Letter Sequence Supplement |
|---|
TAC:MD3002, Control Room Habitability (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0733004532003-11-27027 November 2003 Schedule and Response to PSEG Letter (LR-N07-0274) Dated October 23, 2007, Plans Related to Steam Dryer Evaluation Regarding Request for Extended Power Uprate Project stage: Other ML0626900642006-09-0101 September 2006 Attachment 26, C.D.I. Report No. 06-16NP, Rev 1, Estimating High Frequency Flow Induced Vibration in the Main Stream Lines at Hope Creek Unit 1: a Subscale Four Line Investigation of Standpipe Behavior Project stage: Request ML0626804512006-09-18018 September 2006 Request for License Amendment Extended Power Uprate Project stage: Request ML0626900442006-09-30030 September 2006 Attachment 21, C.D.I. Report No. 06-27, Rev 0, Stress Analysis of Hope Creek Unit 1 Steam Dryer at CLTP and EPU Conditions Using 1/8th Scale Model Pressure Measurement Data Project stage: Request ML0631101672006-09-30030 September 2006 Attachment 2 - CDI Technical Memo 06-23P (Non-Proprietary) Comparison of Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions, Revision 0, Dated September 2006 Project stage: Request LR-N06-0413, Supplement to License Amendment Request for Extended Power Uprate2006-10-10010 October 2006 Supplement to License Amendment Request for Extended Power Uprate Project stage: Supplement ML0628303692006-10-13013 October 2006 Supplement to Application for Extended Power Uprate Project stage: Other ML0629003222006-10-18018 October 2006 Extended Power Uprate Accpetance Review Results Project stage: Other LR-N06-0418, Supplement to License Amendment Request for Extended Power Uprate, to Increase the Maximum Authorized Power Level to 3840 Megawatts Thermal2006-10-20020 October 2006 Supplement to License Amendment Request for Extended Power Uprate, to Increase the Maximum Authorized Power Level to 3840 Megawatts Thermal Project stage: Supplement ML0628304722006-11-0808 November 2006 PSEG Nuclear LLC, Withholding from Public Disclosure, NEDC-33076P, Revision 2, Safety Analysis Report for Hope Creek Constant Pressure Power Uprate, Class III, MD3002 Project stage: Other ML0628304532006-11-21021 November 2006 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML0633301432006-12-15015 December 2006 11/13-14/2006 Summary of Category 1 Meeting with PSEG Nuclear LLC, Regarding Application for Extended Power Uprate for Hope Creek Project stage: Meeting LR-N07-0007, Response to the Request for Additional Information Regarding Resolution of NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power.2007-01-26026 January 2007 Response to the Request for Additional Information Regarding Resolution of NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. Project stage: Request ML0703002772007-01-26026 January 2007 E-Mail Shea-NRR,to Duke, PSEG, Group1 Draft EPU RAI Project stage: Draft Other ML0716303072007-01-31031 January 2007 C.D.I. Technical Note No. 07-01NP, EPU Conditions in the Main Steam Lines at Hope Creek Unit 1: Additional Subscale Four Line Tests Project stage: Request LR-N07-0034, C.D.I. Technical Memorandum No. 06-23NP, Revision 1, Comparison of the Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions2007-01-31031 January 2007 C.D.I. Technical Memorandum No. 06-23NP, Revision 1, Comparison of the Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions Project stage: Request LR-N07-0026, Supplemental to License Amendment Request for Extended Power Uprate2007-02-14014 February 2007 Supplemental to License Amendment Request for Extended Power Uprate Project stage: Supplement 05000354/LER-2006-005, Drywell Hoist Breaker Not Open Prior to Operational Condition 2 Entry2007-02-16016 February 2007 Drywell Hoist Breaker Not Open Prior to Operational Condition 2 Entry Project stage: Request ML0703304152007-02-16016 February 2007 Request for Additional Information Regarding Request for Extended Power Uprate Project stage: RAI LR-N07-0029, Supplement to License Amendment Request for Extended Power Uprate2007-02-16016 February 2007 Supplement to License Amendment Request for Extended Power Uprate Project stage: Supplement ML0706606192007-02-20020 February 