ML022880018

From kanterella
Jump to navigation Jump to search

GE Request for Withdrawal of Proprietary Information from Public Disclosure Peach Bottom Atomic Power Station Unit 2 & 3
ML022880018
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/07/2002
From: Stramback G
General Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
MFN 02-068, NEDC-33064P, Rev 1, TAC MB5192, TAC MB5193
Download: ML022880018 (2)


Text

GE Nuclear Energy Nuclear Services 175 Curtner Ave M/C 747 San Jose, CA 95125 (408) 925-1913, Fax (408) 925-6710 E-mail george stramback@gene ge com MFN 02-068 October 7, 2002 U.S Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20852-2738 Attention:

Chief, Information Management Branch Program Management Policy Development and Analysis Staff

Subject:

GE Request for Withdrawal of Proprietary Information from Public Disclosure Peach Bottom Atomic Power Station Unit 2 & 3 (TAC Nos.

MB5192 & 5193)

Exelon, in the referenced letter, submitted Revision 1 to NEDC-33064P, Safety Analysis Report for Peach Bottom Atomic Power Station Units 2 & 3 Thermal Power Optimization (TSAR), which supports a request for a power uprate.

A proprietary and a non proprietary version of the TSAR were provided. GE, as the owner of Revision 0 of this information, requests that Revision 0 of both of the TSARs be withdrawn.

If you have any questions, please contact Ed Schrull at (408) 925-2224 or myself.

Sincerely, George Stramback Regulatory Services, Project Manager GE Nuclear Energy (408) 925-1913 george.stramback@gene.ge.com

MFN-02-068 Page 2

Reference:

1. Exelon letter, Submittal of Peach Bottom Atomic Power Station, Units 2 & 3, Safety Analysis Report, Revision 1, Appendix K Measurement Uncertainty Recovery Power Uprate (License Amendment Request 01-01190), dated September 24, 2002 cc:

SP Wall (NRC)

P Golub (Exelon)

JF Klapproth (GE/San Jose)

MJ Dick (GE/San Jose)

MA Lalor (GE/San Jose)

ED Schrull (GE/San Jose)