ML023090393
| ML023090393 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 09/13/2002 |
| From: | Ernstes M Division Reactor Projects III |
| To: | Byrne S South Carolina Electric & Gas Co |
| References | |
| 50-395/02-301, ES-301, ES-301-1 50-395/02-301 | |
| Download: ML023090393 (138) | |
See also: IR 05000395/2002301
Text
Administrative Topics Outline
Form ES-301-1 (R8, S1)
Facility: ___Summer________________
Date of Examination: __9/9-13/02___
Examination Level (circle one): RO / SRO
Operating Test Number: ___1_____
Administrative
Topic/Subject
Description
Describe method of evaluation:
2. TWO Administrative Questions
Review of License Operator Status Report to determine
current active licenses. (Shift Turnover)
Conduct of
Operations
Determine adequate shift manning
A.1
Conduct of
Operations
Evaluation of Surveillance Test results
A.2
Equipment
Control
Determine personnel exposure limit for non-essential personnel
A.3
Radiation
Control
Classify an Emergency Plan Event
A.4
V.C. SUMMER NUCLEAR STATION
Admin A.1.a
REVIEW OF LICENSED OPERATOR STATUS REPORT TO
DETERMINE CURRENT ACTIVE LICENSES
APPROVAL:
APPROVAL DATE:
REV NO:
0
CANDIDATE
EXAMINER:
SRO ONLY
THIS JPM IS APPROVED
TASK:
341-001-03-03
CONDUCT SHIFT AND RELIEF TURNOVER
TASK STANDARD:
Determine that not all the oncoming licensed operators have current active licenses.
PREFERRED EVALUATION LOCATION
PREFERRED EVALUATION METHOD
CLASSROOM
PERFORM
REFERENCES:
TOOLS:
SAP-200, Conduct of Operations, Attachment I
Watchstanding Authorization Report, (License Operators Status
Report)
C Shift September Schedule
EVALUATION TIME
10
TIME CRITICAL
NO
10CFR55:
41b10
CANDIDATE:
TIME START:
TIME FINISH:
PERFORMANCE RATING:
SAT:
UNSAT:
QUESTION GRADE:
PERFORMANCE
EXAMINER:
SIGNATURE
DATE
COMMENTS:
OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS: None
READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING
CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED
AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I
WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE
INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB
PERFORMANCE MEASURE WILL BE SATISFIED.
INITIAL CONDITION:
Normal plant operations
Shift turnover is being conducted
INITIATING CUES:
As the oncoming Shift Supervisor, perform step 2.c of Attachment 1, of
SAP-200, Conduct of Operations.
HAND THIS PAPER BACK TO YOUR
EVALUATOR WHEN YOU FEEL THAT YOU
HAVE SATISFACTORILY COMPLETED THE
ASSIGNED TASK.
STEPS
CR
SEQ
STEP:
1
STEP STANDARD:
Yes Yes
Perform SAP-200, Attachment I, Step 2.c.
Review the Licensed Operator Status
Report and determine that not all oncoming
licensed operators have current licenses.
G. Ervin has called in sick, and the only
available replacement licensed operators
on-shift are B. Stroup (ABLL) and Bill
Davis (rover), both of whom failed the
most recent requalification exam and are
currently inactive. Examinee should
determine that a callout is required for G.
Ervin.
CUES:
UNSAT
COMMENTS:
Examiner ends JPM at this point.
JPM QUESTIONS
JPM NO:
Admin A.1.a
DESCRIPTION:
REVIEW OF LICENSED OPERATOR STATUS REPORT TO DETERMINE CURRENT
ACTIVE LICENSES
IC SET:
INSTRUCTIONS:
COMMENTS:
V.C. SUMMER NUCLEAR STATION
Admin A.1.b
DETERMINE ADEQUATE SHIFT MANNING
APPROVAL:
APPROVAL DATE:
REV NO:
0
CANDIDATE
EXAMINER:
SRO ONLY
THIS JPM IS APPROVED
TASK:
TASK STANDARD:
Complete review of the FEP manning sheet and identify that additional staffing is needed.
PREFERRED EVALUATION LOCATION
PREFERRED EVALUATION METHOD
CLASSROOM
PERFORM
REFERENCES:
TOOLS:
SAP-200, Conduct of Operations, Attachment I
C Shift September Schedule
- FEP Manning Sheet
OPS Training Matrix
EVALUATION TIME
10
TIME CRITICAL
NO
10CFR55:
41b10
CANDIDATE:
TIME START:
TIME FINISH:
PERFORMANCE RATING:
SAT:
UNSAT:
QUESTION GRADE:
PERFORMANCE
EXAMINER:
SIGNATURE
DATE
COMMENTS
OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS: None
READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING
CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED
AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I
WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE
INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB
PERFORMANCE MEASURE WILL BE SATISFIED.
INITIAL CONDITION:
Normal plant operations
Shift turnover is being conducted
The Shift Test Specialist presents the FEP manning sheet to the Shift
Supervisor and requests assistance determining if staffing is adequate.
INITIATING CUES:
As the oncoming Shift Supervisor, review the FEP manning sheet as
required by SAP-200.
HAND THIS PAPER BACK TO YOUR
EVALUATOR WHEN YOU FEEL THAT YOU
HAVE SATISFACTORILY COMPLETED THE
ASSIGNED TASK.
STEPS
CR
SEQ
STEP:
1
STEP STANDARD:
Yes No
Review the FEP Manning Sheet to determine
Review FEP Manning Sheet and determine
shift manning.
that additional staffing is needed. The
student must determine that the only
available option would be to move the
rover (Bill Davis) to the B NRO (CB
Operator watch) Bill Davis or B. Boyd can be used to
provide a qualified fire brigade leader.
CUES:
UNSAT
COMMENTS:
Examiner ends JPM at this point.
JPM QUESTIONS
JPM NO: Admin A.1.b
DESCRIPTION:
DETERMINE ADEQUATE SHIFT MANNING
IC SET:
INSTRUCTIONS:
COMMENTS:
V.C. SUMMER NUCLEAR STATION
Admin A.2
EVALUATION OF SURVEILLANCE TEST RESULTS
APPROVAL:
APPROVAL DATE:
REV NO:
0
CANDIDATE
EXAMINER:
SRO ONLY
THIS JPM IS APPROVED
TASK:
342-026-03-02
REVIEW RESULTS OF SURVEILLANCE TESTS
TASK STANDARD:
Correctly determine that STP 205.004 does not pass the acceptance criteria.
PREFERRED EVALUATION LOCATION
PREFERRED EVALUATION METHOD
CLASSROOM
SIMULATE
REFERENCES:
TOOLS:
STP 205.004 and attached data sheets.
- STTS
EVALUATION TIME
15
TIME CRITICAL
NO
10CFR55:
41b8
CANDIDATE:
TIME START:
TIME FINISH:
PERFORMANCE RATING:
SAT:
UNSAT:
QUESTION GRADE:
PERFORMANCE
EXAMINER:
SIGNATURE
DATE
COMMENTS:
OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS: None
READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING
CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED
AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I
WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE
INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB
PERFORMANCE MEASURE WILL BE SATISFIED.
INITIAL CONDITION:
TS required surveillance has been completed on "B" RHR pump.
INITIATING CUES:
You are the Control Room Supervisor and STP 205.004, RHR PUMP AND
VALVE OPERABILITY TEST, has been completed and given to you for
review. Determine if STP 205.004 meets the acceptance criteria..
HAND THIS PAPER BACK TO YOUR
EVALUATOR WHEN YOU FEEL THAT YOU
HAVE SATISFACTORILY COMPLETED THE
ASSIGNED TASK.
STEPS
CR
SEQ
STEP:
1
STEP STANDARD:
Yes Yes
Review STP-205.004 Test Data.
Determine that the Test Data does not
meet the acceptance criteria of
STP-205.004. Stroke time for MVG 8809B
exceeds maximum allowed stroke time,
which requires the valve to be declared
inoperable per the acceptance criteria of
STP 205.004. Return as forund valve
lineup has MVG 8706B restored to the
incorrect position.
The applicant recognize that the
Surveillance Test Task Sheet STTS No.
(0211867) did not match the STTS No. on
the STP-205.004 data sheets (0211197).
CUES:
UNSAT
COMMENTS:
Examiner ends JPM at this point.
JPM QUESTIONS
JPM NO: Admin A.2
DESCRIPTION:
EVALUATION OF SURVEILLANCE TEST RESULTS
IC SET:
INSTRUCTIONS:
COMMENTS:
V.C. SUMMER NUCLEAR STATION
Admin A.3
DETERMINE PERSONNEL EXPOSURE LIMIT FOR
PERSONNEL
APPROVAL:
APPROVAL DATE:
REV NO:
CANDIDATE
EXAMINER:
SRO ONLY
THIS JPM IS APPROVED
TASK:
TASK STANDARD:
The examinee correctly determines the exposure limit (same limitations as if not in a SAE).
PREFERRED EVALUATION LOCATION
PREFERRED EVALUATION METHOD
CLASSROOM
PERFORM
REFERENCES:
TOOLS:
Personnel exposure record
HPP-153
- EPP 20
EPP 1.3
EVALUATION TIME
15
TIME CRITICAL
NO
10CFR55:
43b4
CANDIDATE:
TIME START:
TIME FINISH:
PERFORMANCE RATING:
SAT:
UNSAT:
QUESTION GRADE:
PERFORMANCE
EXAMINER:
SIGNATURE
DATE
COMMENTS:
OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS: None.
READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING
CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED
AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I
WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE
INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB
PERFORMANCE MEASURE WILL BE SATISFIED.
INITIAL CONDITION:
The site is in a SAE due to an inability to establish any feedwater flow to
any SG's (LOCA greater than charging pump capacity with bleed and
feed initiated) and the actions of EOP 15.0 are currently in progress. The
OSC is in the process of being manned, but all building operators have not
been released to the OSC by the Shift Supervisor at this time. An
auxiliary operator from the operating shift is assisting with emergency
duties. He has worked at V.C. Summer for only 3 months and is interim
qualified IB. He previously worked at another nuclear plant for the first 6
months of the year (two quarters) and his exposure records have not
been obtained from his previous employer. HP has indicated that his NRC
Form 4 cannot be completed and verified until that information has been
obtained. His current exposure record at V.C. Summer is attached.
INITIATING CUES:
The OSC Supervisor has requested that the Shift Supervisor, as IED,
authorize a verbal extension for the new operator to the federal
exposure limit as a planned dose using the limit specified in EPP 20,
Attachment III for all activities. Given the plant is in a SAE and the
personnel exposure history of the operator, determine the exposure limit
for the operator and if an extension is permissible..
