Text
Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER April 12, 2002 Docket Nos.
AEP:NRC:2691-09 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units I and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit I and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for March 2002 is submitted.
Sincerely, ScotA.Gene Director, Nuclear Technical Services TKW/pae Attachments
" 1K V/
U. S. Nuclear Regulatory Commission AEP:NRC:2691-09 Page 2 c: ANI Nuclear Engineering Department G. P Arent A. C. Bakken, III L. Brandon - Department of Health G. T. Gaffney - Canton S. A. Greenlee S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock R. P. Powers M. W. Rencheck W. H. Schalk
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-315 DATE 4/5/02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.C. Cook Unit 1 Notes:
- 2. Reporting Period Mar-02
- 3. Licensed Thermal Power (MWt) 3250
- 4. Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020
- 6. Maximum Dependable Capacity(GROSS MWe, 1056
- 7. Maximum Dependable Capacity (Net MWe) 1000
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
Yr. to Date Cumm.
- 11. Hours in Reporting Period 744.0 2160.0 238848.0
- 12. No. of Hrs. Reactor Was Critical 744.0 2160.0 161681.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
- 14. Hours Generator on Line 744.0 2160.0 159065.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
- 16. Gross Therm. Energy Gen. (MWH) 2415917.4 6969222.0 472474529.0
- 17. Gross Elect. Energy Gen. (MWH) 792520.0 2283380.0 153516200.0
- 18. Net Elect. Energy Gen. (MWH) 767525.0 2210665.0 147744959.0
- 19. Unit Service Factor 100.0 100.0 67.1
- 20. Unit Availability Factor 100.0 100.0 67.1
- 21. Unit Capacity Factor (MDC Net) 103.2 102.3 63.3
- 22. Unit Capacity Factor (DER Net) 101.1 100.3 62.1
- 23. Unit Forced Outage Rate 0.0 0.0 19.7
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
Refueling outage 18 is scheduled to begin during the 2nd quarter of 2002. The proposed length of the outage is 35 days.
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
)
)
)
)
)
)
3 7
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 05-Apr-02 RAF Harris 616-465-5901 MONTH Mar-02 AVERAGE DAILY POWER LEVEL 1017 1020 1032 1035 1033 1029 1031 1032 1033 1033 1037 1029 1039 1027 1032 1033 DAY AVERAGE DAILY POWER LEVEL 3/17/02 3/18/02 3/19/02 3/20/02 3/21/02 3/22/02 3/23/02 3/24/02 3/25/02 3/26/02 3/27/02 3/28/02 3/29/02 3/30/02 3/31/02 1035 1033 1032 1035 1032 1029 1034 1034 1041 1028 1035 1030 1040 1022 1030 DAY 3/1/02 3/2/02 3/3/02 3/4/02 3/5/02 3/6/02 3/7/02 3/8/02 3/9/02 3/10/02 3/11/02 3/12/02 3/13/02 3/14/02 3/15/02 3/16/02
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit 1 April 11, 2002 TK Woods 616-466-2430 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - March 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE1 HOURS REASON2 REACTOR 3 REPORT NO.
CODE 4 CODE5 TO PREVENT RECURRENCE 1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-316 DATE 4/5/02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 2 Notes:
- 2. Reporting Period Mar-02
- 3. Licensed Thermal Power (MWt) 3411
- 4. Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090
- 6. Maximum Dependable Capacity(GROSS MWe 1100
- 7. Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
Yr. to Date
- 11. Hours in Reporting Period 744.0 2160.0
- 12. No. of Hrs. Reactor Was Critical 744.0 1261.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0
- 14. Hours Generator on Line 734.7 1185.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2367007.5 3710616.8
- 17. Gross Elect. Energy Gen. (MWH) 779420.0 1213960.0
- 18. Net Elect. Energy Gen. (MWH) 754705.0 1173914.7
- 19. Unit Service Factor 98.8 54.9
- 20. Unit Availability Factor 98.8 54.9
- 21. Unit Capacity Factor (MDC Net) 95.7 51.3
- 22. Unit Capacity Factor (DER Net) 93.1 49.9
- 23. Unit Forced Outage Rate 1.3 0.8
- 24. Shutdowns Scheduled over Next Six Months (TypeDateand Duration):
- 25. If Shut Down At End of Report Period, Ested Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Cumm.
212994.0 135366.5 0.0 131587.2 0.0 410537966.1 133040470.0 128238968.6 62.4 62.4 58.0 56.4 24.5
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 5-Apr-02 RAF Harris 616-465-5901 MONTH Mar-02 AVERAGE DAILY POWER LEVEL DAY 141 416 598 908 1022 1084 1102 1098 1097 1100 1104 1100 1058 1065 1072 1095 AVERAGE DAILY POWER LEVEL 3/17/02 3/18/02 3/19/02 3/20/02 3/21/02 3/22/02 3/23/02 3/24/02 3/25/02 3/26/02 3/27/02 3/28/02 3/29/02 3/30/02 3/31/02 1100 1101 1105 1099 1101 1105 1024 1027 1106 1104 1099 1107 1098 1106 1103 DAY 3/1/02 3/2/02 3/3/02 3/4/02 3/5/02 3/6/02 3/7/02 3/8/02 3/9/02 3/10/02 3/11/02 3/12/02 3/13/02 3/14/02 3/15/02 3/16/02
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 316 D.C. Cook Unit 2 April 11, 2002 TK Woods 616-466-2430 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - March 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE 1 HOURS REASON2 REACTOR 3 REPORT NO.
CODE 4 CODE 5 TO PREVENT RECURRENCE 341 020228 F
9.3 A
4 From Feb 28,2002 @ 23:13 hours to March 1, 2002 @ 09:16 hours, the generator was taken off-line and the reactor entered Mode 2 to make adjustments to SG stop valve 2-MRV 220.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source