Exelkm.
Exelon Generation Company, LLC www exeloncorp com Nuclear LaSalle County Station 2601 North 21" Road Marseilles, I L 61341-9757 February 11, 2003 United States Nuclear Regulatory Commission Attention-Document Control Desk Washington, D.C. 20555 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374
Subject:
Monthly Operating Report for January 2003 Enclosed is the Exelon Generation Company (EGC), LLC, Monthly Operating Report for LaSalle County Station covering the period from January 1 through January 31, 2003. This report is submitted in accordance with Technical Specification 5.6.4.
Should you have any questions concerning this letter, please contact Mr. Glen T. Kaegi, Regulatory Assurance Manager, at (815) 415-2800.
Respectfully, Glen T. Kaegi Regulatory Assurance Manager LaSalle County Station Enclosure cc.
Regional Administrator - NRC Region III NRC Senior Resident Inspector - LaSalle County Station 7'
LASALLE COUNTY STATION UNIT-1 AND UNIT 2 MONTHLY PERFORMANCE REPORT EXELON GENERATION COMPANY NRC DOCKET NO. 50-373 NRC DOCKET NO. 50-374 LICENSE NO. NPF-1 1 LICENSE NO. NPF-18
TABLE OF CONTENTS Monthly Report for LaSalle Unit One A.
Operating Data Summary B.
Unit Shutdowns and Operating Summary C.
Unique Reporting Requirements II.
Monthly Report for LaSalle Unit Two A.
Operating Data Summary B.
Unit Shutdowns and Operating Summary C.
Unique Reporting Requirements
I.
Monthly Report for LaSalle County Station Unit One-January 2003 A.
OPERATING DATA
SUMMARY
FOR UNIT ONE DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-373 LaSalle One February 6, 2003 S. Du Pont (815) 415-2197
- 1.
Reporting Period: January 2003 Gross Hours: 744
- 2.
Currently Authorized Power Level. 3489 (MWt)
Design Electrical Rating: 1154 (MWe-net)
Max Dependable Capacity: 1111 (MWe-net)
- 3.
Power Level To Which Restricted (If Any): None
- 4.
Reasons For Restriction (If Any): N/A THIS MONTH YEAR-TO-DATE CUMULATIVE
- 5.
Reactor Critical Hours 744.0 744.0 116389.2
- 6.
Reactor Reserve 0.0 0.0 1641.2 Shutdown Hours
- 7.
Hours Generator 744.0 744.0 114160.9 On-Line 8
Unit Reserve 0.0 0.0 1.0 Shutdown Hours
- 9.
Gross Thermal 2466192.0 2466192.0 352272363.6 Energy (MWHt)
- 10.
Gross Electric Energy 846026.0 846026.0 118295058.0 (MWHe)
- 11.
Net Electrical Energy 830492.0 830492.0 114373653.0 (MWHe)
- 12.
Reactor Service 100.0 100.0 69.6 Factor (%)
- 13.
Reactor Availability 100.0 100.0 70.5 Factor (%)
- 14.
Unit Service Factor 100.0 100.0 68.2
(%)__
- 15.
Unit Availability 100.0 100.0 68.2 Factor 16 Unit Capacity Factor 100.5 100.5 63.8 (MDC)
- 17.
Unit Capacity Factor 96.7 967 61.4 (design MWe)
- 18.
Unit Forced Outage 0.0 0.0 10.5 Factor (%)
1
- 19.
Shutdowns Scheduled Over Next 6 Months: None.
20 If Shutdown at End of Report Period, Date of Startup: N/A
B.
UNIT SHUTDOWNS AND OPERATING
SUMMARY
REPORT MONTH JANUARY 2003 NO DATE TYPE (1)
DURATION REASON (2)
METHOD OF CORRECTIVE (HOURS)*
SHUTTING ACTIONS/
DOWN COMMENTS REACTOR (3)
None Year-to-date forced outage hours = 0.0 Cumulative forced outage hours = 13336.6 TABLE KEY:
(1)
F: Forced S: Scheduled (2)
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C Refueling D Regulatory Restriction E Operator / Licensing Exam F Administrative G Operational Error (Explain)
H Other (Explain)
(3)
Method:
- 1. Manual
- 2. Manual Scram
- 3. Automatic Scram
- 4. Continuation
- 5. Other (Explain)
SUMMARY
LaSalle Unit 1 operated at full power for the month of January 2003, with the exception of the following
"* January 2 (2200) - Power was reduced to 663 MWe to perform power suppression testing. The unit was returned to full power at 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> on January 7. The total duration of the power reduction was 98 hours0.00113 days <br />0.0272 hours <br />1.62037e-4 weeks <br />3.7289e-5 months <br />
"* January 19 (0004) - Power was reduced to 835 MWe to perform control rod drive scram time testing and control rod pattern change The unit was returned to full power at 0225 hours0.0026 days <br />0.0625 hours <br />3.720238e-4 weeks <br />8.56125e-5 months <br /> on January 20. The total duration of the power reduction was 26 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br /> and 21 minutes.
