kA~h~-H-nLni - DRAFT REQUES5T FOR ADDITIONAL INFORMATION rc From:
Mohan Thadani To:
INTernet:pvflemi@nppd.com Date:
10/21/02 3:58PM
Subject:
DRAFT REQUEST FOR ADDITIONAL INFORMATION DRAFT REQUEST FOR ADDITIONAL INFORMATION ON THE SUPPLEMENTAL INFORMATION SUBMITTED BY NEBRASKA PUBLIC POWER DISTRICT FOR COOPER NUCLEAR STATION LICENSE CONDITION 2.C.(6)-DOCKET NO.: 50-298 In your submittal (Reference), you indicated that the "Collapsed Load Method", used for the stress analysis of the main steam line piping, is the same as the Equivalent Static Load Method identified in Section 3.9.2 of the NRC Standard Review Plan (SRP). It is our understanding that the Collapsed Load Method utilizes a factor of 1.0 to account for modal participation in the calculation of piping stresses for the main steam leakage piping under seismic loading condition. However, SRP Section 3.9.2 recommends that a factor of 1.5 is applied to the peak acceleration of the applicable floor response spectrum. We request your responses to the following:
a)
In your submittal, you referenced Appendix N, Article N-1225 of the ASME Boiler and Pressure Vessel Code,Section III, Division I. The NRC does not endorse Appendix N of the ASME Code. Provide your justification that the main steam leakage piping from the main steam isolation valves (MSIV) to the main turbine condenser and the turbine building can be realistically represented by a simple model and that your use of the Appendix N method for the analysis produces conservative results in termý of the piping responses (i.e., stress, deformation, etc.).
b)
Provide a discussion to show that the design and associated simplified analysis account for the relative motion between all points of support.
Reference:
Letter, Nebraska Public Power District to U.S. NRC, "Response to Request for Additional Information Related to Nebraska Public Power District's Seismic Reevaluation Proposed to address Cooper Nuclear Station License Condition 2.C.(6), Cooper Nuclear Station, NRC Docket No. 50-298, DPR-46," dated September 27, 2002.
Let me know if you would like to discuss this request for addtional information (RAI) over a conference call prior to responding to this RAI. Also advise if you prefer to receive a formal request of the above RAI.
Thanks.
Mohan Thadani CC:
Kamal Manoly; Yong Kim 8 Page I
CAW-N-DQWS\\TEMP\\GW)00*0-1.TMP Page 1 Mail Envelope Properties (3DB45C7F.ACE: 15: 21310)
Subject:
Creation Date:
From:
Created By:
DRAFT RiEQUEST FOR ADDITIONAL INFORMATION 10/21/02 3:58PM Mohan Thadani MCT@nrc.gov Recipients nppd.com pvflemi (INTemnet:pvflemi @nppd.com)
Action Transferred Date & Time 10/21/02 03:59PM nrc.gov owf2_po.OWFNDO KAM CC (Kamal Manoly)
Post Office owf2_po.OWFNDO Files MESSAGE Options Auto Delete:
Expiration Date:
Notify Recipients:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
To Be Delivered:
Status Tracking:
Size 3274 Delivered Opened Delivered 10/21/02 03:59PM Date & Time 10/21/02 03:58PM 10/21/02 03:59PM 10/21/02 04:1OPM Route nppd.com nrc.gov No None Yes Standard No None No Standard Immediate Delivered & Opened