LR-N05-0319, Technical Specification Bases Change S05-05B Re Radiation Monitoring Channels

From kanterella
Jump to navigation Jump to search
Technical Specification Bases Change S05-05B Re Radiation Monitoring Channels
ML052140420
Person / Time
Site: Salem  PSEG icon.png
Issue date: 07/22/2005
From: Benyak D
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N05-0319, S05-05B
Download: ML052140420 (7)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 O PSEG JUL 2 2 2005 Aluclear LLC LR-N05-0319 Bases Change S05-05B U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 TECHNICAL SPECIFICATION BASES CHANGE S05-05B SALEM GENERATING STATION UNIT NOS. I AND 2 FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 PSEG Nuclear, LLC (PSEG) has revised the Bases for Technical Specification (TS) 3/4.3.3.1. This change was reviewed in accordance with the requirements of the Technical Specification Bases Control Program and 10 CFR 50.59.

TS Bases 3/4.3.3.1 is being changed to provide additional clarifying information on radiation monitoring channels meeting the "Minimum Channels Operable" requirement.

Attachment I contains the revised pages for the Salem Unit 1 Technical Specification Bases. Attachment 2 contains the revised page for the Salem Unit 2 Technical Specification Bases. In accordance with the TS Bases Control Program, PSEG has incorporated these changes into the Bases.

Should you have any questions regarding this transmittal, please contact Mr. Paul Duke at (856) 339-1466.

Sincerely, Darin Benyak Director - Regulatory Assurance Attachments (2)

Ail 95-2168 REV. 7/99

Document Control Desk LR-N05-0319 JUL 2 2 2005 C

Mr. S. Collins, Administrator-Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. D. Collins, Project Manager - Hope Creek U. S. Nuclear Regulatory Commission Mail Stop 08C2 Washington, DC 20555 USNRC Senior Resident Inspector - Hope Creek (X24)

Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering PO Box 415 Trenton, NJ 08625

Attachment I LR-N05-031 9 Bases Change S05-05B SALEM GENERATING STATION UNIT NO. I FACILITY OPERATING LICENSE NO. DPR-70 DOCKET NO. 50-272 REVISIONS TO THE TECHNICAL SPECIFICATIONS BASES Page B 3/4 3-2 B 3/4 3-2a

INSTRUMENTATION BASES 3/4.3.3.1 RADIATION MONITORING INSTRUMENTATION (Continued)

CROSS REFERENCE -

TABLES 3.3-6 AND 4.3-3 T/S Table Instrument Description Acceptable RMs Item No.

Channels la Fuel Storage Area 1R5 or 1R9 lb Containment Area 1R44A and B 2ala Containment Gaseous Activity Purge &

IR12A or lR41A, Pressure/Vacuum Relief Isolation and Dt1) (2) 2alb Containment Gaseous Activity RCS Leakage lR12A Detection 2a2a (NOT USED) 2a2b Containment Air Particulate Activity RCS lRllA Leakage Detection 2bl Noble Gas Effluent Medium Range Auxiliary lR41B & D Building Exhaust System (Plant Vent) 2b2 Noble Gas Effluent High Range Auxiliary lR4lC & D )(4) (5 Building Exhaust System (Plant Vent) 2b3 Noble Gas Effluent Main Steamline Discharge -

1R46'6 )

Safety Valves and Atmospheric Steam Dumps 2b4 Noble Gas Effluent Condenser Exhaust System 1R15 3a Unit 1 Control Room Intake Channel 1 (to Unit lRlB-l 1 Monitor)

Unit 1 Control Room Intake Channel 2 (to Unit 2R1B-2 2 Monitor)

Unit 2 Control Room Intake Channel 1 (to Unit 2RlB-l 2 Monitor)

Unit 2 Control Room Intake Channel 2 (to Unit lRlB-2 1 Monitor)

Immediate action(s), in accordance with the LCO Action Statements, means that the required action should be pursued without delay and in a controlled manner.

I (1) The channels listed are required to be operable to meet a single operable channel for the Technical Specificiation's "Minimum Channels Operable" requirement.

(2) The setpoint applies to 1R41D.

The measurement range applies to lR41A and B which display in uCi/cc using the appropriate channel conversion factor from cpm to uCi/cc.