C UNIQUE REPORTING REQUIREMENTS FOR UNIT ONE
- 1.
Challenges other than routine surveillance testing to Safety/Relief Valve Operations-None 2
Major Changes to Radioactive Waste Treatment System-None
II.
Monthly Report for LaSalle County Station Unit Two-January 2003 A.
OPERATING DATA
SUMMARY
FOR UNIT TWO DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-374 LaSalle Two February 6, 2003 S. Du Pont (815) 415-2197
- 1.
Reporting Period: January 2003 Gross Hours: 744
- 2.
Currently Authorized Power Level: 3489 (MWt)
Design Electrical Rating: 1154 (MWe-net)
Max Dependable Capacity: 1111 (MWe-net)
- 3.
Power Level To Which Restricted (If Any): None
- 4.
Reasons For Restriction (If Any): N/A THIS MONTH YEAR-TO-DATE CUMULATIVE
- 5.
Reactor Critical Hours 426.7 426.7 108463.3
- 6.
Reactor Reserve 0.0 0.0 1716.9 Shutdown Hours
- 7.
Hours Generator On-392.0 392.0 107421.4 Line 8
Unit Reserve 0.0 0.0 0.0 Shutdown Hours
- 9.
Gross Thermal 1187887.9 1187887.9 335845742.8 Energy (MWHt) 10 Gross Electric Energy 404651.0 404651.0 112972913.0 (MWHe)
- 11.
Net Electrical Energy 390547.0 390547.0 1087159880 (MWHe) 12 Reactor Service 57.4 57.4 67.7 Factor (%)
13 Reactor Availability 57.4 57.4 68.7 Factor (%)
- 14.
Unit Service Factor 52.7 52.7 67.0
_ _ (%)__
15 Unit Availability 52.7 52.7 67.0 Factor 16 Unit Capacity Factor 47.2 47.2 63.7 (MDC)
- 17.
Unit Capacity Factor 45.5 45.5 61.3 (design MWe)
- 18.
Unit Forced Outage 18.3 18.3 15.3 Factor (%)
- 19.
Shutdowns Scheduled Over Next 6 Months: Refuel outage L2R09 started January 21, 2003.
- 20.
If Shutdown at End of Report Period, Date of Startup: N/A
B.
UNIT SHUTDOWNS AND OPERATING
SUMMARY
REPORT MONTH JANUARY 2003 Year-to-date forced outage hours = 88.0 Cumulative forced outage hours = 19330.2 TABLE KEY:
(1)
F: Forced S: Scheduled (2)
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C Refueling D Regulatory Restriction E Operator/ Licensing Exam F Administrative G Operational Error (Explain)
H Other (Explain)
(3)
Method:
- 1. Manual
- 2. Manual Scram
- 3. Automatic Scram
- 4. Continuation
- 5. Other (Explain)
NO DATE TYPE DURATION REASON (2)
METHOD CORRECTIVE (1)
(HOURS)*
OF ACTIONS/
SHUTTING COMMENTS DOWN REACTOR (3)
L2F36 01/10/03 F
88.0 A (trip of the 2B 2
Condensate pump Condensate motor was repaired Pump on and the unit was instantaneous returned to service on overcurrent)
January 14, 2003 L2R09 01/21/03 S
264.0 C
1 Scheduled refueling outage. Unit expected to be returned to full power February 16, 2003.
SUMMARY
LaSalle Unit 2 continued coastdown (decreasing MWe output) throughout January until shutdown for refueling outage L2R09 on January 20, 2003, with the exception of the following:
January 10 (1156) - Manual scram due to low reactor water level caused by loss of 2A and 2C heater drain pumps, 2B condensate/condensate booster pump (CD/CB Pump), and 2A and 2C turbine driven reactor feedwater pumps due to the trip of the 2B CD/CB Pump on instantaneous overcurrent. The unit was returned to service at 0356 hours0.00412 days <br />0.0989 hours <br />5.886243e-4 weeks <br />1.35458e-4 months <br /> on January 14.
The duration of the shutdown was 88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br />.
"* January 21 (0001) - Shutdown for scheduled refueling outage. Unit is expected to be returned to full power on February 16, 2003. The duration of the scheduled shutdown for the January reporting period was 264 hours0.00306 days <br />0.0733 hours <br />4.365079e-4 weeks <br />1.00452e-4 months <br />.
C.
UNIQUE REPORTING REQUIREMENTS FOR UNIT TWO
- 1.
Challenges other than routine surveillance testing to Safety/Relief Valve Operations-None
- 2.
Major Changes to Radioactive Waste Treatment Systems-None