HAND THIS PAPER BACK TO YOUR
EVALUATOR WHEN YOU FEEL THAT YOU
HAVE SATISFACTORILY COMPLETED THE
ASSIGNED TASK.
STEPS
CR
SEQ
STEP:
1
STEP STANDARD:
No No
A. Determine if the normal Admin limits can be Step 3.2.1 of EPP-020 allows the IED/ED
Yes waived by EPP-020. to waive the normal administrative limits.
Yes No B. Determine limits for TEDE, TODE, LDE, SDE Correctly calculate exposure limit for
(WB), and SDE (ME). personnal. The examinee should
determine that the missing exposure
records for the first six months of the
year require a reduction in the annual
limits by 25% per quarter per HPP-153,
step 4.4. The examinee should also
determine that an extension is required
since the operator has already received
1000 mrem TEDE per HPP-153, step 4.7.
The limits are as follows per HPP-153:
TEDE (step 4.3.2) 4000 mrem per current
year x 50% = 2000 mrem - 1000 mrem
already received = 1000 mrem. TODE
(step 4.3.3) 40,000 mrem per current year
x 50% = 20,000 mrem - 200 mrem already
received = 19,800 mrem. LDE (step
4.3.4) 12,000 mrem per current year x
50% = 6,000 mrem - 0 mrem = 6,000
mrem. SDE, WB (step 4.3.5) 40,000 mrem
per current year x 50% = 20,000 mrem - 0
mrem = 20,000 mrem. SDE, ME (step
4.3.6) 40,000 mrem per current year x
50% = 20,000 mrem - 0 mrem = 20,000
mrem. An exposure extension cannot be
authorized per HPP-153, step 4.9, since
the current year occupational exposure is
not documented on an NRC Form 4 and
has not therefore been signed by the
effected individual to confirm the reported
values are correct.
Post Exam Note: This JPM was modified by the facility between NRC approval and the JPM administration. The
modification was not discussed with the NRC until just before it was to be administered. This change resulted in the
need to revise the critical step and expected action and eliminate the requirement to calculate any limits. The final
expected action follows:
Identify that Health Physics Procedure HPP-153, Administrative Exposure Limits, is superceded by Emergency Plan
Procedure EPP-020, Emergency Personnel Exposure Control, in an emergency. Correctly determine that a verbal
extension to an individuals administrative exposure limits can be suspended or modified verbally by the IED, Interim
Emergency Director, per Section 3.2 of EPP-020.
UNSAT
Approved cue
The student may not calculate the exposure limit based on the fact that an
extension is not permissible per HPP-153. If the examinee correctly determines that
no extension can be granted, Ask them to determine the maximum exposure limit that
could be requested for the operators extension when the request was made per HPP-153.
Modified cue the day of the exam
The student may not calculate the exposure limit based on the fact that an extension is not permissible per
HPP-153. If the examinee correctly determines that no extension can be granted, ask them to determine the
maximum exposure that could be received by the operator based on exposure histrory (ie remaining exposure).
The student may also correctly determine that the normal admin limits may be waived by the IED per step 3.2.1
of EPP-020. If the student makes this determination, point out that step 4.2.2 requires a return to normal
exposure control per HPP-153 when conditions allow, and that conditions are such that these limits should be
utilized.
COMMENTS:
Examiner ends JPM at this point.
JPM QUESTIONS
REFERENCE ALLOWED
QUESTION
ANSWER
CANDIDATE'S RESPONSE:
TIME:
REFERENCES:
JPM NO: Admin A.3
DESCRIPTION:
DETERMINE PERSONNEL EXPOSURE LIMIT FOR PERSONNEL
IC SET:
INSTRUCTIONS:
COMMENTS:
V.C. SUMMER NUCLEAR STATION
Admin A.4
CLASSIFY EMERGENCY PLAN EVENT
APPROVAL:
APPROVAL DATE:
REV NO:
0
CANDIDATE
EXAMINER:
SRO ONLY
THIS JPM IS APPROVED
TASK:
344-019-03-02
CLASSIFY EMERGENCY EVENTS REQUIRING EMERGENCY PLAN
IMPLEMENTATION
TASK STANDARD:
Emergency classification evaluated as an ALERT based on one of the following;
281
ONGOING SEVERE SECURITY THREAT
292 MANMADE PHENOMENON
PREFERRED EVALUATION LOCATION
PREFERRED EVALUATION METHOD
SIMULATOR
PERFORM
REFERENCES:
TOOLS:
EPP-001
EVALUATION TIME
10
TIME CRITICAL
No
10CFR55:
45(a)11
CANDIDATE:
TIME START:
TIME FINISH:
PERFORMANCE RATING:
SAT:
UNSAT:
QUESTION GRADE:
PERFORMANCE
EXAMINER:
SIGNATURE
DATE
COMMENTS:
OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS: None
READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING
CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED
AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I
WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE
INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB
PERFORMANCE MEASURE WILL BE SATISFIED.
INITIAL CONDITION:
Severe weather warnings for the site.
The plant was at 100% power prior to the event.
An armed intrusion is in progress.
The RWST has been destroyed by an explosion.
INITIATING CUES:
Classify the event per EPP-001 and indicate the basis for the
classification.
HAND THIS PAPER BACK TO YOUR
EVALUATOR WHEN YOU FEEL THAT YOU
HAVE SATISFACTORILY COMPLETED THE
ASSIGNED TASK
STEPS
CR
SEQ
STEP:
1
STEP STANDARD:
Yes No
Evaluates plant conditions and classifies and
Determines ALERT Emergency Action
Provides the basis for each event PER EPP-001 Level based on 281 or AND 292.
281 - Alert, Security safeguards contingency event
which results in adversaries commandeering an area
of the plant, but not impacting shutdown capability.
292 - Alert, Known explosion at facility resulting in
major damage to plant structures or equipment. For
onsite explosion: Observation of damage by
explosion.
CUES:
UNSAT
COMMENTS:
Examiner ends JPM at this point.
JPM QUESTIONS
JPM NO: Admin A.4
DESCRIPTION:
CLASSIFY EMERGENCY PLAN EVENT
IC SET:
INSTRUCTIONS:
COMMENTS:
Control Room Systems
Form ES-301-2 (R8, S1)
and Facility Walk-Through Test Outline
System / JPM Title
Type Code*
Safety
Function
a. Transfer to Cold Leg Reciriculation JPS-5
DS
3
b. Loss of Intermediate Range Instrumentation JPS-029
LDS
7
c. Stuck Rod JPS-043
DS
1
d. Identify and isolate RCS leak to CCWS JPS-042
DS
8
e. Response to imminent pressurized thermal shock
JPS-93
NS
4P
f. Manually initiate Reactor Building Spray JPSF-019
5
g. Transfer in-service charging pump (NRC) JPSF-046
2
a. Locally start an Emergency D/G during a loss of offsite
power (with Failure of field to flash) JPPF-012
6
b. Control Room evacuation (duties of BOP operator)
(Modified JPPF-049)
M
8
c. Establish Demineralizer Water Alternate cooling to
Charging Pumps (Failure of Chilled Water Supply)
(New JPPF-NRC)
DAR
1
- Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol
room, (S)imulator, (L)ow-Power, (R)CA
V.C. SUMMER NUCLEAR STATION
JPM NO
JPS-005
TRANSFER TO COLD LEG RECIRCULATION
APPROVAL: DOW
APPROVAL DATE:
6/20/2002
REV NO:
9
CANDIDATE
EXAMINER:
THIS JPM IS APPROVED
TASK:
000-136-05-01
TRANSFER RHR FROM COLD LEG INJECTION TO COLD LEG RECIRCULATION
TASK STANDARD:
ECCS is shifted from Cold Leg Injection to Cold Leg Recirculation without losing suction to the RHR,
RB Spray, or Charging pumps or dead-heading a charging pump. Trains are split to remove
vulnerability to passive failure.Train "A" is aligned for Hot Leg Recirc.
PREFERRED EVALUATION LOCATION
PREFERRED EVALUATION METHOD
SIMULATOR
PERFORM
REFERENCES:
TOOLS:
EVALUATION TIME
20
TIME CRITICAL
NO
10CFR55:
45(a)7
CANDIDATE:
TIME START:
TIME FINISH:
PERFORMANCE RATING:
SAT:
UNSAT:
QUESTION GRADE:
PERFORMANCE
EXAMINER:
SIGNATURE
DATE
COMMENTS:
OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING
CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED
AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I
WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE
INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB
PERFORMANCE MEASURE WILL BE SATISFIED.
INITIAL CONDITION:
The plant has tripped and Safety Injected from 100% due to a DBA LOCA.
CCW was shifted to fast speed in the active loop in preparation for cold
leg recirculation. RWST level has decreased to 18% and containment
sump level has increased above 413'. "C" Charging pump was OOS prior
to the event. EOP-2.2 has been entered from EOP-2.0, LOSS OF
SECONDARY COOLANT.
INITIATING CUES:
RWST LO-LO-LVL-XFER TO SUMP annunciator is received at 18% RWST
level. CRS has directed the NROATC to transfer ECCS to Cold Leg
Recirculation and prepare for Hot Leg Recirculation per EOP-2.2 starting
at STEP 3.
HAND THIS PAPER BACK TO YOUR
EVALUATOR WHEN YOU FEEL THAT YOU
HAVE SATISFACTORILY COMPLETED THE
ASSIGNED TASK.
STEPS
CR
SEQ
STEP:
1
STEP STANDARD:
Yes Yes
Implement Attachment I, RHR/SPRAY
Implements Attachment I by depressing
SWAPOVER. Depress both RESET TRAIN
both RESET TRAIN A(B) RB SPRAY
A(B) RB SPRAY.
pushbuttons.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
2
STEP STANDARD:
No Yes
Verify annunciator XCP-612 3-2 (RB SPR
Verifies annunciator XCP-612 3-2 (RB
ACT) clears.
SPR ACT) clears.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
3
STEP STANDARD:
Yes Yes
Align RHR to the Sumps. (Closes RWST
Verifies MVG-8811A and 8812A, RHR
suction valves after verifying sump valves
SUMP A TO RHR PP A, indicates red light
open.
ON, green light OFF. MVG-8809A, RWST
TO RHR PP A indicates red light OFF,
green light ON. MVG-8811B and 8812B,
RHR SUMP B TO RHR PP B, indicates red
light ON, green light OFF. MVG-8809B,
RWST TO RHR PP B indicates red light
OFF, green light ON.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
4
STEP STANDARD:
Yes Yes
Align RB Spray to the Sumps. (Closes RWST
Verifies MVG-3004A and 3005A, SUMP
suction valves after verifying sump valves
ISOL LOOP A, indicates red light ON,
open.
green light OFF. MVG-3001A, RWST TO
SPRAY PUMP A SUCT indicates red light
OFF, green light ON. MVG-3004B and
3005B, SUMP ISOL LOOP B, indicates red
light ON, green light OFF. MVG-3001B,
RWST TO SPRAY PUMP SUCT, indicates
red light off, green light on.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
5
STEP STANDARD:
Yes Yes
Verify at least one train of RHR has been
Verifies RB SUMP TO RHR PUMP valves
MVG-8811A&B and MVG-8812A&B open.