2007 Draft Request for Additional Information Hope Creek EPU Grp 5 Project stage: Draft RAI ML0706601992007-02-20020 February 2007 Draft Request for Additional Information Hope Creek EPU Grp 4 Project stage: Draft RAI ML0704602432007-02-23023 February 2007 Ltr Request for Additional Information Related to the Request for Extended Power Uprate Project stage: RAI ML0706606382007-02-23023 February 2007 Draft Request for Additional Information Hope Creek EPU Grp 6 Project stage: Draft RAI ML0706803142007-02-28028 February 2007 Supplement to License Amendment Request for Extended Power Uprate Project stage: Supplement ML0708103652007-02-28028 February 2007 C.D.I. Report No. 07-01NP, Rev. 0, Revised Hydrodynamic Loads on Hope Creek Unit 1 Steam Dryer to 200 Hz Project stage: Request ML0706006112007-03-0202 March 2007 Request for Additional Information Regarding Request for Extended Power Uprate Project stage: RAI ML0709200252007-03-0202 March 2007 Slides for Summary of March 2, 2007 Meeting with PSEG Nuclear LLC on an Application for Extended Power Uprate for Hope Creek Generating Station Regarding Steam Dryer Margin Project stage: Meeting ML0706803062007-03-13013 March 2007 Request for Additional Information Regarding Request for Extended Power Uprate Project stage: RAI LR-N07-0055, Supplement to License Amendment Request for Extended Power Uprate2007-03-13013 March 2007 Supplement to License Amendment Request for Extended Power Uprate Project stage: Supplement LR-N07-0035, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-03-13013 March 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate Project stage: Response to RAI ML0708004302007-03-29029 March 2007 Summary of March 2, 2007, Meeting with PSEG Nuclear, LLC, on an Application for Extended Power Uprate for Hope Creek Generating Station Regarding Steam Dryer Margin Project stage: Meeting LR-N07-0060, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-03-30030 March 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0069, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-03-30030 March 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0070, Response to Request for Additional Information on Request for License Amendment - Extended Power Uprate2007-04-13013 April 2007 Response to Request for Additional Information on Request for License Amendment - Extended Power Uprate Project stage: Response to RAI LR-N07-0084, Supplement to License Amendment Request for Extended Power Uprate, Revised No Significant Hazards Consideration2007-04-18018 April 2007 Supplement to License Amendment Request for Extended Power Uprate, Revised No Significant Hazards Consideration Project stage: Supplement ML0711400912007-04-20020 April 2007 Request for Additional Information Regarding Request for Extended Power Uprate (TAC MD3002) - NON-PROPRIETARY Project stage: RAI LR-N07-0076, 2007 Annual Report - Guarantees of Payment of Deferred Premiums2007-04-30030 April 2007 2007 Annual Report - Guarantees of Payment of Deferred Premiums Project stage: Request ML0713603772007-04-30030 April 2007 C.D.I. Report No. 06-16NP, Rev. 2, Estimating High Frequency Flow Induced Vibration in the Main Steam Lines at Hope Creek, Unit 1: a Subscale Four Line Investigation of Standpipe Behavior Project stage: Request LR-N07-0099, Response to Request for Additional Information Request for License Amendment, Extended Power Uprate2007-04-30030 April 2007 Response to Request for Additional Information Request for License Amendment, Extended Power Uprate Project stage: Response to RAI ML0710104492007-05-0303 May 2007 Explanation of Hope Creek Nuclear Generating Station Extended Power Uprate and Conclusion of Informal Consultation Project stage: Other ML0712404872007-05-0909 May 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N07-0102, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-05-10010 May 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate Project stage: Response to RAI ML0712404112007-05-14014 May 2007 RAI, Request for Additional Information Regarding Request for Extended Power Uprate Project stage: RAI ML0712405052007-05-15015 May 2007 Summary of Meeting with PSEG Nuclear LLC, Regarding