SALEM -

UNIT 1 B 3/4 3-2 June 29, 2005

INSTRUMENTATION BASES (3) 1R41D is the setpoint channel; 1R41B is the measurement channel.

(4) lR41D is the setpoint channel; lR41C is the measurement channel.

(5) The new release rate channel 1R41D setpoint value of 2E4 uCi/sec is within the bounds of the concentration setpoint values listed in Table 3.3-6 (originally for 1R45) for normal and accident plant vent flow rates.

(6) Channel 1R46E monitors the effluent from channels 1R46A-D and therefore provides redundancy for each steam line.

With one of the 1R46A-D channels inoperable, the 1R46E channel may be relied upon to meet the Technical Specification's "Minimum Channels Operable" requirement.

3/4.3.3.2 MOVABLE INCORE DETECTORS The OPERABILITY of the movable incore detectors with the specified minimum complement of equipment ensures that the measurements obtained from use of this system accurately represent the spatial neutron flux distribution of the reactor core. The OPERABILITY of this system is demonstrated by irradiating each detector used and normalizing its respective output.

The operability requirements of the movable incore detector system for the purposes of calibration of the PDMS is specified in Specification 3.3.3.14.

For the purpose of measuring FQ(Z) or F on, a full incore flux map or the PDMS is used. Quarter-core flux maps, as defined in WCAP-8648, June 1976, may be used in recalibration of the excore neutron flux detection system, and full incore flux maps or symmetric incore thimbles may be used for monitoring the QUADRANT POWER TILT RATIO when one Power Range Channel is inoperable.

3/4.3.3.3 THIS SECTION DELETED 3/4.3.3.4 THIS SECTION DELETED SALEM -

UNIT 1 B 3/4 2a June 29, 2005 LR-N05-0319 Bases Change S05-05B SALEM GENERATING STATION UNIT NO. 2 FACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311 REVISIONS TO THE TECHNICAL SPECIFICATIONS BASES Pane B 3/4 3-2

I INSTRUMENTATION BASES 4

3/4.3.3.1 RADIATION MONITORING INSTRUMENTATION (Continued)

CROSS REFERENCE -

TABLES 3.3-6 and 4.3-3 T/S Table Instrument Description Acceptable RMs Item No.

Channels la Fuel Storage Area 2R5 or 2R9 lb Containment Area 2R44A and B 2ala Containment Gaseous Activity Purge &

2R12A or 2R41A, Pressure/Vacuum Relief Isolation B and DI" (21 2alb Containment Gaseous Activity RCS Leakage 2R12A Detection 2a2a (NOT USED) 2a2b Containment Air Particulate Activity RCS 2RllA Leakage Detection 2bl Noble Gas Effluent Medium Range Auxiliary 2R45B 3 1 Building Exhaust System (Plant Vent) 2b2 Noble Gas Effluent High Range Auxiliary 2R45C"3 Building Exhaust System (Plant Vent) 2b3 Noble Gas Effluent Main Steamline Discharge -

2R46(4 )

Safety Valves and Atmospheric Steam Dumps 2b4 Noble Gas Effluent Condenser Exhaust System 2R15 3a Unit 2 Control Room Intake Channel 1 (to Unit 2RlB-l 2 Monitor)

Unit 2 Control Room Intake Channel 2 (to Unit lRlB-2 1 Monitor)

Unit 1 Control Room Intake Channel 1 (to Unit lRlB-l 1 Monitor)

Unit 1 Control Room Intake Channel 2 (to Unit 2R1B-2 2 Monitor)

(1) The channels listed are required to be operable to meet a single operable channel for the Technical Specification's "Minimum Channels Operable" requirement.

(2) For Modes 1, 2, 3, 4 & 5, the setpoint applies to 2R41D per Specification 3.3.3.9.

The measurement range applies to 2R41A and B which display in uCi/cc using the appropriate channel conversion factor from cpm to uci/cc.

(3) If 2R45 is out of service 2R41 may be used to meet the technical specification action requirement.

(4) Channel 2R46E monitors the effluent from channels 2R46A-D and therefore provides redundancy for each steam line.

With one of the 2R46A-D channels inoperable, the 2R46E channel may be relied upon to meet the Technical Specification's "Minimum Channels Operable" requirement.

SALEM UNIT 2 B 3/4 3-2 June 29, 2005