MVG-8809A&B are closed.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
6
STEP STANDARD:
Yes Yes
Reset both SI Reset Train "A" and Train "B".
SI RESET TRAIN A&B switches
momentarily taken to the RESET position.
SI AUTO BLOCK light illuminates and SI
AUTO light goes to dim.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
7
STEP STANDARD:
Yes Yes
Align Charging Pumps for Cold Leg
Ensures both RHR Pumps A(B) are
Recirculation: Ensure both RHR Pumps A(B)
running by verifying red light on, green
are running.
light off, proper amps and flow indicated.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
8
STEP STANDARD:
Yes Yes
Close both MVG-8887A(B) RHR LP A(B) TO
MVG-8887A(B) both indicate red light off,
HOT LEGS
green light on.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
9
STEP STANDARD:
No Yes
Isolate the Charging Pump miniflow lines:
Turns Power lockout Train "A" to on then
Close MVG-8106, CHG PP.
places MVG-8106 switch to close.
Verifies red light off, green light on. Turn
Train "A" power lockout switch to off.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
10
STEP STANDARD:
No Yes
Close MVT-8109 A(B)(C), CHG PP A(B)(C).
Places MVT-8109 A(B)(C) to close.
Verifies red light off, green light on for
each valve.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
11
STEP STANDARD:
Yes Yes
Open MVG-8706A(B), RHR LP A(B) TO CHG
Places MVG-8706 A(B) switch to open.
PP.
Verifies red light on, green light off for
each valve.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
12
STEP STANDARD:
Yes Yes
Close LCV-115B(D), RWST TO CHG PP SUCT. Places LCV-115B(D) to close. Verifies red
light off, green light on for each valve.
CUES:
The examinee must wait until MVG-8706A (B) are full open before closing
UNSAT
LCV-115B (D).
COMMENTS:
CR
SEQ
STEP:
13
STEP STANDARD:
Yes No
Verify stable flow on FI-943, CHG LOOP B
Verifies flow is stable on FI-943, CHG
CLD/HOT LG FLOW GPM.
LOOP B CLD/HOT LG FLOW GPM.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
14
STEP STANDARD:
No No
Verify two charging pumps are running
CHG/SI PUMP A and B indicates red light
ON, green light OFF.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
15
STEP STANDARD:
No Yes
Check 'C' charging pump aligned to 'A' train.
CHG/SI PUMP C XFER SWITCH XET 2000C
on Train "A" light is lit.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
16
STEP STANDARD:
Yes Yes
Split charging pump suction & discharge lines.
MVG-8131A and (B), LP B SUCT TO CHG
PP C, indicates red light OFF, green light
ON. MVG-8885, CHG LP A ALT TO COLD
LEGS, indicates red light ON, green light
OFF. MVG-8133A and (B), CHG PP C TO
LP B DISCH, indicate red light OFF, green
light ON.
CUES:
To prevent dead-heading "A" Chg Pp (miniflows closed), 8885 must be opened
UNSAT
BEFORE closing 8133A or B. If not opened prior to, constitutes failure of this JPM.
COMMENTS:
CR
SEQ
STEP:
17
STEP STANDARD:
No No
Ensure both MVB-9503A(B) are open.
Verifies MVB-9503A(B) open by
observing red light on, green light off.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
18
STEP STANDARD:
No No
Complete alignment of RB Spray for
RESET PHASE A - TRAIN A(B) CNTMT
recirculation: Reset Containment Isolation.
ISOL and RESET PHASE B - TRAIN A(B)
CNTMT ISOL momentarily depressed.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
19
STEP STANDARD:
Yes No
Close MVG-3002A(B) NAOH TO SPRAY PUMP MVG-3002A(B) both indicate red light off,
A(B) SUCT
green light on
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
20
STEP STANDARD:
Yes No
Place both ESF LOADING SEQ A(B) RESETS
ESF LOADING SEQ A(B) RESETS
to: NON-ESF- LCKOUTS, AUTO-START
switches momentarily taken to the
BLOCKS.
NON-ESF LOCKOUT position and then to
the AUTO START BLOCKS position.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
21
STEP STANDARD:
Yes No
Establish Instrument Air to the RB.
Operator verifies/starts one Instrument Air
Compressor. PVA-2659, INST AIR TO RB
AIR SERV and PVT-2660, AIR SPLY TO
RB indicate red light ON, green light OFF.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
22
STEP STANDARD:
No No
Verify RHR Sump are NOT blocked.
Notes normal RHR pump amps and
discharge pressure.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
23
STEP STANDARD:
Yes No
Shift the CCW Train to fast speed in the Active
Verifies CCW Train "A" is running in fast
Loop.
speed.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
24
STEP STANDARD:
No No
Determine if transfer to Hot Leg Recirculation
Checks initial conditions and determines
will be required: Check if this procedure was
that this procedure was entered from
entered from EOP-2.0, LOSS OF SECONDARY EOP-2.0.
COOLANT.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
25
STEP STANDARD:
No Yes
Prepare for Hot Leg Recirculation: Ensure
MVG-8801A, HI HEAD TO COLD LEG INJ,
MVG-8801B, HI HEAD TO COLD LEG INJ. is
indicates red light OFF, green light ON.
open. Close MVG-8801A.
CUES:
UNSAT
COMMENTS:
Examiner ends JPM at this point.
JPM QUESTIONS
JPM NO: JPS-005
DESCRIPTION:
TRANSFER TO COLD LEG RECIRCULATION
IC SET:
INSTRUCTIONS:
COMMENTS:
V.C. SUMMER NUCLEAR STATION
JPM NO:
JPS-029
LOSS OF INTERMEDIATE RANGE INSTRUMENTATION
APPROVAL: DOW
APPROVAL DATE:
6/20/2002
REV NO:
4
CANDIDATE
EXAMINER:
THIS JPM IS APPROVED
TASK:
000-033-05-01
RESPOND TO INTERMEDIATE RANGE INSTRUMENTATION CHANNEL
FAILURE
TASK STANDARD:
Power level stable at approx 10-4% reactor power. Level trip switch for N35 is in BYPASS.
PREFERRED EVALUATION LOCATION
PREFERRED EVALUATION METHOD
SIMULATOR
PERFORM
REFERENCES:
TOOLS:
EVALUATION TIME
5
TIME CRITICAL
No
10CFR55:
45(a)4
CANDIDATE:
TIME START:
TIME FINISH:
PERFORMANCE RATING:
SAT:
UNSAT:
QUESTION GRADE:
PERFORMANCE
EXAMINER:
SIGNATURE
DATE
COMMENTS:
OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING
CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED
AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I
WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE
INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB
PERFORMANCE MEASURE WILL BE SATISFIED.
INITIAL CONDITION:
A Reactor Startup is in progress per GOP-3. Reactor power is approx
10E-5 CPS. P-6 has been blocked.
INITIATING CUES:
The CRS directs NROATC to respond to annunciator(s).
HAND THIS PAPER BACK TO YOUR
EVALUATOR WHEN YOU FEEL THAT YOU
HAVE SATISFACTORILY COMPLETED THE
ASSIGNED TASK.
STEPS
CR
SEQ
STEP:
1
STEP STANDARD:
Yes Yes
Stabilize reactor power at current power
NROATC drives control rods inward to
level.
achieve a stable 0 DPM SUR and stabilize
reactor power.
CUES:
The student may refer to ARP for directions to AOP-401.8.
UNSAT
COMMENTS:
CR
SEQ
STEP:
2
STEP STANDARD:
Yes Yes
Bypass the level trip for NI-35.
Positions the level trip switch for NI-35 to
the BYPASS position.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
3
STEP STANDARD:
No Yes
Verify IR & SR TRIP BYPASS annunciator
Observes IR&SR TRIP BYP annunciator
energizes.
(XCP-620-4-5) energizes by visual
observation and acknowledges alarm.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
4
STEP STANDARD:
No No
Check if Reactor Power is less than 7.5 x
Verifies Reactor Power is greater than 7.5
10E-6%.
x 10E-6%.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
5
STEP STANDARD:
No No
Verify P6 is bright,
Verifies P6 status light is illuminated.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
6
STEP STANDARD:
No No
Monitor the operable IRNI channel
Verifies NI-36 operating properly.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
7
STEP STANDARD:
No No
Ensure NR-45 selected to operable channel.
Selects NR-45 to NI-36 position and
verifies NI-35 is not selected.
CUES:
UNSAT
COMMENTS:
Examiner ends JPM at this point.
JPM QUESTIONS
JPM NO: JPS-029
DESCRIPTION:
LOSS OF INTERMEDIATE RANGE INSTRUMENTATION
IC SET:
INSTRUCTIONS:
COMMENTS:
V.C. SUMMER NUCLEAR STATION
JPM NO:
JPS-043
STUCK ROD
APPROVAL: DOW
APPROVAL DATE:
6/20/2002
REV NO:
4
CANDIDATE
EXAMINER:
THIS JPM IS APPROVED
TASK:
000-004-05-01
RESPOND TO CONTROL ROD MISALIGNMENT
TASK STANDARD:
The misaligned rod has been identified and control bank "D" has been aligned with the misaligned
PREFERRED EVALUATION LOCATION
PREFERRED EVALUATION METHOD
SIMULATOR
PERFORM
REFERENCES:
TOOLS:
EVALUATION TIME
15
TIME CRITICAL
No
10CFR55:
45(a)8
CANDIDATE:
TIME START:
TIME FINISH:
PERFORMANCE RATING:
SAT:
UNSAT:
QUESTION GRADE:
PERFORMANCE
EXAMINER:
SIGNATURE
DATE
COMMENTS:
OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING
CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED
AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I
WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE
INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB
PERFORMANCE MEASURE WILL BE SATISFIED.
INITIAL CONDITION:
Reactor power is being reduced from 75% at a rate of 1%/min.
INITIATING CUES:
CRS directs NROATC to perform the immediate and followup actions of
HAND THIS PAPER BACK TO YOUR
EVALUATOR WHEN YOU FEEL THAT YOU
HAVE SATISFACTORILY COMPLETED THE
ASSIGNED TASK.
STEPS
CR
SEQ
STEP:
1
STEP STANDARD:
Yes No
Rotate rod control bank selector switch to
Rotates the ROD CNTRL BANK SEL
MAN.
switch to the MAN position.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
2
STEP STANDARD:
No No
Stop any turbine load changes in progress.
Stops all turbine load changes by
depressing load set INCREASE pushbutton
until AT SET LOAD light illuminates.
