Drawing SBO Figure 8 1-1, Simplified One Line Diagram of Substation/Sbo
ML023600246
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/19/2002
From:
Omaha Public Power District
To:
Office of Nuclear Reactor Regulation
References
Download: ML023600246 (1)


Text

LR-SBO LR-SBO LR-SBO LR-SBO LR-SBO LR-4.16 LR-SBO LR-4.16 LR-SBO LR-4.16 LR-SBO LR-4.16 LR-SBO LR-4.16 LR-SBO

  • UNLESS OTHERWISE INDICATED, VENTS, DRAINS AND TEST CONNECTIONS THAT ARE WITHIN LICENSE RENEWAL BOUNDARIES ARE INCLUDED IN LR SCOPE TO THE DISCHARGE OF THE VALVE.
  • ALL INSTRUMENTATION LINES NORMALLY OPEN TO THE PROCESS SYSTEM, THROUGH AND INCLUDING THE INSTRUMENT, ARE INCLUDED IN LR SCOPE.
  • IN GENERAL, LR FLAGS ARE NOT SHOWN FOR VENTS, DRAINS, TEST CONNECTIONS OR INSTRUMENT LINES EXCEPT FOR CONTAINMENT PENETRATIONS.
  • THE LICENSE RENEWAL BOUNDARY INCLUDES THE PIPING AND SUPPORTS UP TO THE FIRST SEISMIC SUPPORT PAST THE BLUE BOUNDARY FLAG.

NOTE: THIS PRINT IS TO BE USED FOR THE FCS LICENSE RENEWAL PROJECT ONLY.

IT MAY NOT REFLECT THE MOST CURRENT REVISION OF THIS DRAWING.

FOR INFORMATION ONLY SIMPLIFIED ONE LINE DIAGRAM OF SUBSTATION/SBO SBO12234, Fig 8.1-1 (Simplified)