I*

SOUTHERN CALIFORNIA EDISON An EDISON h\\'TER,,VATIONALL' Company A Edward Scherer Manager of Nuclear Oversight and Regulatory Affairs May 13, 2002 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for April 2002 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:

As required by Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-1 5, this letter provides the Monthly Operating Report for San Onofre Nuclear Generating Station, Units 2 and 3. This report is required to provide the operating statistics, shutdown experience, and documentation of all challenges to pressurizer safety valves, for each unit. Attachments 1 and 2 provide the subject report for Units 2 and 3, respectively. There were no challenges to pressurizer safety valves for either Unit 2 or 3.

If you have any questions, please contact Mr. Clay E. Williams at (949) 368-6707.

Sincerely, Attachments 1 & 2 cc:

E. W. Merschoff, Regional Administrator, NRC Region IV A. B. Wang, NRC Project Manager, San Onofre Units 2 & 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 & 3 P. 0. Box 128 San Clemente, CA 92674-0128 949-368-7501 Fax 949-368-6085

<

-x NRC Monthly Operating Report, April 2002 San Onofre Nuclear Generating Station, Unit 2

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 April 2002 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-361 SONGS - 2 May 13, 2002 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT I

Design Electrical Rating (Net MWe) 1070 2

Maximum Dependable Capacity (Gross MWe) 1127 3

Maximum Dependable Capacity (Net MWe) 1070 This Month Yr-to-Date Cumulative 4

Number of Hours in Period 719 2,879 163,944 5

Number of Hours Reactor Was Critical

  • 719 2,879 132,267 6

Hours Generator On-line

  • 719 2,879 130,520 7

Unit Reserve Shutdown Hours

  • 0 0

0 8

Net Electrical Energy Generated (MWh)

  • 813,260 3,257,830 139,150,846
  • Rounded

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 April 2002 Docket No:

50-361 Unit Name:

SONGS - 2 Date:

May 13, 2002 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS (1) F-Forced S-Scheduled (2) Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Ucense Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

(3) Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4.-Continuation from Previous Month 5-Reduction in the Average Daily Power Level of more than 20% from the previous day 6-Other (Explain)

(4) IEEE Std 805-1984 (5) IEEE Std 803A-1983 Number N/A Date N/A Type (1)

N/A Duration (Hours)

N/A Reason (2)

N/A Method of shutting down reactor (3)

N/A LER No.

N/A System Code (4)

N/A Component Code (5)

N/A Cause and corrective action to prevent N/A recurrence

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 2 April 2002 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-361 SONGS - 2 May 13, 2002 C. E. Williams (949) 368-6707 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event 04/01/02 I0001 Mode 1, 99.8%(1) Reactor Power, 1187 MWe.

04/30/02 2400 Mode 1, 99.9%(') Reactor Power, 1188 MWe.

(1) 100% power equals 3438 MWt as revised by License Amendment approved on July 19, 2001.

NRC Monthly Operating Report, April 2002 San Onofre Nuclear Generating Station, Unit 3

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 April 2002 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-362 SONGS - 3 May 13, 2002 C. E. Williams (949) 368-6707 Page 2 of 4 OPERATING DATA REPORT 1

Design Electrical Rating (Net MWe) 1080 2

Maximum Dependable Capacity (Gross MWe) 1127 3

Maximum Dependable Capacity (Net MWe) 1080 This Month Yr-to-Date Cumulative 4

Number of Hours in Period 719 2,879 158,495 5

Number of Hours Reactor Was Critical

  • 719 2,805 129,696 6

Hours Generator On-line

  • 719 2,777 127,597 7

Unit Reserve Shutdown Hours

  • 0 0

0 8

Net Electrical Energy Generated (MWh)

  • 791,509 3,076,650 134,464,439
  • Rounded

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 April 2002 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-362 SONGS - 3 May 13, 2002 C. E. Williams (949) 368-6707 Page 3 of 4 UNIT SHUTDOWNS AND POWER REDUCTIONS (1) F-Forced S-Scheduled (2) Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

(3) Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction in the Average Daily Power Level of more than 20% from the previous day 6-Other (Explain)

(4) IEEE Std 805-1984 (5) IEEE Std 803A-1983 Number 2002-02 Date 02/04/27 Type (1)

S Duration (Hours) 48.4 Reason (2)

B Method of shutting down reactor (3) 5 LER No.

N/A System Code (4)

BI Component Code (5)

MO Circulating Water Pump 3P-1 15 Cause and corrective action to prevent replaced due to elevated motor stator recurrence temperature. Evaluation in progress.

USNRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 April 2002 Docket No:

Unit Name:

Date:

Completed by:

Telephone:

50-362 SONGS - 3 May 13, 2002 C. E. Williams (949) 368-6707 Page 4 of 4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time 04/01/02 0001 Mode 1, 99.9%(1) Reactor Power, 1172 MWe.

04/26/02 2113 Circulating Water Pump 3P-1 15 removed from service for motor replacement.

04/27/02 0108 Commenced down power to 75% Reactor Power 04/27/02 0525 Unit at 75% Reactor Power 04/27/02 2200 Commenced power ramp to 85% Reactor Power 04/28/02 0155 Unit at 85% Reactor Power 04/28/02 2110 Circulating Water Pump 3P-1 15 returned to service following motor replacement 04/28/02 2150 Commenced power ramp to 100% Reactor Power 04/29/02 0130 Unit at Full Power, 99.6% Reactor Power, 1171 MWe 04/30/02 2400 Mode 1, 99.8%(1) Reactor Power, 1169 MWe.

(1) 100% power equals 3438 MWt as revised by License Amendment approved on July 19, 2001.