CUES:
Spare operator may perform if directed.
UNSAT
COMMENTS:
CR
SEQ
STEP:
3
STEP STANDARD:
No No
Maintain Tavg-Tref within 5F.
Adjust turbine load to keep Tavg and Tref
within 5 degrees.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
4
STEP STANDARD:
No No
Monitor DRPI and step counter to identify
Monitors DRPI and determines that rod
misaligned control rod and affected control
K-10 in bank "D" is misaligned high from
rod bank.
other rods in bank "D".
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
5
STEP STANDARD:
No No
Record control rod data.
Records misaligned control rod
information; records control rod positions
and group step counter demands.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
6
STEP STANDARD:
No No
Record Control Rod positions and Group step
Records rod and group data.
counter demands.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
7
STEP STANDARD:
No No
Notify I&C Dept to investigate the cause of the
Notify I&C Department to investigate.
failure.
CUES:
If necessary, prompt operator to identify stuck rod. Examiner informs the operator UNSAT
that the CRS has recorded rod positions and made proper notifications.
COMMENTS:
CR
SEQ
STEP:
8
STEP STANDARD:
No No
Notify personnel and obtain information.
MDS, Rod Control Engineer, I&C, and
Reactor Engineering notified. Power level
and recovery rate obtained.
CUES:
Cue operator that CRS will notify MDS, Rod Control Sys Engineer, I&C, and Reactor
UNSAT
Engineering. Cue operator that power level for rod recovery is <75% and rate of
control rod movement is ó12 steps/minute. Cue operator I&C has determined there
is no electrical problem.
COMMENTS:
CR
SEQ
STEP:
9
STEP STANDARD:
Yes Yes
Rotate rod control bank selector switch CW to
Rotate ROD CNTRL BANK SEL switch to
the affected bank position.
the CBD position.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
10
STEP STANDARD:
Yes Yes
Drive the affected bank, 6 steps in the
Drives Bank "D" rods 6 steps OUT
direction the rod is misaligned while monitoring
(toward stuck rod).
DRPI.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
11
STEP STANDARD:
No Yes
Return affected bank to its original position.
Drives Band "D" rods 6 steps IN.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
12
STEP STANDARD:
Yes Yes
Determine if misaligned rod moved or failed to
Determines that rod K-10 failed to move.
move.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
13
STEP STANDARD:
Yes Yes
Rotate rod control bank selected switch CCW
Rotates ROD CNTRL BANK SEL switch to
to manual.
MAN.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
14
STEP STANDARD:
Yes Yes
Drive control bank to align with the misaligned
Drives control rod bank "D" out to align
with control rod K-10 (All Bank "D" rods at
same DRPI position).
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
15
STEP STANDARD:
No No
Determine if plant shutdown is required.
Determines plant shutdown is required.
CUES:
Prompt student for next action if not stated.
UNSAT
COMMENTS:
Examiner ends JPM at this point.
JPM QUESTIONS
JPM NO: JPS-043
DESCRIPTION:
STUCK ROD
IC SET:
INSTRUCTIONS:
COMMENTS:
V.C. SUMMER NUCLEAR STATION
JPM NO:
JPS-042
IDENTIFY AND ISOLATE RCS LEAK TO CCWS
APPROVAL: DOW
APPROVAL DATE:
6/20/2002
REV NO:
3
CANDIDATE
EXAMINER:
THIS JPM IS APPROVED
TASK:
344-001-03-02
ANALYZE INDICATIONS TO DETERMINE THAT ABNORMAL PLANT EVENT IS
IN PROGRESS
TASK STANDARD:
Intersystem leakage stopped by isolating letdown per ARP-019-XCP-644, pt 1-3.
PREFERRED EVALUATION LOCATION
PREFERRED EVALUATION METHOD
SIMULATOR
PERFORM
REFERENCES:
ARP-019-XCP-644
TOOLS:
EVALUATION TIME
15
TIME CRITICAL
No
10CFR55:
45(a)9
CANDIDATE:
TIME START:
TIME FINISH:
PERFORMANCE RATING:
SAT:
UNSAT:
QUESTION GRADE:
PERFORMANCE
EXAMINER:
SIGNATURE
DATE
COMMENTS:
OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING
CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED
AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I
WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE
INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB
PERFORMANCE MEASURE WILL BE SATISFIED.
INITIAL CONDITION:
The plant is operating at 100% power with all systems in Automatic.
INITIATING CUES:
CRS directs NROATC to respond to RM-L2A HI RAD annunciator.
HAND THIS PAPER BACK TO YOUR
EVALUATOR WHEN YOU FEEL THAT YOU
HAVE SATISFACTORILY COMPLETED THE
ASSIGNED TASK.
STEPS
CR
SEQ
STEP:
1
STEP STANDARD:
No No
Verify automatic action has occurred
Verifies green light ON for PVV-7096, CC
SURGE TK VLV.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
2
STEP STANDARD:
No No
Verify high radiation via COMPONENT
Identifies COMPONENT COOLING LIQUID
COOLING LIQUID MONITORS on XCP-644
MONITORS RML2A RADIATION MONITORS
meters and R/R-5 trending up and are
above high alarm setpoint on XCP-644.
CUES:
R/R-5 Is trending up and agrees with RML-2A.
UNSAT
COMMENTS:
CR
SEQ
STEP:
3
STEP STANDARD:
No No
Notify Health Physics personnel to survey
Instruct Health Physics personnel to check
CCW system.
radiation levels in CCW system in the
areas of letdown heat exchanger, RCS
and PZR sample coolers, RCP Thermal
Barrier lines, Excess Letdown Heat
Exchanger for abnormal radiation levels.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
4
STEP STANDARD:
No No
Notify Chemistry to sample CCW.
Notifies Chemistry to sample CCW system.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
5
STEP STANDARD:
No No
Monitor MCB indications for leak.
Checks no white lights on M1-CC and
M2-CC.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
6
STEP STANDARD:
Yes Yes
Determine leak is in Letdown Hx
NROATC announces leak is in letdown Hx
from MCB and RMS indications
CUES:
WHEN THE OPERATOR INDICATES THE LEAK LOCATION cue them that the CCW UNSAT
return line from LETDOWN HEAT EXCHANGER reads 400 mR/hr.
COMMENTS:
CR
SEQ
STEP:
7
STEP STANDARD:
No No
Places excess letdown in service per
HCV-137 indicates red light OFF, green
SOP-102
light ON. MVG-9583 indicates red light
ON, green light OFF. PVT-8153 and 8154
indicate red light ON, green light OFF.
Adjusts HCV-137 pot. as necessary.
CUES:
WHEN EXAMINEE DETERMINES LEAK IS IN LETDOWN HX CRS DIRECTS NROATC TO
UNSAT
PERFORM THE ACTION IN THE ARP TO ISOLATE LEAKAGE FROM THE LTDN HX
COMMENTS:
CR
SEQ
STEP:
8
STEP STANDARD:
Yes Yes
Closes PVT-8149A (B, C), LCV-460, LCV-459
PVT-8149A,B,C LTDN ORIFICE A,B,C ISOL
and PVT-8152
and LCV-459, 460 and PVT-8152 LTDN
LINE ISOL indicates red light OFF, green
light ON.
CUES:
ISOLATION OF LETDOWN FLOW PATH BY ANY ONE OF LCV-459, LCV-460, UNSAT
8149A/B/and C, IS SUFFICIENT TO ACCOMPLISH TASK.
COMMENTS:
CR
SEQ
STEP:
9
STEP STANDARD:
No No
Closes PCV-145
Places LO PRESS LTDN PCV-145 A/M
station in MANUAL and reduces output to
zero
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
10
STEP STANDARD:
No No
Closes FCV-122
Places CHG FLOW FCV-122 A/M station in
MANUAL and reduces output to zero
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
11
STEP STANDARD:
No No
Adjusts HCV-186 seal injection control valve
Adjusts INJ FLOW HCV-186 Hagan
to maintain 6-13 gpm per pump
potentiometer if necessary to keep RCP
A/B/C INJ FLOW GPM
(IFI-130A/127A/124A) between 6 and 13
CUES:
UNSAT
COMMENTS:
Examiner ends JPM at this point.
Monday, August 26, 2002
Page 7 of 9
JPM QUESTIONS
Monday, August 26, 2002
Page 8 of 9
JPM NO: JPS-042
DESCRIPTION:
IDENTIFY AND ISOLATE RCS LEAK TO CCWS
IC SET:
INSTRUCTIONS:
COMMENTS:
Monday, August 26, 2002
Page 9 of 9
V.C. SUMMER NUCLEAR STATION
JPM NO:
JPS-093
RESPOND TO IMMINENT PRESSURIZED THERMAL
SHOCK
APPROVAL:GAL
APPROVAL DATE:08/23/02
REV NO:
0
CANDIDATE
EXAMINER:
THIS JPM IS APPROVED
TASK:
000-098-05-01
RESPOND TO ANTICIPATED PRESSURIZED THERMAL SHOCK
TASK STANDARD:
Depressurize the RCS in accordance with EOP-16.0 through step 16.c. The use of applicable Human
Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc)
and industrial safety practices meets expectations.
PREFERRED EVALUATION LOCATION
PREFERRED EVALUATION METHOD
SIMULATOR
PERFORM
REFERENCES:
TOOLS:
EVALUATION TIME
15
TIME CRITICAL
NO
10CFR55:
45a8
CANDIDATE:
TIME START:
TIME FINISH:
PERFORMANCE RATING:
SAT:
UNSAT:
QUESTION GRADE:
PERFORMANCE
EXAMINER:
SIGNATURE
DATE
COMMENTS:
OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS: None
READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING
CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED
AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I
WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE
INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB
PERFORMANCE MEASURE WILL BE SATISFIED.
INITIAL CONDITION:
Plant was operating at 100% reactor power.
Events have occurred that resulted in three faulted S/Gs
EOP-16.0 is entered from EOP-12.0, Monitoring of Critical Safety
Functions
EOP-16.0 step 1 has been completed.
INITIATING CUES:
CRS directs NROATC to perform the actions of EOP-16.0 step 2 through
step 16.c.
HAND THIS PAPER BACK TO YOUR
EVALUATOR WHEN YOU FEEL THAT YOU
HAVE SATISFACTORILY COMPLETED THE
ASSIGNED TASK.
STEPS
CR
SEQ
STEP:
1
STEP STANDARD:
Yes Yes
Check RCS Tcold stable or increasing
Check RCS Tcold on TR-410.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
2
STEP STANDARD:
No Yes
Check PZR PORV Block Valves
Verify Power is available to the PZR
PORV BLOCK VALVES as indicated by
the position indicating lights on the
switches for MVG-8000A, B, C are
illuminated. At least one Block Valve Red
indicating light is lit and Green light is
extinguished.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
3
STEP STANDARD:
No Yes
Check if either XCP-6106 1-11 and 2-11 or
Indicating lights on XCP-6106 are verified.