Technical Aspects of the Licensees Application for an Extended Power Uprate (EPU) at the Hope Creek Generating Station (Hope Creek) Project stage: Meeting ML0713707002007-05-17017 May 2007 Request for Additional Information (RAI) Regarding Request for Extended Power Uprate Project stage: RAI ML0712404612007-05-17017 May 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML0712405102007-05-17017 May 2007 PSEG Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance ML0628605302007-05-17017 May 2007 Nuclear LLC, Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N07-0123, Response to Request for Additional Information, Request for License Amendment - Extended Power Uprate2007-05-18018 May 2007 Response to Request for Additional Information, Request for License Amendment - Extended Power Uprate Project stage: Response to RAI 2007-02-23
[Table View] |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 0 PSEG Nuclear LLC 10 CFR 50.90 LR-N07-0029 LCR H05-01, Rev. 1 February 16, 2007 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Hope Creek Generating Station Facility Operating License No. NPF-57 NRC Docket No. 50-354
Subject:
Supplement to License Amendment Request for Extended Power Uprate
Reference:
- 1) PSEG letter LR-N06-0286, Request for License Amendment: Extended Power Uprate, September 18, 2006 In Reference 1, PSEG Nuclear LLC (PSEG) requested an amendment to Facility Operating License NPF-57 and the Technical Specifications (TS) for the Hope Creek Generating Station (HCGS) to increase the maximum authorized power level to 3840 megawatts thermal (MWt). to Reference 1, NEDC-33076P, Rev. 2, "Safety Analysis Report for Hope Creek Constant Pressure Power Uprate," included the results of the evaluation performed to demonstrate safe shutdown capability in compliance with the requirements of 10 CFR 50 Appendix R for extended power uprate (EPU) conditions. PSEG has revised the analysis of the Appendix R fire event for both current licensed thermal power (CLTP) and EPU to reflect a plant modification and a change in the time assumed for initiation of suppression pool cooling. A description of the analysis and the results are provided in Attachment 1 to this letter.
PSEG has determined that the information contained in this letter and attachments does not alter the conclusions reached in the 10CFR50.92 no significant hazards analysis previously submitted. contains information that General Electric Company (GE) considers to be proprietary. GE hereby requests that the proprietary information be withheld from public 4- 01 disclosure in accordance with the provisions of 10 CFR 2.390 and 9.17. An affidavit ko Dc 95-2168 REV. 7/99
\\
Ll`-N07-0029 LCR H05-01, Rev. 1 FEB 1 6 200?
Page 2 supporting this request is included with Attachment 1. Attachment 2 is a redacted version of Attachment 1 with the GE proprietary material removed and is suitable for public disclosure.
Should you have any questions regarding this submittal, please contact Mr. Paul Duke at 856-339-1466.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on (date)
George P. Barnes Site Vice President - Hope Creek Attachments (2) cc:
S. Collins, Regional Administrator - NRC Region I R. Ennis, Project Manager - Hope Creek, USNRC NRC Senior Resident Inspector - Hope Creek K. Tosch, Manager IV, NJBNE LR-N07-0029 LCR H05-01, Rev. I Hope Creek Generating Station Facility Operating License NPF-57 Docket No. 50-354 Supplement to Request for License Amendment Extended Power Uprate In Reference 1, PSEG Nuclear LLC (PSEG) requested an amendment to Facility Operating License NPF-57 and the Technical Specifications (TS) for the Hope Creek Generating Station (HCGS) to increase the maximum authorized power level to 3840 megawatts thermal (MWt). Attachment 4 to Reference 1 included the results of the evaluation performed to demonstrate safe shutdown capability in compliance with the requirements of 10 CFR 50 Appendix R for extended power uprate (EPU) conditions.
PSEG has revised the analysis of the Appendix R fire event for both current licensed thermal power (CLTP) and EPU to reflect a plant modification and a change in the time assumed for initiation of suppression pool cooling.
