Inspection/Activity Plan for 03/01/2003 - 03/30/2004
ML030660097
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/03/2003
From: Joel Munday
NRC/RGN-II/DRP/RPB3
To: Young D
Florida Power Corp
Shared Package
ML030660066 List:
References
Download: ML030660097 (3)


Text

Crystal River Inspection / Activity Plan 03/01/2003 - 03/30/2004 Inspection Type Planned Dates Start End Title Inspection Activity No. of Staff on Site Unit Number Page 1 of 3 02/20/2003 14:47:31 Report 22 2

EB1SSDPC - SSDPC PRE-INSPECTION VISIT 03/31/2003 04/04/2003 Baseline Inspections Safety System Design and Performance Capability IP 7111121 3

Comments:

1 OL EP

- EP INSPECTION 04/14/2003 04/18/2003 Baseline Inspections Alert and Notification System Testing IP 7111402 3

04/14/2003 04/18/2003 Baseline Inspections Emergency Response Organization Augmentation Testing IP 7111403 3

04/14/2003 04/18/2003 Baseline Inspections Emergency Action Level and Emergency Plan Changes IP 7111404 3

04/14/2003 04/18/2003 Baseline Inspections Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 3

04/14/2003 04/18/2003 Baseline Inspections Performance Indicator Verification IP 71151 3

Comments:

3 PS-SEC

- SECURITY - TI/ICM 04/15/2003 04/18/2003 Safety Issues Inspection of Nuclear Reactor Safeguards - Interim Compensatory Measures IP 2515/148 3

Comments:

6 EB1SSDPC - SAFETY SYS DESIGN & PERFORMANCE CAPABILI 05/05/2003 05/09/2003 Baseline Inspections Safety System Design and Performance Capability IP 7111121 3

05/19/2003 05/23/2003 Baseline Inspections Safety System Design and Performance Capability IP 7111121 3

Comments:

3 OL PREP

- INITIAL EXAM PREP 08/04/2003 08/08/2003 Not Applicable CRYSTAL RIVER/EXAMS AT POWER FACILITIES V23186 3

Comments:

3 OL EXAM

- INITIAL EXAM 08/25/2003 08/29/2003 Not Applicable CRYSTAL RIVER/EXAMS AT POWER FACILITIES V23186 3

Comments:

3 PS-RP

- RADIATION PROTECTION 10/06/2003 10/10/2003 Baseline Inspections Access Control to Radiologically Significant Areas IP 7112101 3

10/06/2003 10/10/2003 Baseline Inspections ALARA Planning and Controls IP 7112102 3

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Crystal River Inspection / Activity Plan 03/01/2003 - 03/30/2004 Inspection Type Planned Dates Start End Title Inspection Activity No. of Staff on Site Unit Number Page 2 of 3 02/20/2003 14:47:31 Report 22 3

PS-RP

- RADIATION PROTECTION 10/06/2003 10/10/2003 Baseline Inspections Radioactive Material Processing and Transportation IP 7112202 3

10/06/2003 10/10/2003 Baseline Inspections Performance Indicator Verification IP 71151 3

Comments:

1 EB2-ISI

- INSERVICE INSPECTION-U3 10/13/2003 10/17/2003 Baseline Inspections Inservice Inspection Activities - PWR IP 7111108P 3

Comments:

1 EB2

- REACTOR HEAD REPLACEMENT 10/14/2003 10/17/2003 Event Response Insp Special Inspection IP 93812 3

Comments:

2 PS-RP

- RADIATION PROTECTION 10/20/2003 10/24/2003 Baseline Inspections Access Control to Radiologically Significant Areas IP 7112101 3

10/20/2003 10/24/2003 Baseline Inspections ALARA Planning and Controls IP 7112102 3

10/20/2003 10/24/2003 Baseline Inspections Radioactive Material Processing and Transportation IP 7112202 3

10/20/2003 10/24/2003 Baseline Inspections Performance Indicator Verification IP 71151 3

Comments:

1 S/G-ISI

- S/G INSERVICE INSPECTION-U3 10/21/2003 10/23/2003 Baseline Inspections Inservice Inspection Activities - PWR IP 7111108P 3

Comments:

2 OL RQ

- REQUAL INSPECTION 11/10/2003 11/14/2003 Baseline Inspections Licensed Operator Requalification IP 7111111B 3

Comments:

5 EB2-MODS - MODIFICATIONS/10CFR50.59 12/15/2003 12/19/2003 Baseline Inspections Evaluation of Changes, Tests, or Experiments IP 7111102 3

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Crystal River Inspection / Activity Plan 03/01/2003 - 03/30/2004 Inspection Type Planned Dates Start End Title Inspection Activity No. of Staff on Site Unit Number Page 3 of 3 02/20/2003 14:47:31 Report 22 5

EB2-MODS - MODIFICATIONS/10CFR50.59 12/15/2003 12/19/2003 Baseline Inspections Permanent Plant Modifications IP 7111117B 3

Comments:

1 EB2-HS

- HEAT SINK 03/01/2004 03/05/2004 Baseline Inspections Heat Sink Performance IP 7111107B 3

Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.