XCP-6106 1-12 and 2-12 are bright.
CUES:
If monitor lights are not bright step 4 may be bypassed.
UNSAT
COMMENTS:
CR
SEQ
STEP:
4
STEP STANDARD:
No No
Verify RCS pressure is less than 450 psig.
Verify RCS pressure on at least one of
the following PI-402A, 402B, 403, PR-402.
CUES:
This step may be bypassed if step 3 monitor lights are not bright.
UNSAT
COMMENTS:
CR
SEQ
STEP:
5
STEP STANDARD:
No No
Verify PZR pressure is less than 2335 psig.
Verify PZR pressure on at least one of the
following PI-455, 456, 457, 444, 445,
PR-444.
CUES:
This step may be bypassed if monitor lights in step 3 are bright.
UNSAT
COMMENTS:
CR
SEQ
STEP:
6
STEP STANDARD:
No Yes
Ensure all PZR PORVs are closed.
The Green indicating lights on the PORV
switches are illuminated and the Red lights
are extinguished.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
7
STEP STANDARD:
No Yes
Verify SI flow on FI-943, CHG LOOP B
Flow is verified on FI-943.
CLD/HOT LG FLOW GPM.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
8
STEP STANDARD:
No Yes
Check if SI can be terminated.
Check is RCS subcooling on TI-499A(B) is
greater than 80 degrees. RVLIS level
indicated on LI-1311(1321) or
LI-1312(1322) is greater than; 0
RCPs=61%NR; 1 RCP=28%WR; 2
RCP=38%WR; 3RCP=83%WR.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
9
STEP STANDARD:
Yes Yes
Reset both SI Reset Train A(B) Switches.
Both SI Reset switches actuated, the SI
ACT light goes dim and the SI AUTO
BLOCK light illuminates.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
10
STEP STANDARD:
No No
Reset Containment Isolation.
Depress both the Train A and Train B
Phase A reset pushbuttons. Depress both
the Train A and Train B Phase B reset
pushbuttons.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
11
STEP STANDARD:
No No
Place both ESF Loading Seq A(B) Resets to;
Position Both ESF Loading Sequencer
switches to NON_ESF Lockout and
AUTO-START Blocks.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
12
STEP STANDARD:
Yes Yes
Establish Instrument Air to the RB.
Verify B Instrument Air Compressor is
running and direct unit 5 to reset the
relays on A Instrument Air Compressor.
Open PVA-2659, INST AIR TO RB AIR
SERV as indicated by the Red indicating
light illuminated and the Green indicating
light extinguished. Open PVT-2660, AIR
SPLY TO RB as indicated by the Red
indicating light illuminated and the Green
indicating light extinguished.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
13
STEP STANDARD:
Yes Yes
Stop the following SI Pumps and place in
Stop any RHR Pump operating in the SI
Standby.
mode as indicated by the Red light
extinguished and the Green light lit. Stop
all but one Charging Pump as indicated by
Only one Charging Pump Red indicating
light Lit.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
14
STEP STANDARD:
Yes Yes
Establish Normal Charging.
Close FCV-122 as indicated by the Red
closed indicating light on the manual
controller being illuminated. Open both
MVG-8107 and 8108 as indicated by the
Red open light illuminated and the Green
closed light extinguished. Adjust FCV-122
to obtain 60 gpm as indicated on FI-122.
Close both MVG-8801A(B) as indicated by
the Green indicating light lit and the Red
indicating light extinguished.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
15
STEP STANDARD:
Yes Yes
Verify SI flow is not required.
Check is RCS subcooling on TI-499A(B) is
greater than 30 degrees. RVLIS level
indicated on LI-1311(1321) or
LI-1312(1322) is greater than; 0
RCPs=61%NR; 1 RCP=28%WR; 2
RCP=38%WR; 3RCP=83%WR.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
16
STEP STANDARD:
Yes Yes
Verify RCS Thot is stable.
Verify RCS Thot as read on TR-413.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
17
STEP STANDARD:
Yes Yes
Isolate all SI Accumulators.
Checks if RCS subcooling on TI-499A(B)
is greater than 30 degrees. Checks if
RVLIS level indicated on LI-1311(1321) or
LI-1312(1322) is greater than; 0
RCPs=61%NR; 1 RCP=28%WR; 2
RCP=38%WR; 3RCP=83%WR. Directs IB
Operator to unlock and close the breakers
for the Accumulator Discharge Isolation
Valves XMC1DA2X 08AE - XVG8808A-SI
XMC1DA2X 08FJ - XVG08808C-SI
XMC1DB2Y 16IM - XVG8808B-SI ,
indicated by the position indicating lights
for the valves illuminating.
Close all the Accumulator Discharge
Isolation Valves as indicated by the Green
position indicating lights illuminated and
the Red indicating lights extinguished.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
18
STEP STANDARD:
Yes Yes
Depressurize the RCS to reduce subcooling.
Cycle one PZR PORV as necessary to
deprssurize the RCS using the MCB
control switch. Operate Charging Pumps
and valves as necessary to maintain RCS
subcooling greater than 30 degrees as
indicated on TI-499A(B).
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
19
STEP STANDARD:
Yes Yes
Continue depressurization until either of the
RCS Subcooling as indicated on
following are met;
TI-499A(B) is less than 40 degrees OR
PZR Level is greater than 68% (54%) as
indicated on LI-459A, 460, 461 OR RCS
pressure is less than 125 psig as
indicated on PI-402A, 402B, 403, PR-402
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
20
STEP STANDARD:
Yes Yes
Stop RCS depressurization.
Close any open PZR PORV as indicated
by the Green indicating lights being
illuminated and the Red indicating lights
extinguished.
CUES:
UNSAT
COMMENTS:
Examiner ends JPM at this point.
JPM QUESTIONS
JPM NO: JPS-093
DESCRIPTION:
RESPOND TO IMMINENT PRESSURIZED THERMAL SHOCK
IC SET:
INSTRUCTIONS:
COMMENTS:
V.C. SUMMER NUCLEAR STATION
JPM NO:
JPSF-019
MANUALLY INITIATE REACTOR BUILDING SPRAY
APPROVAL: TRH
APPROVAL DATE:
8/2/2002
REV NO:
6
CANDIDATE
EXAMINER:
THIS JPM IS APPROVED
TASK:
026-005-01-01
MANUALLY INITIATE REACTOR BUILDING SPRAY
TASK STANDARD:
At least one train of containment spray is manually actuated with >2500 gpm per EOP-1.0. RCPs are
secured due to Phase B actuation when directed by procedure. The use of applicable Human
Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc)
and industrial safety practices meets expectations.
PREFERRED EVALUATION LOCATION
PREFERRED EVALUATION METHOD
SIMULATOR
PERFORM
REFERENCES:
TOOLS:
EVALUATION TIME
5
TIME CRITICAL
NO
10CFR55:
45(a)8
CANDIDATE:
TIME START:
TIME FINISH:
PERFORMANCE RATING:
SAT:
UNSAT:
QUESTION GRADE:
PERFORMANCE
EXAMINER:
SIGNATURE
DATE
COMMENTS:
OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING
CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED
AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I
WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE
INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB
PERFORMANCE MEASURE WILL BE SATISFIED.
INITIAL CONDITION:
The reactor has tripped from 100% power and an SI has occurred.
INITIATING CUES:
The CRS directs the NROATC to perform step 8 of EOP-1.0.
HAND THIS PAPER BACK TO YOUR
EVALUATOR WHEN YOU FEEL THAT YOU
HAVE SATISFACTORILY COMPLETED THE
ASSIGNED TASK.
STEPS
CR
SEQ
STEP:
1
STEP STANDARD:
No No
Recognizes failure of RB spray to actuate.
Verifies RB pressure >12.05 PSIG, and RB
SPR ACT and PHASE B ISOL annunciator
are not lit.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
2
STEP STANDARD:
No No
Actuate RB Spray by placing both CS-SGA1
Places (CS-SGA1 and CS-SGA2) to the
and CS-SGA2 switches to ACTUATE
ACTUATE position.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
3
STEP STANDARD:
Yes No
Actuate RB spray by placing both CS-SGB1
Places (CS-SGB1 AND CS-SGB2) to the
and CS-SGB2 switches to ACTUATE.
ACTUATE position.
CUES:
If examinee attempts to operate the two train A switches (top pair), he should
UNSAT
recognize failure of spray to actuate and operate the Train B (bottom pair) of
switches.
NOTE: If examinee does not operate the Train B (bottom pair) of switches, then
steps 4 through 7 are critical steps.
COMMENTS:
CR
SEQ
STEP:
4
STEP STANDARD:
No No
Verify all RB spray, phase B isolation monitor
PHASE B Isol monitor lights are bright on
lights are bright.
XCP-6105.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
5
STEP STANDARD:
No No
Ensure MVG-3001A(B) RWST to spray pump
MVG-3001A&B indicates red light ON,
A(B) SUCT, are open.
green light OFF.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
6
STEP STANDARD:
No No
Ensure MVG-3002A(B) NAOH to spray pump
MVG-3002A&B indicates red light ON,
SUCT, are open.
green light OFF.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
7
STEP STANDARD:
No No
Ensure MVG-3003A(B) SPRAY HDR ISOL
MVG-3003A&B indicates red light ON,
LOOP are open.
green light OFF.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
8
STEP STANDARD:
Yes No
Ensure both RB spray pumps are running.
A&B RB Spray Pumps are running by red
light ON indication and normal running
amps.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
9
STEP STANDARD:
Yes No
Verify flow on FI-7368 & FI-7378 SPRAY PP
Verify on FI-7368, SPR PP A DISCH FLOW,
DISCH FLOW.
and FI-7378, SPR PP B DISCH FLOW, are
> 2500 gpm.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
10
STEP STANDARD:
Yes No
Stop all RCPs.
A, B, & C RCP indicate OFF by green light
ON and 0 running amps.
CUES:
UNSAT
COMMENTS:
Examiner ends JPM at this point.
Monday, August 26, 2002
Page 7 of 9
JPM QUESTIONS
Monday, August 26, 2002
Page 8 of 9
JPM NO: JPSF-019
DESCRIPTION:
MANUALLY INITIATE REACTOR BUILDING SPRAY
IC SET:
INSTRUCTIONS:
COMMENTS:
Monday, August 26, 2002
Page 9 of 9
V.C. SUMMER NUCLEAR STATION
JPM NO:
JPSF-046
TRANSFER IN-SERVICE CHARGING PUMP (NRC)
APPROVAL: DOW
APPROVAL DATE:
6/24/2002
REV NO:
1
CANDIDATE
EXAMINER:
THIS JPM IS APPROVED
TASK:
000-022-05-01
RESPOND TO LOSS OF REACTOR COOLANT MAKEUP (CHARGING)
TASK STANDARD:
'A' Charging pump running. 'C' Charging pump secured within one minute of the start of 'C' Charging
pump. The use of applicable Human Performance Tools (3-way communications, self checking, peer
checking, phonetic alphabet, etc) and industrial safety practices meets expectations.
