AmerGen AmerGen Energy Company, LLC An Exelon/British Energy Company Oyster Creek US Route 9 South P.O. Box 388 Forked River, NJ o8731-0388 May 9, 2002 2130-02-20136 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555
Dear Sir:
Subject:
Oyster Creek Nuclear Generating Station Docket No. 50-219 Monthly Operating Report - April 2002 Enclosed is the April 2002 Monthly Operating Report for the Oyster Creek Generating Station.
The content and format of information submitted in this report is in accordance with the guidance provided by Generic Letter 97-02.
If any additional information or assistance is required, please contact Mr. John Rogers of my staff at 609.971.4893.
Very truly yours, Ron J. '
regorio, Vice Pres Oyster Cree ating Station RJD/JJR Enclosure cc:
Administrator, Region I NRC Senior Project Manager Senior Resident Inspector
Appendix B Unit Shutdowns Docket No:
Date:
Completed By:
Telephone:
50-219 5/06/02 Roger Gayley (609) 971-4406 Reporting Period:
I F Forced Reason:
S Scheduled A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Licensing Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 2 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Other (Explain)
Summary:
During April, Oyster Creek generated 432,791 net MWh electric, which was 97.2% of its MDC rating.
April 2002 No.
Date Type* Duration Reason' Method of Cause & Corrective Action to (Hours)
Shutting Down Prevent Recurrence Reactor2 None
APPENDIX A Operating Data Report Docket No:
Date:
Completed By:
Telephone:
50-219 5/06/02 Roger Gayley (609) 971-4406 Reporting Period:
Design values have no "Year to Date" or "Cumulative" significance.
April 2002 YEAR TO MONTH DATE CUMULATIVE
- 1.
DESIGN ELECTRICAL RATING (MWe NET).
The nominal net electrical output of the unit specified by the utility and used for the purpose of plant design.
650
- 2.
MAXIMUM DEPENDABLE CAPACITY (MWe NET).
The gross electrical output as measured at the output terminals of the turbine generator during the most restrictive seasonal 619 conditions minus the normal station service loads.
- 3.
NUMBER OF HOURS REACTOR WAS CRITICAL.
The total number of hours during the gross hours of the reporting period that the reactor was critical.
719 2879 204,565.7
- 4.
HOURS GENERATOR ON LINE.
(Service Hours) The total number of hours during the gross hours of the reporting period that the unit operated with the breakers closed to the station bus. The sum of the hours that the generator 719 2879 200, 390.7 was on line plus the total outage hours should equal the gross hours in the reporting period.
- 5.
UNIT RESERVE SHUTDOWN HOURS.
The total number of hours during the gross hours of the reporting period that the unit was removed from service for economic or 0
0 918.2 similar reasons but was available for operation.
- 6.
NET ELECTRICAL ENERGY (MWH).
The gross electrical output of the unit measured at the output terminals ofthe turbine generator minus the normal station service 432,791 1,800,631 113,907,788 loads during the gross hours of the reporting period, expressed in megawatt hours. Negative quantities should not be used.