ML030060342
| ML030060342 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 01/02/2003 |
| From: | NRC/NRR/DLPM/LPD1 |
| To: | |
| References | |
| TAC MB5507, TAC MB5508 | |
| Download: ML030060342 (2) | |
Text
A22 A B
C 1400 1300 1200 1100 o1000 w
S-900 0
-j w U) 800 U) w CL U
o 700 600 Z
S500 w
400 w
C,,
300 200 100 0
0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 MINIMUM REACTOR VESSEL METAL TEMPERATURE (F)
MINIMUM REACTOR VESSEL METAL TEMPERATURE VS.
REACTOR VESSEL PRESSURE FIGURE 3.4.6.1-1 Amendment No. -36, 4-06, 5,--5-5,163 A, B, C - CORE BELTLINE AFTER ASSUMED 69°F SHIFT FROM AN INITIAL PLATE RTNoT OF 20°F A - SYSTEM HYDROTEST WITH FUEL IN THE VESSEL B - NON-NUCLEAR HEATUP/COOLDOWN LIMIT C - NUCLEAR (CORE CRITICAL)
LIMIT CURVES A, B, C ARE VALID UP TO 32 EFPY OF OPERATION
,CURVE A22 IS VALID UP TO 122 EFPY OF OPERATION 3/4 4-20 LIMERICK - UNIT 1
A2 2 A B
C
~____iLI___
7//I!
I 1400 1300 1200 1100 CL 1000 0
900 0
w un 800 in w
a:
o 700 r
600 Z
S500 cn 400 in w 300 0
25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 MINIMUM REACTOR VESSEL METAL TEMPERATURE (OF)
MINIMUM REACTOR VESSEL METAL TEMPERATURE VS.
REACTOR VESSEL PRESSURE FIGURE 3.4.6.1-1 Amendment No. -54, 80, 4414,125 A, B, C - CORE BELTLINE AFTER ASSUMED 820F SHIFT FROM AN INITIAL PLATE RTNDT OF 40°F A - SYSTEM HYDROTEST WITH FUEL IN THE VESSEL B - NON-NUCLEAR HEATUP/COOLDOWN LIMIT C - NUCLEAR (CORE CRITICAL)
LIMIT CURVES A, B, C ARE VALID UP TO 32 EFPY OF OPERATION CURVE A 2 2 IS VALID UP TO 22 EFPY OF OPERATION 200 100 0
3/4 4-20 LIMERICK - UNIT 2