PREFERRED EVALUATION LOCATION
PREFERRED EVALUATION METHOD
SIMULATOR
PERFORM
REFERENCES:
SOP-102
TOOLS:
EVALUATION TIME
5
TIME CRITICAL
NO
10CFR55:
45(a)8
CANDIDATE:
TIME START:
TIME FINISH:
PERFORMANCE RATING:
SAT:
UNSAT:
QUESTION GRADE:
PERFORMANCE
EXAMINER:
SIGNATURE
DATE
COMMENTS:
OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING
CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED
AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I
WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE
INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB
PERFORMANCE MEASURE WILL BE SATISFIED.
INITIAL CONDITION:
The plant is operating at 100% power. It is necessary to start "C"
charging pump on "A" Train in order to equalize run time.
INITIATING CUES:
CRS directs NROATC to place 'C' charging pump in service on 'A' train
and remove 'A' charging pump, per SOP-102,Section III.
HAND THIS PAPER BACK TO YOUR
EVALUATOR WHEN YOU FEEL THAT YOU
HAVE SATISFACTORILY COMPLETED THE
ASSIGNED TASK.
STEPS
CR
SEQ
STEP:
1
STEP STANDARD:
No Yes
Verify MCB lineup for aligning charging pump
Complete applicable (MCB) portions of
"C" to "A" Train.
SOP-102 Att. VA.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
2
STEP STANDARD:
No Yes
Verify local lineup for aligning charging pump
AB operator reports Attachment VA of
"C" to "A" Train.
SOP-102 complete with the exception of
charging pump breakers.
CUES:
Booth operator cues examinee that local lineup for aligning charging pump 'C' to 'A'
UNSAT
train per Attachment VA is complete with exception of charging pump breakers.
COMMENTS:
CR
SEQ
STEP:
3
STEP STANDARD:
Yes Yes
Directs IB operator to rack up "C" charging
IB operator reports "C" charging pump
pump on "A" train.
racked up on "A" train.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
4
STEP STANDARD:
No Yes
Ensure the Charging pump 'C' Auxiliary Oil
Verifies XPP-43C-PP1, CHG PP C AUX OIL
pump is running.
PP, switch in AUTO and red light ON.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
5
STEP STANDARD:
No Yes
Ensure 'A' Train CCW is operating per
Verifies that 'A' CCW pp is running via red
SOP-118.
light ON and amp indication.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
6
STEP STANDARD:
No Yes
Ensure 'A' Train chill water is running.
Verifies that 'A' Train Chill Water is running
via red light ON on 'A' Train Chiller and
Chill Water PP, and green light OFF.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
7
STEP STANDARD:
Yes Yes
Start 'C' charging pump.
"C" charging pump (Train A) indicates red
light ON, green light OFF, and normal
running amps.
CUES:
UNSAT
THIS IS THE START OF THE TIME CRITICAL PORTION RECORD
TIME_______________
COMMENTS:
CR
SEQ
STEP:
8
STEP STANDARD:
No No
Verify XPP-43C-PP1 stops automatically when
Verifies green OFF light is lit and red
charging pump comes up to full speed.
AUTO light is deenergized.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
9
STEP STANDARD:
No No
Monitor current and discharge pressure for
Ensures current between 30 and 50 amps
proper pump operation.
and ensures PI-121, CHG PRESS PSIG, is
between 2650 and 2850 psig.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
10
STEP STANDARD:
Yes Yes
Verifies CCW flow to 'C' charging pump.
XVG-9684C, CCW TO CHG PP C indicates
red light OFF, green light ON. CCW TO
CHG PP C VLV NOT FULL OPEN
annunciator in alarm.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
11
STEP STANDARD:
Yes Yes
Stops "C" charging pump.
Takes "C" charging pump switch to STOP
position. Verifies green light ON for BKR
OPEN indication on "C" charging pump
(within 1 minute).
CUES:
UNSAT
THIS IS THE END OF THE TIME CRITICAL PORTION RECORD TIME__________
COMMENTS:
CR
SEQ
STEP:
12
STEP STANDARD:
No No
Informs CRS of failure on 'C' charging pump.
Informs CRS of failure of CCW valve to 'C'
charging pump (XVG-9684C) to open.
CUES:
UNSAT
COMMENTS:
Examiner ends JPM at this point.
JPM QUESTIONS
JPM NO: JPSF-046
DESCRIPTION:
TRANSFER IN-SERVICE CHARGING PUMP (NRC)
IC SET:
INSTRUCTIONS:
COMMENTS:
V.C. SUMMER NUCLEAR STATION
JPM NO:
JPPF-012
LOCALLY START AN EMERGENCY D/G DURING A
LOSS OF OFFSITE POWER (WITH FAILURE OF FIELD TO
FLASH)
APPROVAL: DOW
APPROVAL DATE:
6/19/2002
REV NO:
7
CANDIDATE
EXAMINER:
THIS JPM IS APPROVED
TASK:
064-002-01-04
MANUALLY START A DIESEL GENERATOR LOCALLY
TASK STANDARD:
Diesel Generator 'A' is started locally with frequency 60 Hz and Voltage 7200 Volts. The use of
applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic
alphabet, etc) and industrial safety practices meets expectations.
PREFERRED EVALUATION LOCATION
PREFERRED EVALUATION METHOD
PLANT
SIMULATE
REFERENCES:
TOOLS:
EOP-6.0 ATTACHMENT 1
EVALUATION TIME
20
TIME CRITICAL
No
10CFR55:
45(a)8
CANDIDATE:
TIME START:
TIME FINISH:
PERFORMANCE RATING:
SAT:
UNSAT:
QUESTION GRADE:
PERFORMANCE
EXAMINER:
SIGNATURE
DATE
COMMENTS:
OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING
CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED
AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I
WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE
INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB
PERFORMANCE MEASURE WILL BE SATISFIED.
INITIAL CONDITION:
Diesel 'A' fails to start on a loss of AC power. EOP-6.0: Attachment 1,
Step 1 has been completed.
INITIATING CUES:
Control Room Operator directs starting the "A" D/G per Attachment 1 of
HAND THIS PAPER BACK TO YOUR
EVALUATOR WHEN YOU FEEL THAT YOU
HAVE SATISFACTORILY COMPLETED THE
ASSIGNED TASK.
STEPS
CR
SEQ
STEP:
1
STEP STANDARD:
No Yes
At the diesel generator local control panel,
Alarms and indications monitored on local
monitor the alarms and indications to
control panel, XCX-5201. START FAILURE
determine start failure (DG-436).
annunciator in alarm.
CUES:
Examiner informs operator that there is a "start failure" annunciator (Window 6-1) UNSAT
and the engine has not started. No other alarms are present. If asked about D/G air
and fuel parameters, inform operator that starting air tank pressure is 400#, fuel oil
system is normal and there are no flags on the relay panel.
COMMENTS:
CR
SEQ
STEP:
2
STEP STANDARD:
No Yes
Ensure VOLTAGE REGULATOR is in AUTO.
Operator verifies VOLTAGE REGULATOR
is in AUTO position.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
3
STEP STANDARD:
No Yes
Momentarily depress GEN RELAYS RESET
Operator depresses GEN RELAYS RESET
pushbutton.
pushbutton.
CUES:
Cue Operator that D/G did not start after GEN RELAYS RESET pushbutton is
UNSAT
depressed.
COMMENTS:
CR
SEQ
STEP:
4
STEP STANDARD:
No Yes
Notifies control room to place EXCITER Switch
Control Room notifies operator EXCITER
to RESET.
Switch placed in RESET position.
CUES:
Cue Operator that D/G did not start after EXCITER Switch taken to RESET by Control
UNSAT
Room.
COMMENTS:
CR
SEQ
STEP:
5
STEP STANDARD:
No Yes
Attempt to start the Diesel Generator by
START FAILURE annunciator clears. D/G
depressing the ENGINE SHUTDOWN RESET
engine does not start. START FAILURE
pushbutton
annunciator alarms 7 seconds after it
clears.
CUES:
Cue Operator that D/G did not start after the ENGINE SHUTDOWN RESET switch UNSAT
was placed in RESET by Control Room. Cue Operator the START FAILURE
annunciator clears, but reenergizes 7 seconds later.
COMMENTS:
CR
SEQ
STEP:
6
STEP STANDARD:
Yes Yes
Place REMOTE/LOCAL/MAINT Switch in
Local control switch indicates LOCAL .
LOCAL.
CUES:
This is critical because it permits local voltage adjustment. Since diesel did not start,
UNSAT
operator should go to Step 9. This is the alternative path aspect of this JPM.
COMMENTS:
CR
SEQ
STEP:
7
STEP STANDARD:
No Yes
Momentarily depress the EMERG START
EMERG START pushbutton depressed.
pushbutton.
CUES:
Cue operator that there is no change in indicators when the EMERG START
UNSAT
pushbutton is depressed.
COMMENTS:
CR
SEQ
STEP:
8
STEP STANDARD:
Yes Yes
Attempt to manual start using the Main Air
Operator engages spanner wrench and
Start Valve manual start (on either end of DG
depresses air start valve XVM-10996A or
Engine).
XVM-10996B for at least 5 seconds.
CUES:
Cue operator that engine is cranking, starts to accelerate within five seconds.
UNSAT
COMMENTS:
CR
SEQ
STEP:
9
STEP STANDARD:
No Yes
Observe diesel generator starts and
Operator observes tachometer. 'A' D/G
accelerates to 514 rpm.
tachometer indicates ~ 510 RPM.
CUES:
By pointing to the approximate center of the green band on the ENGINE
UNSAT
TACHOMETER, cue operator that the D/G engine RPM ~ 510 RPM.
Cue operator that READY FOR LOAD light is NOT lit if "REQUESTED".
COMMENTS:
CR
SEQ
STEP:
10
STEP STANDARD:
No Yes
Verifies D/G voltage 6840-7344 Volts.
D/G 'A' AC VOLTMETER indicates 0 Volts.
CUES:
Cue operator that the voltage and frequency are zero if requested. If operator
UNSAT
points to either VOLTMETER GENERATOR or VOLTMETER BUS to determine
voltage, always inform operator voltage is ZERO by pointing to 0 on gauge. (These
indicators do not work unless the SYNCHROSCOPE is ON.)
