Evaluation for this TSTF.
WOG-03-144
- '* (4'-
WOG-03-144 March 12, 2003 Invoices associated with the review of this TSTF should be addressed to:
Mr. Gordon Bischoff, Project Manager Westinghouse Owners Group Westinghouse Electric Company (Mail Stop ECE 5-16)
P. O. Box 355 Pittsburgh, PA 15230-0355 If you require further information, feel free to contact Mr. Ken Vavrek, Westinghouse Owners Group Project Office at 412-374-4302.
Very truly yours, Robert H. Bryan, Chairman Westinghouse Owners Group cc:
Management Committee WOG Steering Committee WOG Licensing Subcommittee Representatives G. C. Bischoff, Westinghouse OG PMO-Program Managers, Westinghouse G. Shukla, USNRC (OWFN 7 El) (via Federal Express)
W. D. Beckner, USNRC (OWEN 12 114)
R. L. Dennig, USNRC (OWFN 12 114)
W. H. Ruland, USNRC (OWFN 7 El)
W. D. Reckley, USNRC (OWFN 7 Dl)
J. D. Andrachek, Westinghouse H. A. Sepp, Westinghouse K.R. Balkey, Westinghouse B.A. Bishop, Westinghouse P.L. Strauch, Westinghouse WOG-03-144