Previously, the Reactor Water Cleanup (RWCU) system blowdown isolation valves were disabled during plant operation by removing power to the valves to protect against the effect of a spurious opening and a loss of inventory event. De-energizing these valves limited plant operators' capability to quickly control reactor pressure vessel (RPV) level after a scram. The modification permits these valves to remain energized during plant operation. The Appendix R analysis was revised to account for inventory loss through a failed open blowdown valve, limited by a breakdown orifice installed upstream.
The Appendix R fire event analysis described in Attachment 4 to Reference 1 assumed that suppression pool cooling (SPC) would be initiated 20 minutes after the start of the event. The assumed time for SPC initiation was increased to 60 minutes for the reanalysis.
The description of the analysis and the results below replace section 6.7.1, "10 CFR 50 Appendix R Fire Event" and Table 6-4, "Hope Creek Appendix R Fire Event Evaluation Results" in Attachment 4 to Reference 1. Changes from the information provided in Reference 1 are marked by a revision bar in the margin.
Errata & Addenda No. 1, for NEDO-33076, Safety Analysis Report for Hope Creek Constant Pressure Power Uprate, January 5, 2007 6.7.1 10 CFR 50 Appendix R Fire Event A plant-specific evaluation was performed to demonstrate safe shutdown capability in compliance with the requirements of 10 CFR 50 Appendix R assuming CPPU conditions. The limiting Appendix R fire event was analyzed assuming CLTP and CPPU. The fuel heatup analysis was performed using the 1-LR-N07-0029 LCR H05-01, Rev. 1 SAFER/GESTR-LOCA analysis model. The containment analysis was performed using the SHEX model. This evaluation determined the effect of CPPU on fuel cladding integrity, reactor vessel integrity, and containment integrity as a result of the fire event.
The major operator actions for a limiting postulated Appendix R fire event using Remote Shutdown System (RSS) are described below:
- 1) One stuck SRV opens at time zero and remains open throughout the event;
- 2) RCIC injection occurs at 10 minutes by operator action from remote shutdown panel;
- 3) Suppression pool cooling is initiated at 60 minutes by operator action;
- 4) At 60 minutes, when the vessel pressure reaches 80 psig, the vessel water level is raised to the main steam line elevation using one RHR pump in LPCI mode. Alternate shutdown cooling is initiated when a SRV(s) is held open to allow water to flow to the suppression pool.
The above scenarios were developed based on the descriptions in the Hope Creek UFSAR and plant shutdown procedures.
The results of the Appendix R evaluation for CLTP and CPPU provided in Table 6-4 demonstrate that the fuel cladding integrity, reactor vessel integrity and containment integrity are maintained and that sufficient time is available for the operator to perform the necessary actions. No changes are necessary to the equipment required for safe shutdown for the Appendix R event. One train of systems remains available to achieve and maintain safe shutdown conditions from either the main control room or the remote shutdown panel. Therefore, CPPU has no adverse effect on the ability of the systems and personnel to mitigate the effects of an Appendix R fire event, and satisfies the requirements of Appendix R with respect to achieving and maintaining safe shutdown in the event of a fire.
LR-N07-0029 LCR H05-01, Rev. 1
'Table 6-4 Hope Creek Appendix R Fire Event Evaluation Results CLTP0)
__)
App. R Criteria Cladding Heatup (PCT) (°F)(2) 589 591
_-1500 Operator Action Time to Start RCIC 10 10 (3)
(minute)
Primary System Pressure (psig)(4) 1112.1 1119.9
< 1375 Primary Containment Pressure 9.3 11.1
Drywell Airspace Temperature (OF) 300.2 300.3
<_ 340 Suppression Pool Bulk Temperature 195.5 206.3
_< 310 (OF)
Net Positive Suction Head(5)
Yes Yes Adequate for system using designated water source (1) ((
(2) Initial steady-state fuel temperature (3) To maintain the core covered.
1]
(4) ((
(5) NPSH demonstrated adequate, see Section 4.2.6.
1]
References:
- 1.
PSEG letter LR-N06-0286, Request for License Amendment: Extended Power Uprate, September 18, 2006