COMMENTS:
CR
SEQ
STEP:
11
STEP STANDARD:
Yes Yes
Momentarily rotate the FIELD FLASH Switch to
Operator rotates FIELD FLASH Switch to
FLASH.
FLASH. D/G 'A' AC Voltmeter indicates
6900 Volts.
CUES:
If operator correctly takes FIELD FLASH switch to FLASH, by pointing to just above
UNSAT
the bottom red mark, inform operator that voltage is 6900 V.
COMMENTS:
CR
SEQ
STEP:
12
STEP STANDARD:
No Yes
Depress EMERG START RESET Pushbutton.
EMERG START RESET Pushbutton
depressed.
CUES:
UNSAT
COMMENTS:
CR SEQ STEP: 13 STEP STANDARD:
No Yes
Reset annunciators on XCX-5201.
Annunciator reset pushbutton depressed
on XCX-5201.
CUES:
Cue operator that all alarms on XCX5201 are clear except LOCAL CONTROL.
UNSAT
COMMENTS:
CR
SEQ
STEP:
14
STEP STANDARD:
Yes Yes
Depress TEST START Pushbutton
Operator depresses TEST START
Pushbutton.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
15
STEP STANDARD:
Yes Yes
Verify D/G output breaker closed.
Verifies D/G 'A' breaker indicates red light
ON.
CUES:
Cue operator that breaker's red light is lit ONLY after the operator indicates he will UNSAT
check that indication.
COMMENTS:
CR
SEQ
STEP:
16
STEP STANDARD:
No Yes
Using the AUTO VOLTAGE CONTROL
Operator adjusts voltage control switch
RAISE-LOWER switch, adjust voltage to 7200
until voltage of approximately 7200 Volts
Volts.
is observed.
CUES:
Cue operator that voltage is 6900 V before adjustment and 7200 V after correct
UNSAT
adjustment.
COMMENTS:
CR
SEQ
STEP:
17
STEP STANDARD:
No Yes
Adjust frequency to 60 Hz using GOVERNOR
Operator positions governor switch to
RAISE-LOWER switch
raise to adjust frequency until 60 hz is
observed on the frequency meter.
CUES:
Cue operator that frequency is 59.5 Hz before adjustment and 60 Hz after correct UNSAT
adjustment.
COMMENTS:
Examiner ends JPM at this point.
JPM QUESTIONS
JPM NO: JPPF-012
DESCRIPTION:
LOCALLY START AN EMERGENCY D/G DURING A LOSS OF OFFSITE POWER
(WITH FAILURE OF FIELD TO FLASH)
IC SET:
INSTRUCTIONS:
COMMENTS:
V.C. SUMMER NUCLEAR STATION
JPM NO:
JPPF-049
(NRC EXAM MODIFIED VERSION OF JPPF-047)
CONTROL ROOM EVACUATION (DUTIES OF BOP
OPERATOR)
APPROVAL: TRH
APPROVAL DATE:
7/18/2002
REV NO:
0
CANDIDATE
EXAMINER:
THIS JPM IS APPROVED
TASK:
000-068-05-01
PERFORM CONTROL ROOM EVACUATION
TASK STANDARD:
AOP-600.1 ATT. II performed with the following complete: 1. All MFPs have been tripped, 2. Rod
Drive MG set feeder breakers have been tripped, 3. RCP "B" or "C" Breaker has been tripped ('A'
RCP is tripped already), 4. Two condensate pumps have been tripped, 5. Three FWBP's have been
tripped. The use of applicable Human Performance Tools (3-way communications, self checking, peer
checking, phonetic alphabet, etc) and industrial safety practices meets expectations.
PREFERRED EVALUATION LOCATION
PREFERRED EVALUATION METHOD
PLANT
SIMULATE
REFERENCES:
TOOLS:
AOP-600.1, ATT. II, STEPS 10-12
EVALUATION TIME
14
TIME CRITICAL
No
10CFR55:
45(a)13
CANDIDATE:
TIME START:
TIME FINISH:
PERFORMANCE RATING:
SAT:
UNSAT:
QUESTION GRADE:
PERFORMANCE
EXAMINER:
SIGNATURE
DATE
COMMENTS:
OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING
CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED
AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I
WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE
INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB
PERFORMANCE MEASURE WILL BE SATISFIED.
INITIAL CONDITION:
The plant is operating at 100% power, with all controls in automatic. A
bomb threat has been received in the control room. The SS has directed
a control room evacuation. AC power is available to both ESF Buses.
INITIATING CUES:
The Control Room Supervisor directs the BOP Operator to perform ATT. 2
of AOP-600.1, Steps 10 through 12.
HAND THIS PAPER BACK TO YOUR
EVALUATOR WHEN YOU FEEL THAT YOU
HAVE SATISFACTORILY COMPLETED THE
ASSIGNED TASK.
STEPS
CR
SEQ
STEP:
1
STEP STANDARD:
No Yes
Verifies reactor has been tripped.
Calls control room and verifies reactor has
been tripped.
CUES:
Examiner cues examinee that the reactor has been tripped.
UNSAT
COMMENTS:
CR
SEQ
STEP:
2
STEP STANDARD:
Yes Yes
Locally trip all MFPs (436' TB).
Pulls MFP "PULL TO TRIP" handle on front
standard for MFP's "A" "B" & "C". Verifies
trip by noting RPM decrease locally OR
trips MFPs from local DCS station.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
3
STEP STANDARD:
Yes Yes
Trips ROD DRIVE M/G SET "B" -
Trips rod drive MG set "B" bkr 06C at
XMG0001B-CR, XSW1B1 06C.
XSW-1B1 by pushing on red TRIP
pushbutton on left side on front of
breaker. Verifies a green "OPEN" flag
results and red light OFF, green light ON.
CUES:
Instructor provides feedback of "no change in status" if examinee indicates he/she UNSAT
would trip a 480V breaker using the TRIP Pushbutton on the right side of the
breaker. This p/b only works when the breaker is racked out to the "test" position.
COMMENTS:
CR
SEQ
STEP:
4
STEP STANDARD:
No Yes
Check status of XSW1A 06 FD WTR
Verifies that the "A" FWBP, bkr 06 is
BOOSTER PUMP A XPP0028A-FW breaker.
closed by observing red light on outside of
cubicle door.
CUES:
Examiner informs examinee that the "A" FWBP, bkr 06 red light is lit.
UNSAT
COMMENTS:
CR
SEQ
STEP:
5
STEP STANDARD:
No Yes
Checks status of XSW1A 09, Rx COOLANT
Checks RCP "A" breaker at XSW1A 09.
PUMP A XPP0030A-RC.
Verifies a green light on outside of cubicle
floor.
CUES:
Cue examinee that RCP "A" Bkr has a green light lit on front of cubicle. (Note: This
UNSAT
will "setup" alternate path portion of this JPM. Examinee will have to leave either 'B'
or 'C' RCP running in Step 12.6.)
COMMENTS:
CR
SEQ
STEP:
6
STEP STANDARD:
No Yes
Check status of XSW1A 07, COND PUMP A
Verifies that the "A" condensate pump bkr
XPP0042A-CO breaker.
07 is closed by observing red light on
outside of cubicle door.
CUES:
Examiner informs examinee that the "A" condensate pump breaker red light is lit. UNSAT
COMMENTS:
CR
SEQ
STEP:
7
STEP STANDARD:
Yes Yes
Trips XSW1B 09, COND PUMP B
Trips breaker XSW1B 09 for Cond Pump
XPP0042B-CO breaker.
"B" by pushing the "MANUAL TRIP" lever
on front of breaker (inside cubicle door).
Verifies a green light on outside of cubicle
door results.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
8
STEP STANDARD:
Yes Yes
Trips XSW1C 06, COND PUMP C
Trips bkr XSW1C 06 for Cond Pump "C" by
XPP0042C-CO breaker.
pushing the "MANUAL TRIP" lever on
front of breaker (inside cubicle door).
Verifies a green light on outside of cubicle
door results.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
9
STEP STANDARD:
Yes Yes
Trips XSW1B 06, FD WTR BOOSTER PUMP B Trips the FWBP "B" bkr 06 manually at
XPP0028B-FW breaker.
XSW-1B by pushing the "MANUAL TRIP"
lever on front of breaker (inside cubicle
door). Verifies a green light on outside of
cubicle door results.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
10
STEP STANDARD:
Yes Yes
Trips XSW1B 13, FD WTR BOOSTER PUMP D Trips the FWBP "D" bkr 13 manually at
XPP0028D-FW breaker.
XSW-1B by pushing the "MANUAL TRIP"
lever on front of breaker (inside cubicle
door). Verifies a green light on outside of
cubicle door results.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
11
STEP STANDARD:
Yes Yes
Trips XSW1C 08, FD WTR BOOSTER PUMP C Trips the FWBP "C" bkr 08 manually at
XPP0028C-FW breaker. the FWBP "C" breaker. XSW-1C by pushing the "MANUAL TRIP"
lever on front of breaker (inside cubicle
door). Verifies a green light on outside of
cubicle door results.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
12
STEP STANDARD:
Yes Yes
Trips XSW1B 07, Rx COOLANT PUMP B
Trips the RCP "B" bkr 07 at XSW-1B (OR
XPP0030B-RC "OR" XSW1C 03, Rx COOLANT RCP "C" bkr 03 at XSW-1C) by pushing the
PUMP C XPP0030C-RC breaker.
"MANUAL TRIP" lever on front of breaker
(inside cubicle door). Verifies a green
light on outside of cubicle door results.
CUES:
This is the alternative path portion of this JPM.
UNSAT
COMMENTS:
Examiner ends JPM at this point.
JPM NO: JPPF-049
DESCRIPTION:
(NRC EXAM MODIFIED VERSION OF JPPF-047) CONTROL ROOM EVACUATION
(DUTIES OF BOP OPERATOR)
IC SET:
INSTRUCTIONS:
COMMENTS:
V.C. SUMMER NUCLEAR STATION
JPM NO:
JPPF-NRC
ESTABLISH DEMINERALIZED WATER ALTERNATE
COOLING TO CHARGING PUMPS (FAILURE OF CHILLED
WATER SUPPLY).
APPROVAL: DOW
APPROVAL DATE:
6/19/2002
REV NO:
4
CANDIDATE
EXAMINER:
THIS JPM IS APPROVED
TASK:
004-001-04-04
ESTABLISH DEMINERALIZED WATER ALTERNATE COOLING TO CHARGING
PUMPS
TASK STANDARD:
Examinee has recognized the damage to the piping in chill water system. Demineralized Water alternate
cooling is provided to "B" charging pump in accordance with AOP-118.1, Attachment 2 and 2B. The
use of applicable Human Performance Tools (3-way communications, self checking, peer checking,
phonetic alphabet, etc) and industrial safety practices meets expectations.
