Harris Inspection / Activity Plan 03/01/2003 - 03/31/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/04/2003 11:14:27 Report 22 2
- EMERGENCY EXERCISE Baseline Inspections 03/03/2003 03/07/2003 Exercise Evaluation IP 7111401 1
Baseline Inspections 03/03/2003 03/07/2003 Emergency Action Level and Emergency Plan Changes IP 7111404 1
Baseline Inspections 03/03/2003 03/07/2003 Performance Indicator Verification IP 71151 1
3 PS-SEC
- SECURITY - TI/ICM Safety Issues 04/07/2003 04/11/2003 Inspection of Nuclear Reactor Safeguards - Interim Compensatory Measures IP 2515/148 1
2 EB2-HS
- HEAT SINK Baseline Inspections 04/14/2003 04/18/2003 Heat Sink Performance IP 7111107B 1
3 PS-RP
- RADIATION PROTECTION Baseline Inspections 04/28/2003 05/02/2003 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 04/28/2003 05/02/2003 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 04/28/2003 05/02/2003 Radioactive Material Processing and Transportation IP 7112202 1
Baseline Inspections 04/28/2003 05/02/2003 Performance Indicator Verification IP 71151 1
1 2515/150
- 2515/150 REV1 Safety Issues 05/05/2003 05/09/2003 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-02)
1 EB2-ISI
- INSERVICE INSPECTION-U1 Baseline Inspections 05/12/2003 05/16/2003 Inservice Inspection Activities - PWR IP 7111108P 1
2 PS-RP
- RADIATION PROTECTION Baseline Inspections 05/12/2003 05/16/2003 Access Control to Radiologically Significant Areas IP 7112101 1
Baseline Inspections 05/12/2003 05/16/2003 ALARA Planning and Controls IP 7112102 1
Baseline Inspections 05/12/2003 05/16/2003 Radioactive Material Processing and Transportation IP 7112202 1
Baseline Inspections 05/12/2003 05/16/2003 Performance Indicator Verification IP 71151 1
- REQUAL SIMULATOR INSPECTION Baseline Inspections 06/09/2003 06/12/2003 Licensed Operator Requalification IP 7111111B 1
3 PI&R
- PROBLEM IDENTIFICATION & RESOLUTION Baseline Inspections 07/07/2003 07/11/2003 Identification and Resolution of Problems IP 71152B 1
Baseline Inspections 07/21/2003 07/25/2003 Identification and Resolution of Problems IP 71152B 1
2 OL PREP
- INITIAL EXAM PREP Not Applicable 02/02/2004 02/06/2004 HARRIS/EXAMS AT POWER FACILITIES V23211 1
2 OL EXAM
- INITIAL EXAM Not Applicable 02/16/2004 02/27/2004 HARRIS/EXAMS AT POWER FACILITIES V23211 1
2 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 03/01/2004 03/05/2004 Safety System Design and Performance Capability IP 7111121 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Harris Inspection / Activity Plan 03/01/2003 - 03/31/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/04/2003 11:14:27 Report 22 5
EB1SSDPC - SAFETY SYS DESIGN & PERFORMANCE CAPABILI Baseline Inspections 03/22/2004 03/26/2004 Safety System Design and Performance Capability IP 7111121 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.