ML030550127

From kanterella
Jump to navigation Jump to search
January 2003 Monthly Operating Report for Seabrook
ML030550127
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 02/05/2003
From: St.Pierre G
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NYN-03012
Download: ML030550127 (3)


Text

FPL Energy Seabrook Station FPL Energy Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 February 5, 2003 Docket No. 50-443 NYN-03012 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station January 2003 Monthly Operating Report Enclosed please find Monthly Operating Report 03-01. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of January, 2003 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.

Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Manager - Reactor Engineering, at (603) 773-7776.

Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Station Director cc:

H. J. Miller, NRC Region I Administrator R. D. Starkey, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector

/7

i

C.-

OPERATING STATUS

1.

Unit Name:

Seabrook Station Unit 1

2.

Reporting Period:

JANUARY 2003

3.

Licensed Thermal Power (MWt):

3411.0

4.

Design Electrical Rating (Net MWe):

1148.0

5.

Maximum Dependable Capacity (Net MWe):

1155.3

6.

If Changes Occur in Capacity Ratings (Items Number 3 through 5)

Not Applicable Since Last Report, Give Reasons:

This Month Yr-to-Date Cumulative

7.

Number of Hours Reactor Was Critical 744.0 744.0 95378.6

8.

Hours Generator On-Line 744.0 744.0 92536.4

9.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

10.

Net Electrical Energy Generated (MWH) 860992 860992 104039895 I of 2 OPERATING DATA REPORT DOCKET NO 50-443 UNIT Seabrook I DATE February 1, 2003 COMPLETED BY J. L Dalton TELEPHONE (603) 773-7025 OPERATING

SUMMARY

The unit operated at 100% Rated Thermal Power (RTP) for the entire month. This yielded an availability factor of 100% and a capacity factor of 100.17% based on the MDC value of 1155.3 Net MWe.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-443 UNIT Seabrook I DATE February 1,2003 COMPLETED BY J. L. Dalton TELEPHONE (603) 773-7025 MONTH' JANUARY 2003 2 of 2 NO.

DATE TYPE' DURATION REASON '

METHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS (HOURS)

DOWN REACTOR 3 COMMENTS No entries for this month.

_ _ _ I I__

L_

2 3

F:

Forced Reason:

Method S"

Scheduled A - Equipment Failure (Explain)

I - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D - Regulatory Restriction 4 - Continued from previous month E - Operator Training / License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)