PREFERRED EVALUATION LOCATION
PREFERRED EVALUATION METHOD
PLANT
SIMULATE
REFERENCES:
TOOLS:
AOP-118.1 ATT. 1, 1B, 2, and 2B
FLASHLIGHT
EVALUATION TIME
15
TIME CRITICAL
No
10CFR55:
45(a)12
CANDIDATE:
TIME START:
TIME FINISH:
PERFORMANCE RATING:
SAT:
UNSAT:
QUESTION GRADE:
PERFORMANCE
EXAMINER:
SIGNATURE
DATE
COMMENTS:
OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
READ TO OPERATOR:
WHEN I TELL YOU TO BEGIN, YOU ARE TO PERFORM THE ACTIONS AS DIRECTED IN THE INITIATING
CUES. I WILL DESCRIBE THE GENERAL CONDITIONS UNDER WHICH THIS TASK IS TO BE PERFORMED
AND PROVIDE THE NECESSARY TOOLS WITH WHICH TO PERFORM THIS TASK. BEFORE STARTING, I
WILL EXPLAIN THE INITIAL CONDITIONS, WHICH STEPS TO SIMULATE OR DISCUSS, AND PROVIDE
INITIATING CUES. WHEN YOU COMPLETE THE TASK SUCCESSFULLY, THE OBJECTIVE FOR THIS JOB
PERFORMANCE MEASURE WILL BE SATISFIED.
INITIAL CONDITION:
Total loss of Component Cooling Water with CRS implementing AOP-118.1
Chilled Water System, Demineralized Water System, and Fire Service
System are all available for CHG/SI pump alternate cooling per AOP-118.1
INITIATING CUES:
The CRS directs you, the ABLL watch, to establish alternate cooling to
the "B" Charging Pump, using chilled water per AOP-118.1, Attachment 1
and 1B.
HAND THIS PAPER BACK TO YOUR
EVALUATOR WHEN YOU FEEL THAT YOU
HAVE SATISFACTORILY COMPLETED THE
ASSIGNED TASK.
STEPS
CR
SEQ
STEP:
1
STEP STANDARD:
No Yes
Obtain cooling supply hoses and hose fittings
Cooling supply hose and connections
(AB-400)
obtained from dedicated gang box
(AB-400)
CUES:
Have operator point out hoses and discuss how the lines would be connected,
UNSAT
versus removing the equipment out of the Gang Box
COMMENTS:
CR
SEQ
STEP:
2
STEP STANDARD:
No No
Connect cooling supply hose to
Cooling supply hose connected to
IPX099062B-HR-VU, for 'B' Charging pump
IPX09062B-HR-VU, HIGH ROOT TO
(AB-400)
IPX9062B, (AB-400)
CUES:
When operator attempts to remove 3/4" female cap, prompt them that the pipe
UNSAT
shears flush with the insulation when pressure is applied to the cap for removal.
COMMENTS:
CR
SEQ
STEP:
3
STEP STANDARD:
No No
Operator determines that Chilled Water
Operator correctly determines that ATT. 1
System cannot be used due to damaged
and 1B are no longer appropriate.
connection.
CUES:
The operator should determine that the next viable option is to use Demineralized UNSAT
Water. They may either make that determination on their own, or simply report to
the Control Room of the problem encountered. If the Control Room is notified, the
operator should be cued to now use ATT 2 and 2B to supply the "B" Charging Pump
from Demineralized Water.
COMMENTS:
CR
SEQ
STEP:
4
STEP STANDARD:
No No
Obtain cooling supply hoses and hose fittings
Cooling supply hose and connections
to support Demineralized Water System
obtained from dedicated gang box
connection (AB-400)
(AB-400)
CUES:
Have operator point out hoses and discuss how the lines would be connected,
UNSAT
versus removing the equipment out of the Gang Box
COMMENTS:
CR
SEQ
STEP:
5
STEP STANDARD:
Yes Yes
Connect cooling supply hose to
Cooling supply hose connected to
XVT19647B-CC, for 'B' Charging pump
XVT19647B-CC, CHG PP B OIL CLR ALT
(AB-400)
CLG WTR SUPPLY VLV, (AB-400)
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
6
STEP STANDARD:
Yes Yes
Connect cooling supply hose to
Cooling supply hose connected to
XVT18783-DN, Demin WTR Washdown VLV
XVT18783-DN, AB DEMINERALIZED
WATER WASHDOWN VALVE, (AB-388 at
bottom of ladder to 400' level).
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
7
STEP STANDARD:
No Yes
Connect Drain Hose between CHG/SI pump
Drain hose connected to XVT19648B-CC,
return valve and floordrain (AB-400)
CHG PP B OIL CLR ALT CLG WTR RETURN
VLV, and directed to a floor drain.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
8
STEP STANDARD:
No Yes
Check XVG09657B-CC (AB-400) valve
Removes the locking device attempts to
position and record AS FOUND on attachment.
turn XVG0965BA-CC in the clockwise
direction and records valve position on the
attachment.
CUES:
The following steps pertain to completing valve lineup on Attachment 2B of
UNSAT
AOP-118.1. Cue examinee that XVG09657B-CC turns freely in the clockwise
direction.
COMMENTS:
CR
SEQ
STEP:
9
STEP STANDARD:
Yes Yes
Close XVG09657B-CC.
Closes XVG09657B-CC, CHG PP B OIL
CLR CCW INLET VLV by rotating the valve
handwheel fully in the clockwise
direction.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
10
STEP STANDARD:
No Yes
Check XVT19647B-CC (AB-400) valve
Attempts to turn XVT19647B-CC in the
position and record AS FOUND on attachment.
clockwise direction and records valve
position on the attachment.
CUES:
Cue examinee that XVT19647B-CC does not move in the clockwise direction.
UNSAT
COMMENTS:
CR
SEQ
STEP:
11
STEP STANDARD:
Yes Yes
Open XVT19647B-CC.
Opens XVT19647B-CC, CHG PP B OIL
CLR ALT CLG WTR SUPPLY VLV, by
rotating the valve handwheel fully in the
counter-clockwise direction.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
12
STEP STANDARD:
No Yes
Check XVT09685B-CC (AB-400) valve
Removes the locking device and attempts
position and record AS FOUND on attachment.
to turn XVT09685B-CC in the clockwise
direction.
CUES:
Cue examinee that XVT09685B-CC turns freely in the clockwise direction. Student UNSAT
may choose to determine throttled position of the valve. 3.75 turns open.
COMMENTS:
CR
SEQ
STEP:
13
STEP STANDARD:
Yes Yes
Close XVT09685B-CC.
Closes XVT09685B-CC, CHG PP B OIL
CLR CCW OUTLET VALVE, by rotating the
valve handwheel fully in the clockwise
direction.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
14
STEP STANDARD:
No Yes
Check XVT19648B-CC (AB-400) valve
Attempts to turn XVT19648B-CC in the
position and record AS FOUND on attachment.
clockwise direction.
CUES:
Cue examinee that XVT19648B-CC does not move in the clockwise direction.
UNSAT
COMMENTS:
CR
SEQ
STEP:
15
STEP STANDARD:
Yes Yes
Open XVT19648B-CC.
Opens XVT19648B-CC, CHG PP B OIL
CLR ALT CLG WTR RETURN VLV, by
rotating the valve handwheel in the fully
counter-clockwise direction.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
16
STEP STANDARD:
No Yes
Check XVT09530B-CC (AB-388) valve
Removes the locking device and attempts
position and record AS FOUND on attachment.
to turn XVT09530B-CC in the clockwise
direction.
CUES:
Cue examinee that XVT09530B-CC turns freely in the clockwise direction.
UNSAT
COMMENTS:
CR
SEQ
STEP:
17
STEP STANDARD:
Yes Yes
Close XVT09530B-CC.
Closes XVT09530B-CC, CCW SPLY TO
CHG PP B OIL CLR BYP VALVE, by
rotating the valve handwheel in the fully
clockwise direction.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
18
STEP STANDARD:
No Yes
Check XVT19654B-CC (AB-388) valve
Removes the locking device and attempts
position and record on attachment.
to turn XVT19654B-CC in the clockwise
direction.
CUES:
- Valve is in a contaminated area, but the valve can be simulated checked without UNSAT
entering contaminated area***Cue examinee that XVT19654B-CC turns freely in the
clockwise direction.
COMMENTS:
CR
SEQ
STEP:
19
STEP STANDARD:
Yes Yes
Open XVT19654B-CC.
Opens XVT19654B-CC, CHG/SI PUMP A
OIL CLR CLG WTR INLET VLV, by rotating
the valve handwheel in the fully
counter-clockwise direction.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
20
STEP STANDARD:
No Yes
Check XVT19655B-CC (AB-388) valve
Removes the locking device and attempts
position and record AS FOUND on attachment.
to turn XVT19655B-CC in the clockwise
direction.
CUES:
- Valve is in a contaminate area, but the valve can be simulated checked without UNSAT
entering the contaminate area.Cue examinee that XVT19655B-CC turns freely in the
clockwise direction. Student may choose to determine AS FOUND throttled
position. 1.0 turns open.
COMMENTS:
CR
SEQ
STEP:
21
STEP STANDARD:
Yes Yes
Open XVT19655A-CC.
Opens XVT19655A-CC, CHG/SI PUMP A
GB OIL CLR CLG WTR IN VLV, by rotating
the valve handwheel fully in the
counter-clockwise direction.
CUES:
UNSAT
COMMENTS:
CR
SEQ
STEP:
22
STEP STANDARD:
No Yes
Check XVT18783-DN (AB-388) valve position
Attempts to turn XVT18783-DN in the
and record AS FOUND on attachment.
clockwise direction.
CUES:
Cue examinee that XVT18783B-DN does not move in the clockwise direction.
UNSAT
COMMENTS:
CR
SEQ
STEP:
23
STEP STANDARD:
No Yes
Verify flow from the alternate cooling drain
Observes water flowing from
hose
XVT19648B-CC, CHG PP B OIL CLR ALT
CLG WTR RETURN VLV.
CUES:
Cue operator that clear water is flowing from XVT19648B-CC if previous steps to UNSAT
align system were performed per the performance standards.
COMMENTS:
CR
SEQ
STEP:
24
STEP STANDARD:
Yes Yes
Open XVT18783-DN.
Opens XVT18783-DN, AB
DEMINERALIZED WATER WASHDOWN
VALVE, by rotating the valve handwheel
fully in the counter-clockwise direction.
CUES:
UNSAT
COMMENTS:
Examiner ends JPM at this point.
JPM QUESTIONS
JPM NO: JPPF-NRC
DESCRIPTION:
ESTABLISH DEMINERALIZED WATER ALTERNATE COOLING TO CHARGING PUMPS
(FAILURE OF CHILLED WATER SUPPLY).
IC SET:
INSTRUCTIONS:
COMMENTS: